TXX-6330, Final Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 861015.Unconsolidated Concrete Repaired Per Established Site Procedures.Condition Not Reportable Per 10CFR50.55(e): Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ _ | {{#Wiki_filter:_ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ _. | ||
l' s | l ' | ||
s | |||
File.#10110 1 | = | ||
903.8 C | Log # TXX-6330 F-File.#10110 | ||
Ref #10CFR50.55(e) 1RIELECTRIC m,,, | ~~ | ||
1 903.8 C | |||
Ref #10CFR50.55(e) 1RIELECTRIC March 13, 1987 m,,, | |||
Unustw Elee hesiderts U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. | |||
20555 9 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 30: | Line 34: | ||
Specifically, the issue involves unconsolidated concrete identified on the exterior wall of Unit 2 Reactor Containment Building (RCB) at elevation 921 feet, azimuth 326 degrees. The deficiency was documented by Nonconformance Report Number NCR-C-86-201273. | Specifically, the issue involves unconsolidated concrete identified on the exterior wall of Unit 2 Reactor Containment Building (RCB) at elevation 921 feet, azimuth 326 degrees. The deficiency was documented by Nonconformance Report Number NCR-C-86-201273. | ||
During our evaluation, a review of the QA documentation related to the specified area was conducted. There was no evidence of a significant breakdown in the QA program. Additionally, an engineering analysis has concluded no condition adverse to the safety of plant operations or the structural integrity of the exterior wall would exist in the event the deficiency had remained uncorrected. | During our evaluation, a review of the QA documentation related to the specified area was conducted. There was no evidence of a significant breakdown in the QA program. Additionally, an engineering analysis has concluded no condition adverse to the safety of plant operations or the structural integrity of the exterior wall would exist in the event the deficiency had remained uncorrected. | ||
The unconsolidated concrete has been repaired in accordance with established site procedures. The issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this determination are available for your inspectors to review at the CPSES site. | The unconsolidated concrete has been repaired in accordance with established site procedures. The issue is not reportable under the provisions of 10CFR50.55(e). | ||
Records supporting this determination are available for your inspectors to review at the CPSES site. | |||
Very truly yours, b | Very truly yours, b | ||
W. G. Counsil By: | W. G. Counsil By:. | ||
G. S. Keeley | G. S. Keeley eg Manager, Nuclear Lfcensing JCH/ef | ||
$g s | |||
monme weet L n. 81 Danas texami Q | |||
0703170090 870313 PDR ADOCK 05000446 S | |||
PDR | |||
mg D | |||
TXX-6330 | |||
's March 13, 1987 Page 2 c-Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV l | |||
Outgoing Ccrrespondence bcc (3): | |||
M. D. Spence | M. D. Spence | ||
* INP0 | * INP0 | ||
* K. L. Scheppele A | * K. L. Scheppele A | ||
* R. E. Ballard | W. G. Counsil R. T. Jenkins H. C. Schmidt J. W. Beck R. A. Jones A. B. Scott R. P. Baker S. D. Karpyak B. C. Scott | ||
* L. K. Sterchi | * R. E. Ballard G. S. Keeley/ | ||
J. L. Barker | C. E. Scott E. Brabazon J. S. Marshall | ||
* R. P. Klause | * L. K. Sterchi J. L. Barker | ||
* W. R. Burchette | * R. P. Klause P. B. Stevens | ||
* J. H. Butts | * W. R. Burchette J. E. Krechting J. F. Streeter | ||
* J. H. Butts J. C. Kuykenall | |||
* B. Tartt R. D. Calder | * B. Tartt R. D. Calder | ||
* D. F. Landers | * D. F. Landers | ||
* J. L. Vota F. Camp | * J. L. Vota F. Camp | ||
* R. P. Lessey | * R. P. Lessey | ||
* E. L. Wagoner R. E. Camp | * E. L. Wagoner R. E. Camp | ||
* R. L. Cloud | : 0. W. Lowe H. M. Warren (2) | ||
* N. H. Williams J. R. Coombe | * R. L. Cloud D. M. McAcfee/ | ||
* R. E. McCaskill | * N. H. Williams J. R. Coombe P. E. Halstead D. R. Woodlan D. E. Deviney | ||
* R. E. McCaskill R. A. Wooldridge | |||
* L. Dietrich | * L. Dietrich | ||
* J. P. McGaughy | * J. P. McGaughy | ||
* T. G. Dignan D. D. Mosley | |||
* T. G. Dignan | |||
* J. Ellis | * J. Ellis | ||
* A. Muzzin l | * A. Muzzin l | ||
W. D. Fenoglio | W. D. Fenoglio L. D. Nace | ||
* B. Finkelstein | * B. Finkelstein PIMS J. C. Finneran L. E. Powell | ||
* J. Garibaldi | * J. Garibaldi R. L. Ramsey i | ||
J. B. George J. D. Redding R. L. Grubb D. M. Reynerson H. A. Harrison | |||
* N. S. Reynolds J. C. Hicks March 2, 1987 | * N. S. Reynolds J. C. Hicks March 2, 1987 | ||
* - First Class Mail | |||
- -}} | |||
Latest revision as of 20:45, 6 December 2024
| ML20207R308 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/13/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CP-86-65, TXX-6330, NUDOCS 8703170090 | |
| Download: ML20207R308 (3) | |
Text
_ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ _.
l '
s
=
Log # TXX-6330 F-File.#10110
~~
1 903.8 C
Ref #10CFR50.55(e) 1RIELECTRIC March 13, 1987 m,,,
Unustw Elee hesiderts U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 9
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-446 UNCONSOLIDATED CONCRETE-UNIT 2 RCB EXTERIOR WALL SDAR: CP-86-65 (FINAL REPORT)
Gentlemen:
On October 15, 1986, we verbally notified your Mr. I Barnes of a deficiency involving unconsolidated concrete in the exterior wall of CPSES unit 2 Reactor Containment Building. Our last interim report was logged TXX-6208, dated January 21, 1987.
Specifically, the issue involves unconsolidated concrete identified on the exterior wall of Unit 2 Reactor Containment Building (RCB) at elevation 921 feet, azimuth 326 degrees. The deficiency was documented by Nonconformance Report Number NCR-C-86-201273.
During our evaluation, a review of the QA documentation related to the specified area was conducted. There was no evidence of a significant breakdown in the QA program. Additionally, an engineering analysis has concluded no condition adverse to the safety of plant operations or the structural integrity of the exterior wall would exist in the event the deficiency had remained uncorrected.
The unconsolidated concrete has been repaired in accordance with established site procedures. The issue is not reportable under the provisions of 10CFR50.55(e).
Records supporting this determination are available for your inspectors to review at the CPSES site.
Very truly yours, b
W. G. Counsil By:.
G. S. Keeley eg Manager, Nuclear Lfcensing JCH/ef
$g s
monme weet L n. 81 Danas texami Q
0703170090 870313 PDR ADOCK 05000446 S
mg D
's March 13, 1987 Page 2 c-Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV l
Outgoing Ccrrespondence bcc (3):
M. D. Spence
- INP0
- K. L. Scheppele A
W. G. Counsil R. T. Jenkins H. C. Schmidt J. W. Beck R. A. Jones A. B. Scott R. P. Baker S. D. Karpyak B. C. Scott
- R. E. Ballard G. S. Keeley/
C. E. Scott E. Brabazon J. S. Marshall
- L. K. Sterchi J. L. Barker
- R. P. Klause P. B. Stevens
- W. R. Burchette J. E. Krechting J. F. Streeter
- J. H. Butts J. C. Kuykenall
- B. Tartt R. D. Calder
- D. F. Landers
- J. L. Vota F. Camp
- R. P. Lessey
- E. L. Wagoner R. E. Camp
- 0. W. Lowe H. M. Warren (2)
- R. L. Cloud D. M. McAcfee/
- N. H. Williams J. R. Coombe P. E. Halstead D. R. Woodlan D. E. Deviney
- R. E. McCaskill R. A. Wooldridge
- L. Dietrich
- J. P. McGaughy
- T. G. Dignan D. D. Mosley
- J. Ellis
- A. Muzzin l
W. D. Fenoglio L. D. Nace
- B. Finkelstein PIMS J. C. Finneran L. E. Powell
- J. Garibaldi R. L. Ramsey i
J. B. George J. D. Redding R. L. Grubb D. M. Reynerson H. A. Harrison
- N. S. Reynolds J. C. Hicks March 2, 1987
- - First Class Mail
- -