9 | 9 Log #.TXX-6789 Fi1e # 10118 | ||
= | |||
= | |||
Ref. # 10CFR2.201 nlELECTRIC September 30, 1987 | |||
. William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission ATTN: | |||
Document Control Desk Washington, DC 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 33: | Line 35: | ||
The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988. | The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988. | ||
Very truly yours, W | Very truly yours, W | ||
W. G. Counsil | W. G. Counsil i | ||
$[3kOOgg [ | |||
A | D | ||
G. S. Keeley Manager, Nuclear | / | ||
A By,, | |||
G. S. Keeley Manager, Nuclear ensing c - Mr. R. D. Martin, Region IV i | |||
ResidentInspectors,CPSES(3) o/ | |||
Il0 | |||
.soo nns ouve senvi a si vanas. rexas mot | |||
,}} | |||
Latest revision as of 04:59, 3 December 2024
| ML20235L570 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/30/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| EA-86-009, EA-86-9, TXX-6789, NUDOCS 8710050516 | |
| Download: ML20235L570 (1) | |
Text
_ ___ _ -
9 Log #.TXX-6789 Fi1e # 10118
=
=
Ref. # 10CFR2.201 nlELECTRIC September 30, 1987
. William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES).
DOCKET NOS. 50-445 AND 50-446 ENFORCEMENT ACTION (EA) NO. 86-09, APPENDIX B, ITEM I.B.5
REFERENCE:
(1) TUGCo Letter TXX-4946 from W. G. Counsil to J. M. Taylor dated August 4,1986 (2) TV Electric Letter TXX-6262 from W. G. Counsil to the NRC dated February 27, 1987 (3) TV Electric Letter TXX-6477 from W. G. Counsil to the NRC dated May 29, 1987 Gentlemen:
Reference (3) provided an update to a portion of our response to EA 86-09, Appendix B, Item I.B.5, in which it was stated that the Environmental Qualification (EQ) Verification Program for Unit I would be completed by October 1,1987. We have found it necessary to redefine the environment in a significant number of plant areas and our effort has increased accordingly.
The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988.
Very truly yours, W
W. G. Counsil i
$[3kOOgg [
D
/
A By,,
G. S. Keeley Manager, Nuclear ensing c - Mr. R. D. Martin, Region IV i
ResidentInspectors,CPSES(3) o/
Il0