{{#Wiki_filter:Duxe Powen GoMem P.O. IM)x 33180 CIIAMIA)TTE, N.O. 28242 II AL 11. TUCKEH                                                             TEtressont vu a emansmeers                                                         (704)073-4531
{{#Wiki_filter:Duxe Powen GoMem P.O. IM)x 33180 CIIAMIA)TTE, N.O. 28242 II AL 11. TUCKEH TEtressont vu a emansmeers (704)073-4531 October 21, 1982
  " " = = = = ' =                             October 21, 1982 Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms           E, C. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414 Control of IIcavy Loads, NUREG-0612
" " = = = = ' =
Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms E, C. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414 Control of IIcavy Loads, NUREG-0612


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
W. O. Parker, Jr. 's letter of July 1,1982 identified the schedule for submittal of the remaining information needed to resolve the concerns identified in Mr. Darrel G. Eisenhut's letter of December 22, 1980 and in NUREG-0612. At this time, the evaluation has not been completed.
W. O. Parker, Jr. 's letter of July 1,1982 identified the schedule for submittal of the remaining information needed to resolve the concerns identified in Mr. Darrel G. Eisenhut's letter of December 22, 1980 and in NUREG-0612. At this time, the evaluation has not been completed. It is our intention to provide the information requested in Sections 2.2 and 2.4 of Enclosure 2 to Mr. Eisenhut's letter by November 24, 1982.
It is our intention to provide the information requested in Sections 2.2 and 2.4 of Enclosure 2 to Mr. Eisenhut's letter by November 24, 1982.
Very truly yours, llal B. Tucker RWO/php cc:     Mr. P. K. Van Doorn
Very truly yours, llal B. Tucker RWO/php cc:
!            NRC Resident Inspector Catawba Nuclear Station
Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station
(
(
l Mr. James P. O'Reilly, Regional Administrator l             U. S. Nuclear Regulatory Commission l             Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Robert Guild, Esq.
l Mr. James P. O'Reilly, Regional Administrator l
Attorney-at-Law 314 Pall Mall Columbia, South Carolina 29201 Palmetto Alliance                                   hg 2135 Devine Street Columbia, South Carolina 29205 B210260201 821021                   "N PDR ADOCK 05000413 A                         PDR         I L}}
U. S. Nuclear Regulatory Commission l
Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Robert Guild, Esq.
Attorney-at-Law 314 Pall Mall Columbia, South Carolina 29201 hg Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 B210260201 821021 "N
PDR ADOCK 05000413 A
PDR I
L}}

Latest revision as of 19:17, 16 December 2024

Revises WO Parker Re Schedule for Submission of Info Needed to Resolve Concerns Identified in DG Eisenhut & NUREG-0612.Info Requested in Sections 2.2 & 2.4 of Encl 2 to Be Submitted by 821124
ML20065P567
Person / Time
Site: Catawba  
Issue date: 10/21/1982
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8210260201
Download: ML20065P567 (1)


Text

Duxe Powen GoMem P.O. IM)x 33180 CIIAMIA)TTE, N.O. 28242 II AL 11. TUCKEH TEtressont vu a emansmeers (704)073-4531 October 21, 1982

" " = = = = ' =

Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms E, C. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414 Control of IIcavy Loads, NUREG-0612

Dear Mr. Denton:

W. O. Parker, Jr. 's letter of July 1,1982 identified the schedule for submittal of the remaining information needed to resolve the concerns identified in Mr. Darrel G. Eisenhut's letter of December 22, 1980 and in NUREG-0612. At this time, the evaluation has not been completed.

It is our intention to provide the information requested in Sections 2.2 and 2.4 of Enclosure 2 to Mr. Eisenhut's letter by November 24, 1982.

Very truly yours, llal B. Tucker RWO/php cc:

Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station

(

l Mr. James P. O'Reilly, Regional Administrator l

U. S. Nuclear Regulatory Commission l

Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Robert Guild, Esq.

Attorney-at-Law 314 Pall Mall Columbia, South Carolina 29201 hg Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 B210260201 821021 "N

PDR ADOCK 05000413 A

PDR I

L