{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward | {{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x | ||
March 30, 2023 | |||
Overall Plan & Path Forward | Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch Overall Plan & Path Forward | ||
Proposal: | Completed Obtained Issue Public Develop Enf./SDP Develop Tabletops Alignment with Report on strategy and long-term at facilities NRC Mgt. on Tabletops Regional Panel oversight process Dec 2022PCC Proposal April/May 2023 Guidance 2026 Feb/Mar 2023 Fall 2023 | ||
Developed Conduct public Gather feedback Working Group meeting Develop from near-term recommendations Workshop with near-term oversight, update as for near-term Tabletop oversight necessary path forward sites/Industry guidance 2024-2026 Feb 2023 Stakeholders Summer 2023 Mar 2023 | |||
2 Proposal: | |||
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. | * Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. | ||
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making. | * Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making. | ||
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework. | * The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework. | ||
Evaluated Options Four options considered: | 3 Evaluated Options | ||
Four options considered: | |||
* Option 1 - Comprehensive Engineering Team Inspection (CETI) | * Option 1 - Comprehensive Engineering Team Inspection (CETI) | ||
(Internal Events, Flooding & Other Approved Hazards) | (Internal Events, Flooding & Other Approved Hazards) | ||
| Line 33: | Line 39: | ||
* Option 4 - OpE Smart Sample (OpESS) | * Option 4 - OpE Smart Sample (OpESS) | ||
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.). | Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.). | ||
WGs Recommended Inspection Enhancement | 4 WGs Recommended Inspection Enhancement | ||
* Step 1 (Near-term): OpE Smart Sample (OpESS+) | * Step 1 (Near-term): OpE Smart Sample (OpESS+) | ||
PROPOSED Inspection Procedures: | |||
.PROPOSED Inspection Procedures: | |||
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) | 71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) | ||
* 71111.13, Maintenance Risk Assessments and Emergent | * 71111.13, Maintenance Risk Assessments and Emergent W ork Control | ||
* 71111.18, Plant Modifications | * 71111.18, Plant Modifications | ||
* 71151, Performance Indicator Verification | * 71151, Performance Indicator Verification | ||
| Line 45: | Line 51: | ||
* 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026) | * 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026) | ||
* Step 1.A: Evolve/Update OpESS+ as needed. | * Step 1.A: Evolve/Update OpESS+ as needed. | ||
Proposed OpESS+ | 5 Proposed OpESS+ | ||
applicable and flexible to the Risk- | applicable and flexible to SFCP the Risk-InformedBalanced and graded approach. | ||
Initiatives in place. | Initiatives in place. | ||
Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete) | 50.69 OpESS+ NFPA 805 | ||
RIC T | |||
6 Near-term Actions - OpESS | |||
Obtained preliminary NRC Management endorsement of the WG recommendation (Complete) | |||
Obtain and address Industry and Public Feedback (Ongoing) | Obtain and address Industry and Public Feedback (Ongoing) | ||
Internal Communication/Awareness (Ongoing) | Internal Communication/Awareness (Ongoing) | ||
| Line 60: | Line 70: | ||
* Initiate Cross Regional Panel Process (Ongoing) | * Initiate Cross Regional Panel Process (Ongoing) | ||
* Develop Screening Guidance (Ongoing) | * Develop Screening Guidance (Ongoing) | ||
* More-than-Minor/Green Threshold criteria (Ongoing) | * More-than-Minor/Green Threshold criteria (Ongoing) | ||
Long-term Actions - ROP Update | 7 Long-term Actions - ROP Update | ||
Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry | Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027) | ||
* | Update SDP/Enforcement of PCC issues | ||
8 Planned Outreach Efforts | |||
Issue publicly available report on insights from Tabletops | |||
Continue to engage with public and industry | |||
* R O P B i-Monthly public meetings | |||
* Public workshops | * Public workshops | ||
* Industry meetings/interactions 9 | * Industry meetings/interactions | ||
9 Questions | |||
10}} | |||
Revision as of 01:39, 15 November 2024
| ML23088A076 | |
| Person / Time | |
|---|---|
| Issue date: | 03/30/2023 |
| From: | Lundy Pressley NRC/NRR/DRA/APOB |
| To: | |
| References | |
| Download: ML23088A076 (1) | |
Text
PRA Configuration Control Workshop Proposed Path Forward x
March 30, 2023
Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch Overall Plan & Path Forward
Completed Obtained Issue Public Develop Enf./SDP Develop Tabletops Alignment with Report on strategy and long-term at facilities NRC Mgt. on Tabletops Regional Panel oversight process Dec 2022PCC Proposal April/May 2023 Guidance 2026 Feb/Mar 2023 Fall 2023
Developed Conduct public Gather feedback Working Group meeting Develop from near-term recommendations Workshop with near-term oversight, update as for near-term Tabletop oversight necessary path forward sites/Industry guidance 2024-2026 Feb 2023 Stakeholders Summer 2023 Mar 2023
2 Proposal:
- Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
- Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
- The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
3 Evaluated Options
Four options considered:
- Option 1 - Comprehensive Engineering Team Inspection (CETI)
(Internal Events, Flooding & Other Approved Hazards)
Focused Engineering Inspection (FEI) / (71111.21N)
- Option 2 - Resident Inspector Baseline Procedures. All hazards.
- Option 3 - IMC 2515 Appendix C, Infrequent Inspection.
- Option 4 - OpE Smart Sample (OpESS)
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
4 WGs Recommended Inspection Enhancement
- Step 1 (Near-term): OpE Smart Sample (OpESS+)
.PROPOSED Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)
- 71111.13, Maintenance Risk Assessments and Emergent W ork Control
- 71111.18, Plant Modifications
- 71151, Performance Indicator Verification
- 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
- Step 1.A: Evolve/Update OpESS+ as needed.
5 Proposed OpESS+
applicable and flexible to SFCP the Risk-InformedBalanced and graded approach.
Initiatives in place.
50.69 OpESS+ NFPA 805
RIC T
6 Near-term Actions - OpESS
Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
Obtain and address Industry and Public Feedback (Ongoing)
Internal Communication/Awareness (Ongoing)
- Training and Communication with Inspectors (Ongoing)
Finalize OpESS guidance (Ongoing)
Enforcement / Significance Determination Process
- Initiate Cross Regional Panel Process (Ongoing)
- Develop Screening Guidance (Ongoing)
- More-than-Minor/Green Threshold criteria (Ongoing)
7 Long-term Actions - ROP Update
Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
Update SDP/Enforcement of PCC issues
8 Planned Outreach Efforts
Issue publicly available report on insights from Tabletops
Continue to engage with public and industry
- R O P B i-Monthly public meetings
- Public workshops
- Industry meetings/interactions
9 Questions