{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward   x March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch
{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x
March 30, 2023


Overall Plan & Path Forward Obtained                                    Develop Enf./SDP                Develop Completed                                    Issue Public Alignment with                                  strategy and                long-term Tabletops                                    Report on NRC Mgt. on                                    Regional Panel            oversight process at facilities                                  Tabletops PCC Proposal                                      Guidance Dec 2022                                  April/May 2023                                          2026 Feb/Mar 2023                                      Fall 2023 Conduct public                                    Gather feedback Developed meeting                  Develop                from near-term Working Group Workshop with              near-term            oversight, update as recommendations Tabletop                oversight                  necessary for near-term sites/Industry            guidance path forward                                                                2024-2026 Stakeholders            Summer 2023 Feb 2023 Mar 2023 2
Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch Overall Plan & Path Forward


Proposal:
Completed Obtained Issue Public Develop Enf./SDP Develop Tabletops Alignment with Report on strategy and long-term at facilities NRC Mgt. on Tabletops Regional Panel oversight process Dec 2022PCC Proposal April/May 2023 Guidance 2026 Feb/Mar 2023 Fall 2023
 
Developed Conduct public Gather feedback Working Group meeting Develop from near-term recommendations Workshop with near-term oversight, update as for near-term Tabletop oversight necessary path forward sites/Industry guidance 2024-2026 Feb 2023 Stakeholders Summer 2023 Mar 2023
 
2 Proposal:
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
3


Evaluated Options Four options considered:
3 Evaluated Options
 
Four options considered:
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
(Internal Events, Flooding & Other Approved Hazards)
(Internal Events, Flooding & Other Approved Hazards)
Line 33: Line 39:
* Option 4 - OpE Smart Sample (OpESS)
* Option 4 - OpE Smart Sample (OpESS)
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
4


WGs Recommended Inspection Enhancement
4 WGs Recommended Inspection Enhancement
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
PROPOSED Inspection Procedures:
 
.PROPOSED Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)
* 71111.13, Maintenance Risk Assessments and Emergent Work Control
* 71111.13, Maintenance Risk Assessments and Emergent W ork Control
* 71111.18, Plant Modifications
* 71111.18, Plant Modifications
* 71151, Performance Indicator Verification
* 71151, Performance Indicator Verification
Line 45: Line 51:
* 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
* 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
* Step 1.A: Evolve/Update OpESS+ as needed.
* Step 1.A: Evolve/Update OpESS+ as needed.
5


Proposed OpESS+
5 Proposed OpESS+
applicable and flexible to the Risk-Informed SFCP  Balanced and graded approach.
applicable and flexible to SFCP the Risk-InformedBalanced and graded approach.
Initiatives in place.
Initiatives in place.
50.69    OpESS+ NFPA 805 RICT 6


Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
50.69 OpESS+ NFPA 805
 
RIC T
 
6 Near-term Actions - OpESS
 
Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
Obtain and address Industry and Public Feedback (Ongoing)
Obtain and address Industry and Public Feedback (Ongoing)
Internal Communication/Awareness (Ongoing)
Internal Communication/Awareness (Ongoing)
Line 60: Line 70:
* Initiate Cross Regional Panel Process (Ongoing)
* Initiate Cross Regional Panel Process (Ongoing)
* Develop Screening Guidance (Ongoing)
* Develop Screening Guidance (Ongoing)
* More-than-Minor/Green Threshold criteria (Ongoing) 7
* More-than-Minor/Green Threshold criteria (Ongoing)


Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
7 Long-term Actions - ROP Update
Update SDP/Enforcement of PCC issues 8


Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry
Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
* ROP Bi-Monthly public meetings
Update SDP/Enforcement of PCC issues
 
8 Planned Outreach Efforts
 
Issue publicly available report on insights from Tabletops
 
Continue to engage with public and industry
* R O P B i-Monthly public meetings
* Public workshops
* Public workshops
* Industry meetings/interactions 9
* Industry meetings/interactions
 
9 Questions


Questions 10}}
10}}

Revision as of 01:39, 15 November 2024

Pcc - Workshop - Path Forward - March 30, 2023 - Final
ML23088A076
Person / Time
Issue date: 03/30/2023
From: Lundy Pressley
NRC/NRR/DRA/APOB
To:
References
Download: ML23088A076 (1)


Text

PRA Configuration Control Workshop Proposed Path Forward x

March 30, 2023

Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch Overall Plan & Path Forward

Completed Obtained Issue Public Develop Enf./SDP Develop Tabletops Alignment with Report on strategy and long-term at facilities NRC Mgt. on Tabletops Regional Panel oversight process Dec 2022PCC Proposal April/May 2023 Guidance 2026 Feb/Mar 2023 Fall 2023

Developed Conduct public Gather feedback Working Group meeting Develop from near-term recommendations Workshop with near-term oversight, update as for near-term Tabletop oversight necessary path forward sites/Industry guidance 2024-2026 Feb 2023 Stakeholders Summer 2023 Mar 2023

2 Proposal:

  • Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
  • Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
  • The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.

3 Evaluated Options

Four options considered:

  • Option 1 - Comprehensive Engineering Team Inspection (CETI)

(Internal Events, Flooding & Other Approved Hazards)

Focused Engineering Inspection (FEI) / (71111.21N)

  • Option 2 - Resident Inspector Baseline Procedures. All hazards.
  • Option 4 - OpE Smart Sample (OpESS)

Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).

4 WGs Recommended Inspection Enhancement

  • Step 1 (Near-term): OpE Smart Sample (OpESS+)

.PROPOSED Inspection Procedures:

71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)

  • 71111.13, Maintenance Risk Assessments and Emergent W ork Control
  • 71151, Performance Indicator Verification
  • 71152, Problem Identification and Resolution (PI&R)
  • Step 1.A: Evolve/Update OpESS+ as needed.

5 Proposed OpESS+

applicable and flexible to SFCP the Risk-InformedBalanced and graded approach.

Initiatives in place.

50.69 OpESS+ NFPA 805

RIC T

6 Near-term Actions - OpESS

Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)

Obtain and address Industry and Public Feedback (Ongoing)

Internal Communication/Awareness (Ongoing)

  • Training and Communication with Inspectors (Ongoing)

Finalize OpESS guidance (Ongoing)

Enforcement / Significance Determination Process

  • Initiate Cross Regional Panel Process (Ongoing)
  • Develop Screening Guidance (Ongoing)
  • More-than-Minor/Green Threshold criteria (Ongoing)

7 Long-term Actions - ROP Update

Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)

Update SDP/Enforcement of PCC issues

8 Planned Outreach Efforts

Issue publicly available report on insights from Tabletops

Continue to engage with public and industry

  • R O P B i-Monthly public meetings
  • Public workshops
  • Industry meetings/interactions

9 Questions