3F0285-07, Informs That Results of Review Conducted Per 840718 IE Bulletin 84-02, Failure of GE Type Hfa Relays in Use in Class 1E Safety Sys Will Not Be Available Until 850630: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-                                                                                                                                q I.
{{#Wiki_filter:q I.
n10 : <lil 35 nail l             February 6,1985
35 nail n10 : <lil l
!-              3F0285-07 Dr. J. N. Grace -
February 6,1985 3F0285-07 Dr. J. N. Grace -
Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323
Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323


==Subject:==
==Subject:==
    > Crystal Rivr.r Unit 3 Docket No. 30-302
> Crystal Rivr.r Unit 3 Docket No. 30-302
                            ' Operating License No. DPR-72 I.E. Bulletin 84-02 Revised Response 2 Failure of GE Type HPA Relays In Use In Class IE Safety Systems Dear $1r
' Operating License No. DPR-72 I.E. Bulletin 84-02 Revised Response 2 Failure of GE Type HPA Relays In Use In Class IE Safety Systems Dear $1r
              . On June 7,1984, Florida Power Corporation (FPC) responded to the subject I.E. Bulletin (3F0684-05). ' A revised response which incorporated additional information to clarify the actions taken by PPC to address the concerns in the bulletin was submitted on July 18,1984
. On June 7,1984, Florida Power Corporation (FPC) responded to the subject I.E. Bulletin (3F0684-05). ' A revised response which incorporated additional information to clarify the actions taken by PPC to address the concerns in the bulletin was submitted on July 18,1984
            ' (3F0784-12). That revised response Indicated that a review of past operating history and manufacturer's recommendations for relays used in simliar app!! cations as described in the bulletin, 'or relays with similar materials used for safety-related functions would be performed. The results of the review, along with any required corrective actions and l             schedules, were to be submitted to your office by February 28, 1985. However, due to t-             extenslie manpower required to prepare for the upcoming refueling outage at Crystal River t    Unit 3, this information will not be available until June 30, 1985. The information will be submitted to your office at that time.
' (3F0784-12). That revised response Indicated that a review of past operating history and manufacturer's recommendations for relays used in simliar app!! cations as described in the bulletin, 'or relays with similar materials used for safety-related functions would be performed.
!              Sincerely,-
The results of the review, along with any required corrective actions and l
o,
schedules, were to be submitted to your office by February 28, 1985. However, due to t -
, - ;-        G. R. Westafer Manager, Nuclear Operations -
extenslie manpower required to prepare for the upcoming refueling outage at Crystal River Unit 3, this information will not be available until June 30, 1985. The information will be t
Licensing and Fuel Management DG/ mig                                                       D                   2 DR l-             cc     Document Control Desk l                     U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Jg A i 0 GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Floride 33733 e 813-806 5151 1                                                                                                                                 ,}}
submitted to your office at that time.
Sincerely,-
o, G. R. Westafer Manager, Nuclear Operations -
Licensing and Fuel Management DG/ mig DR D
2 l-cc Document Control Desk l
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Jg A i 0 GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Floride 33733 e 813-806 5151 1
,}}

Latest revision as of 01:43, 13 December 2024

Informs That Results of Review Conducted Per 840718 IE Bulletin 84-02, Failure of GE Type Hfa Relays in Use in Class 1E Safety Sys Will Not Be Available Until 850630
ML20107M176
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/06/1985
From: Westafer G
FLORIDA POWER CORP.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3F0285-07, 3F285-7, IEB-84-02, IEB-84-2, NUDOCS 8503010182
Download: ML20107M176 (1)


Text

q I.

35 nail n10 : <lil l

February 6,1985 3F0285-07 Dr. J. N. Grace -

Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323

Subject:

> Crystal Rivr.r Unit 3 Docket No.30-302

' Operating License No. DPR-72 I.E.Bulletin 84-02 Revised Response 2 Failure of GE Type HPA Relays In Use In Class IE Safety Systems Dear $1r

. On June 7,1984, Florida Power Corporation (FPC) responded to the subject I.E. Bulletin (3F0684-05). ' A revised response which incorporated additional information to clarify the actions taken by PPC to address the concerns in the bulletin was submitted on July 18,1984

' (3F0784-12). That revised response Indicated that a review of past operating history and manufacturer's recommendations for relays used in simliar app!! cations as described in the bulletin, 'or relays with similar materials used for safety-related functions would be performed.

The results of the review, along with any required corrective actions and l

schedules, were to be submitted to your office by February 28, 1985. However, due to t -

extenslie manpower required to prepare for the upcoming refueling outage at Crystal River Unit 3, this information will not be available until June 30, 1985. The information will be t

submitted to your office at that time.

Sincerely,-

o, G. R. Westafer Manager, Nuclear Operations -

Licensing and Fuel Management DG/ mig DR D

2 l-cc Document Control Desk l

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Jg A i 0 GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Floride 33733 e 813-806 5151 1

,