3F0285-07, Informs That Results of Review Conducted Per 840718 IE Bulletin 84-02, Failure of GE Type Hfa Relays in Use in Class 1E Safety Sys Will Not Be Available Until 850630: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:q I. | ||
n10 : <lil | 35 nail n10 : <lil l | ||
February 6,1985 3F0285-07 Dr. J. N. Grace - | |||
Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323 | Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323 | ||
==Subject:== | ==Subject:== | ||
> Crystal Rivr.r Unit 3 Docket No. 30-302 | |||
' Operating License No. DPR-72 I.E. Bulletin 84-02 Revised Response 2 Failure of GE Type HPA Relays In Use In Class IE Safety Systems Dear $1r | |||
. On June 7,1984, Florida Power Corporation (FPC) responded to the subject I.E. Bulletin (3F0684-05). ' A revised response which incorporated additional information to clarify the actions taken by PPC to address the concerns in the bulletin was submitted on July 18,1984 | |||
' (3F0784-12). That revised response Indicated that a review of past operating history and manufacturer's recommendations for relays used in simliar app!! cations as described in the bulletin, 'or relays with similar materials used for safety-related functions would be performed. | |||
The results of the review, along with any required corrective actions and l | |||
o, | schedules, were to be submitted to your office by February 28, 1985. However, due to t - | ||
extenslie manpower required to prepare for the upcoming refueling outage at Crystal River Unit 3, this information will not be available until June 30, 1985. The information will be t | |||
Licensing and Fuel Management DG/ mig | submitted to your office at that time. | ||
Sincerely,- | |||
o, G. R. Westafer Manager, Nuclear Operations - | |||
Licensing and Fuel Management DG/ mig DR D | |||
2 l-cc Document Control Desk l | |||
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Jg A i 0 GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Floride 33733 e 813-806 5151 1 | |||
,}} | |||
Latest revision as of 01:43, 13 December 2024
| ML20107M176 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/06/1985 |
| From: | Westafer G FLORIDA POWER CORP. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3F0285-07, 3F285-7, IEB-84-02, IEB-84-2, NUDOCS 8503010182 | |
| Download: ML20107M176 (1) | |
Text
q I.
35 nail n10 : <lil l
February 6,1985 3F0285-07 Dr. J. N. Grace -
Regional Administrator, Region 11 Office of Inspection and Enforcement U. 5. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323
Subject:
> Crystal Rivr.r Unit 3 Docket No.30-302
' Operating License No. DPR-72 I.E.Bulletin 84-02 Revised Response 2 Failure of GE Type HPA Relays In Use In Class IE Safety Systems Dear $1r
. On June 7,1984, Florida Power Corporation (FPC) responded to the subject I.E. Bulletin (3F0684-05). ' A revised response which incorporated additional information to clarify the actions taken by PPC to address the concerns in the bulletin was submitted on July 18,1984
' (3F0784-12). That revised response Indicated that a review of past operating history and manufacturer's recommendations for relays used in simliar app!! cations as described in the bulletin, 'or relays with similar materials used for safety-related functions would be performed.
The results of the review, along with any required corrective actions and l
schedules, were to be submitted to your office by February 28, 1985. However, due to t -
extenslie manpower required to prepare for the upcoming refueling outage at Crystal River Unit 3, this information will not be available until June 30, 1985. The information will be t
submitted to your office at that time.
Sincerely,-
o, G. R. Westafer Manager, Nuclear Operations -
Licensing and Fuel Management DG/ mig DR D
2 l-cc Document Control Desk l
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Jg A i 0 GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Floride 33733 e 813-806 5151 1
,