Inspection Manual Change Notice 22-003,: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC INSPECTION MANUAL                                                 DRO Change Notice 22-003 DELETED:                                         TRANSMITTED:
{{#Wiki_filter:NRC INSPECTION MANUAL DRO Change Notice 22-003
Number                       Date               Number                       Date
 
: 1. IP 71004                     05/15/17           IP 71004                     02/09/22
DELETED: TRANSMITTED:
: 2. IP 35007                     12/08/16           IP 35007                     02/09/22
 
: 3. IMC 2201 App C               04/22/21           IMC 2201 App C               02/09/22 TRAINING:       No special training is required for any documents issued with this Change Notice.
Number Date Number Date
REMARKS:       IP 71004, "Power Uprate." Removes reference to mid-cycle meetings.
: 1. IP 71004 05/15/17 IP 71004 02/09/22
: 2. IP 35007 12/08/16 IP 35007 02/09/22
: 3. IMC 2201 App C 04/22/21 IMC 2201 App C 02/09/22
 
TRAINING: No special training is required for any documents issued with this Change Notice.
 
REMARKS: IP 71004, "Power Uprate." Removes reference to mid-cycle meetings.
Formatted to IMC 0040 (ML19352E640) requirements.
Formatted to IMC 0040 (ML19352E640) requirements.
IP 35007, "Quality Assurance Program Implementation During Construction and Pre-Construction Activities." Revised to include the NRC SER to incorporate the QA alternative of using the ILAC accreditation process in lieu of performing commercial-grade survey. Also included the SER to NEI that approves the use of NEI 14-05A, Rev. 1, which recognizes the 2017 edition of ISO/IEC-17025 as the basis for the ILAC accreditation process in lieu of performing commercial-grade survey. Also included editorial changes to reflect the updated Divisions and Branches.
 
IP 35007, "Quality Assurance Program Implementation During Construction and Pre-Construction Activities." Revised to include the NRC SER to incorporate the QA alternative of using the ILAC accreditation process in lieu of performing commercial-grade survey. Also included the SER to NEI that approves the use of NEI 14- 05A, Rev. 1, which recognizes the 2017 edition of ISO/IEC-17025 as the basis for the ILAC accreditation process in lieu of performing commercial-grade survey. Also included editorial changes to reflect the updated Divisions and Branches.
 
IMC 2201, Appendix C, "Generic, Special, and Infrequent Inspections." Added requirement to document the Regional Administrators authorization for conducting IMC 2201 App C inspections for consistency with IMC 2515.
IMC 2201, Appendix C, "Generic, Special, and Infrequent Inspections." Added requirement to document the Regional Administrators authorization for conducting IMC 2201 App C inspections for consistency with IMC 2515.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
DISTRIBUTION:
Standard Official Use Only (OUO)-Security-Related Information.
Standard Official Use Only (OUO)-Security-Related Information.
Please contact: _________________ Phone: ______________
Please contact: _________________ Phone: ______________
END Issue Date: 02/09/22                              1                                         22-003}}
 
END
 
Issue Date: 0 2/09/2 2 1 22-003}}

Revision as of 18:50, 18 November 2024

Inspection Manual Change Notice 22-003
ML22033A531
Person / Time
Issue date: 02/09/2022
From: Madeleine Arel
NRC/NRR/DRO/IRIB
To:
madeleine.arel@nrc.gov
Shared Package
ML22033A355 List:
References
CN 22-003
Download: ML22033A531 (1)


Text

NRC INSPECTION MANUAL DRO Change Notice 22-003

DELETED: TRANSMITTED:

Number Date Number Date

1. IP 71004 05/15/17 IP 71004 02/09/22
2. IP 35007 12/08/16 IP 35007 02/09/22
3. IMC 2201 App C 04/22/21 IMC 2201 App C 02/09/22

TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IP 71004, "Power Uprate." Removes reference to mid-cycle meetings.

Formatted to IMC 0040 (ML19352E640) requirements.

IP 35007, "Quality Assurance Program Implementation During Construction and Pre-Construction Activities." Revised to include the NRC SER to incorporate the QA alternative of using the ILAC accreditation process in lieu of performing commercial-grade survey. Also included the SER to NEI that approves the use of NEI 14- 05A, Rev. 1, which recognizes the 2017 edition of ISO/IEC-17025 as the basis for the ILAC accreditation process in lieu of performing commercial-grade survey. Also included editorial changes to reflect the updated Divisions and Branches.

IMC 2201, Appendix C, "Generic, Special, and Infrequent Inspections." Added requirement to document the Regional Administrators authorization for conducting IMC 2201 App C inspections for consistency with IMC 2515.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security-Related Information.

Please contact: _________________ Phone: ______________

END

Issue Date: 0 2/09/2 2 1 22-003