ML21188A037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ASW 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Auxiliary Saltwater (ASW) System LCO 3.7.8           Two ASW trains shall be OPERABLE.
{{#Wiki_filter:ASW 3.7.8 DIABLO CANYON - UNITS 1 & 2 3.7 PLANT SYSTEMS 3.7.8 Auxiliary Saltwater (ASW) System LCO 3.7.8 Two ASW trains shall be OPERABLE.
APPLICABILITY:       MODES 1, 2, 3, and 4.
APPLICABILITY:
ACTIONS CONDITION                     REQUIRED ACTION                       COMPLETION TIME A. One ASW train inoperable. A.1     ------------NOTE--------------
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ASW train inoperable.
A.1  
------------NOTE--------------
Enter applicable Conditions and Required Actions of LCO 3.4.6, RCS Loops - MODE 4, for residual heat removal loops made inoperable by ASW.
Enter applicable Conditions and Required Actions of LCO 3.4.6, RCS Loops - MODE 4, for residual heat removal loops made inoperable by ASW.
Restore ASW train to               -----------NOTE----------
Restore ASW train to OPERABLE status
OPERABLE status A Completion Time of 144 hours is applicable for ASW pump 1-1 on a one-time basis, for Unit 1 cycle 23.
-----------NOTE----------
72 hours B. Required Action and           B.1   Be in MODE 3.                     6 hours associated Completion AND Time of Condition A not met.                        B.2       -----------NOTE-----------
A Completion Time of 144 hours is applicable for ASW pump 1-1 on a one-time basis, for Unit 1 cycle 23.
72 hours B. Required Action and associated Completion Time of Condition A not met.
B.1 Be in MODE 3.
AND B.2  
-----------NOTE-----------
LCO 3.0.4.a is not applicable when entering MODE 4.
LCO 3.0.4.a is not applicable when entering MODE 4.
Be in MODE 4.                   12 hours DIABLO CANYON - UNITS 1 & 2                3.7-16         Unit 1 - Amendment No. 135, 200, 219, Unit 2 - Amendment No. 135, 201, 221}}
Be in MODE 4.
6 hours 12 hours 3.7-16 Unit 1 - Amendment No. 135, 200, 219, Unit 2 - Amendment No. 135, 201, 221}}

Latest revision as of 08:12, 29 November 2024

Attachment 1 TS_3_7_8 (Marked Up Pages)
ML21188A037
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/07/2021
From: Samson Lee
Plant Licensing Branch IV
To: Welsch J
Pacific Gas & Electric Co
Lee S, 301-415-3158
References
Download: ML21188A037 (1)


Text

ASW 3.7.8 DIABLO CANYON - UNITS 1 & 2 3.7 PLANT SYSTEMS 3.7.8 Auxiliary Saltwater (ASW) System LCO 3.7.8 Two ASW trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ASW train inoperable.

A.1


NOTE--------------

Enter applicable Conditions and Required Actions of LCO 3.4.6, RCS Loops - MODE 4, for residual heat removal loops made inoperable by ASW.

Restore ASW train to OPERABLE status


NOTE----------

A Completion Time of 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> is applicable for ASW pump 1-1 on a one-time basis, for Unit 1 cycle 23.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B. Required Action and associated Completion Time of Condition A not met.

B.1 Be in MODE 3.

AND B.2


NOTE-----------

LCO 3.0.4.a is not applicable when entering MODE 4.

Be in MODE 4.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours 3.7-16 Unit 1 - Amendment No. 135, 200, 219, Unit 2 - Amendment No. 135, 201, 221