ML20141F039: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
6 May 14, 1997 | 6 May 14, 1997 Mr. Samuel Collins | ||
Mr. Samuel Collins | ' Director, Region IV j | ||
U.S. Nuclear' Regulatory' Commission 611 RyaniPlaza Dr.., | |||
Arlington,- -TX 76011 | Suite 400 Arlington,- -TX 76011 | ||
:.i | |||
==Dear Mr. Collins:== | ==Dear Mr. Collins:== | ||
) | |||
Jul amended annual report of.the U.S.' Geological Survey TRIGA | Jul amended annual report of.the U.S.' Geological Survey TRIGA | ||
] | |||
reactor facility is. submitted in accordance with license | reactor facility is. submitted in accordance with license | ||
- conditions.. | |||
editorial.and others of more substance. The most significant- | This-report replaces the report submitted dated January 18, 1997 and includes a' number of corrections,.some editorial.and others of more substance. | ||
The most significant- | |||
releases'and the inclusion of staff dose information-through | -changes are the correction of a decimal error inothe Ar-41' releases'and the inclusion of staff dose information-through | ||
Sincerely, | -l 12/31/96. | ||
The facility docket number is 50-274. | |||
Sincerely, d4 p/ | |||
.+ | |||
-d | |||
/ | |||
. Tim DeBey Reactor Supervisor | |||
/ | |||
/ | |||
) | |||
1 l | 1 l | ||
' Enclosure I g,/ | |||
y Copy =to. | y Copy =to. | ||
/' Document. Control Desk (2) 1 | |||
= | |||
USNRC: | S Q-ngoO Mr. Blair Nicholas k | ||
USNRC: | |||
r 9705210'199 970514' | 611.Ryan Plaza Dr. Suite'400 J | ||
-Arlington LTX-176011-r 9705210'199 970514' L | |||
-PDR ADOCK 05000274 R | |||
PDR H | |||
,}} | |||
Latest revision as of 15:20, 11 December 2024
| ML20141F039 | |
| Person / Time | |
|---|---|
| Site: | U.S. Geological Survey |
| Issue date: | 05/14/1997 |
| From: | Timothy Debey INTERIOR, DEPT. OF, GEOLOGICAL SURVEY |
| To: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20141F044 | List: |
| References | |
| NUDOCS 9705210189 | |
| Download: ML20141F039 (1) | |
Text
_
6 May 14, 1997 Mr. Samuel Collins
' Director, Region IV j
U.S. Nuclear' Regulatory' Commission 611 RyaniPlaza Dr..,
Suite 400 Arlington,- -TX 76011
- .i
Dear Mr. Collins:
)
Jul amended annual report of.the U.S.' Geological Survey TRIGA
]
reactor facility is. submitted in accordance with license
- conditions..
This-report replaces the report submitted dated January 18, 1997 and includes a' number of corrections,.some editorial.and others of more substance.
The most significant-
-changes are the correction of a decimal error inothe Ar-41' releases'and the inclusion of staff dose information-through
-l 12/31/96.
The facility docket number is 50-274.
Sincerely, d4 p/
.+
-d
/
. Tim DeBey Reactor Supervisor
/
/
)
1 l
' Enclosure I g,/
y Copy =to.
/' Document. Control Desk (2) 1
=
S Q-ngoO Mr. Blair Nicholas k
USNRC:
611.Ryan Plaza Dr. Suite'400 J
-Arlington LTX-176011-r 9705210'199 970514' L
-PDR ADOCK 05000274 R
PDR H
,