ML20199F648: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:- -    - _        -  -              ._.        .._- -.                  .-.__.              -      - . -        - . .      -
{{#Wiki_filter:- -
Illinois Power C;mpany ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727
Illinois Power C;mpany ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727


Line 26: Line 26:


==Dear Mr. Sipek:==
==Dear Mr. Sipek:==
In a {{letter dated|date=December 9, 1997|text=letter dated December 9,1997}}, the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -
In a {{letter dated|date=December 9, 1997|text=letter dated December 9,1997}}, the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.
Sincerely, Original signed by:
Sincerely, Original signed by:
Jon B. Hopkins, Senior Project Manager Division of Reactor Projects ill/lV Project Directorate lll 3 Office of Nuclear Reactor Regulation Docket No. 50-461
Jon B. Hopkins, Senior Project Manager Division of Reactor Projects ill/lV Project Directorate lll 3 Office of Nuclear Reactor Regulation Docket No. 50-461
                                                                                                                              //
//


==Enclosure:==
==Enclosure:==
As stated                                                                                 a U      -
As stated aU cc w/ encl: See next page Distribution:
cc w/ encl: See next page Distribution:
Docket File Public PD33 r/f S. Black E. Adensam (EGA1)
Docket File                               Public PD33 r/f                                 S. Black E. Adensam (EGA1)                         M. Bugg
M. Bugg
              $ "7a"A"'Rm                                                             NRC FIE CBElCOPY DOCUMENT NAME: g:\clinton\rna0266.qa OFFICE DRPW/PDill-3                       E DRPW/PD111-3 E
$ "7a"A"'Rm NRC FIE CBElCOPY DOCUMENT NAME: g:\\clinton\\rna0266.qa OFFICE DRPW/PDill-3 E
                                                  .                            Al/
DRPW/PD111-3 E
NAME       EBarnhill 9M                     JHopkins     [f DATE       01/#198                           01/jh/98   ///
Al/
l                             OFFICIAL RECORD COPY 61                                             ,
NAME EBarnhill 9M JHopkins
P                              PDR
[f DATE 01/#198 01/jh/98 ///
l OFFICIAL RECORD COPY 61 P
PDR


    'lllinois Power Company
'lllinois Power Company ATTN: Joseph Sipek Direct:r Licensing P.O. Box 678 Clinton, Illinois 61727
-    ATTN: Joseph Sipek Direct:r Licensing
;    P.O. Box 678 Clinton, Illinois 61727


==SUBJECT:==
==SUBJECT:==
PROPOSED CHANGE TO THE CLINTON POWER STATION QUALITY                         '
PROPOSED CHANGE TO THE CLINTON POWER STATION QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NO. MA0266)
ASSURANCE PROGRAM DESCRIPTION (TAC NO. MA0266)


==Dear Mr. Sipek:==
==Dear Mr. Sipek:==
In a leder dated December 9,1997, the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Maneger -
In a leder dated December 9,1997, the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Maneger -
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.
Line 59: Line 56:
==Enclosure:==
==Enclosure:==
As stated cc w/ encl: See next page Distribution:
As stated cc w/ encl: See next page Distribution:
Docket File                 Public PD33 r/f                     S. Black E. Adensam (EGA1)           M. Bugg J. Hopkins G. Grant, Rlll DOCUMENT NAME: g:\clinton\ma0266.qa OFFICE DRPW/PDill-3         E   DRPW/PD1113 E Al/   _
Docket File Public PD33 r/f S. Black E. Adensam (EGA1)
NAME       EBarnhill 9/[         JHopkins     //
M. Bugg J. Hopkins G. Grant, Rlll DOCUMENT NAME: g:\\clinton\\ma0266.qa OFFICE DRPW/PDill-3 E
DATE       0161/98               01tJb/98 ///
DRPW/PD1113 E
Al/
NAME EBarnhill 9/[
JHopkins
//
DATE 0161/98 01tJb/98 ///
OFFICIAL RECORD COPY 4
OFFICIAL RECORD COPY 4
 
* o UNITE 3 STATES NUCLEAR REGULATORY COMMISSION
                      *o                               UNITE 3 STATES
<1 d
<1 d *              '              NUCLEAR REGULATORY COMMISSION WASHINGTON, o.C. nam aaat
WASHINGTON, o.C. nam aaat
        *****l                                         January 26, 1998 lilinois Power Company ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727
'% *****l January 26, 1998 lilinois Power Company ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727


==SUBJECT:==
==SUBJECT:==
Line 72: Line 74:


==Dear Mr. Sipok:==
==Dear Mr. Sipok:==
I in a letter dated Decemoer 9,1997, the lilinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitrnents made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -
I in a letter dated Decemoer 9,1997, the lilinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitrnents made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The attached Safety Evaluation provides our assessment of the requested i
Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The attached Safety Evaluation provides our assessment of the requested i
change.
change.
Sincerely, t
Sincerely, t
                                                                        /           /
/
/
on B. Hopkins, Sen or roject Manager Division of Reactor Projects lil/IV Project Directorate 1113 Office of Nuclear Reactor Regulation Docket No. 50-461
on B. Hopkins, Sen or roject Manager Division of Reactor Projects lil/IV Project Directorate 1113 Office of Nuclear Reactor Regulation Docket No. 50-461


Line 84: Line 86:
cc w/ encl: See next page
cc w/ encl: See next page


0
0 Joseph V. Sipek Clinton Power Station, Unit 1 lilinois Power Company cc:
  ,    Joseph V. Sipek                   Clinton Power Station, Unit 1 lilinois Power Company cc:
John G. Cook lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station 1035 Outer Park Drive P.O. Box 678 Springfield,IL 62704 Clinton,IL 61727 Larry Wigley Manager Nuclear Station Engineering Department Clinton Power Station P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 1
John G. Cook                       lilinois Department of Nuclear Safety Senior Vice President             Office of Nuclear Facility Safety Clinton Power Station             1035 Outer Park Drive P.O. Box 678                       Springfield,IL 62704 Clinton,IL 61727 Larry Wigley Manager Nuclear Station Engineering Department Clinton Power Station P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 1
R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603
R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603
_}}
_}}

Latest revision as of 07:42, 10 December 2024

Forwards SE Accepting 971209 Proposed Change to CPS USAR, Which Impact Commitments Made in CPS QAP Description.Changes Re Qualifications for Personnel Filling Position of Assistant Plant Manager Operations
ML20199F648
Person / Time
Site: Clinton 
Issue date: 01/26/1998
From: Hopkins J
NRC (Affiliation Not Assigned)
To: Sipek J
ILLINOIS POWER CO.
Shared Package
ML20199F652 List:
References
TAC-MA0266, TAC-MA266, NUDOCS 9802040067
Download: ML20199F648 (4)


Text

- -

Illinois Power C;mpany ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727

SUBJECT:

PROPOSED CHANGE TO THE CLINTON POWER STATION QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NO MA0266)

Dear Mr. Sipek:

In a [[letter::U-602887, Forwards Proposed Change to CPS USAR Which Will Impact Commitments Made in CPS QAP Description for NRC Review & Approval|letter dated December 9,1997]], the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -

Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.

Sincerely, Original signed by:

Jon B. Hopkins, Senior Project Manager Division of Reactor Projects ill/lV Project Directorate lll 3 Office of Nuclear Reactor Regulation Docket No. 50-461

//

Enclosure:

As stated aU cc w/ encl: See next page Distribution:

Docket File Public PD33 r/f S. Black E. Adensam (EGA1)

M. Bugg

$ "7a"A"'Rm NRC FIE CBElCOPY DOCUMENT NAME: g:\\clinton\\rna0266.qa OFFICE DRPW/PDill-3 E

DRPW/PD111-3 E

Al/

NAME EBarnhill 9M JHopkins

[f DATE 01/#198 01/jh/98 ///

l OFFICIAL RECORD COPY 61 P

PDR

'lllinois Power Company ATTN: Joseph Sipek Direct:r Licensing P.O. Box 678 Clinton, Illinois 61727

SUBJECT:

PROPOSED CHANGE TO THE CLINTON POWER STATION QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NO. MA0266)

Dear Mr. Sipek:

In a leder dated December 9,1997, the Illinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitments made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Maneger -

Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The enclosed Safety Evaluation provides our assessment of the requested change.

Sincerely, Original signed by Jon B. Hopkins, Senior hroject Manager Division of Reactor Projects lil/IV Project Directorate 111-3 Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

As stated cc w/ encl: See next page Distribution:

Docket File Public PD33 r/f S. Black E. Adensam (EGA1)

M. Bugg J. Hopkins G. Grant, Rlll DOCUMENT NAME: g:\\clinton\\ma0266.qa OFFICE DRPW/PDill-3 E

DRPW/PD1113 E

Al/

NAME EBarnhill 9/[

JHopkins

//

DATE 0161/98 01tJb/98 ///

OFFICIAL RECORD COPY 4

  • o UNITE 3 STATES NUCLEAR REGULATORY COMMISSION

<1 d

WASHINGTON, o.C. nam aaat

'% *****l January 26, 1998 lilinois Power Company ATTN: Joseph Sipek Director Licensing P.O. Box 678 Clinton, Illinois 61727

SUBJECT:

PROPOSED CHANGE TO THE CLINTON POWER STATION QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NO. MA0266)

Dear Mr. Sipok:

I in a letter dated Decemoer 9,1997, the lilinois Power Company submitted a proposed change to the Clinton Power Station (CPS) Updated Safety Analysis Report (USAR) which will impact commitrnents made in the CPS Quality Assurance Program Description (QAPD). The change concerns qualifications for personnel filling the position of Assistant Plant Manager -

Operations. The NRC staff has reviewed the proposed changes and determined that the reduction in commitment continues to comply with the criteria of Appendix B to 10 CFR Part 50 and is acceptable. The attached Safety Evaluation provides our assessment of the requested i

change.

Sincerely, t

/

/

on B. Hopkins, Sen or roject Manager Division of Reactor Projects lil/IV Project Directorate 1113 Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

As stated 1

cc w/ encl: See next page

0 Joseph V. Sipek Clinton Power Station, Unit 1 lilinois Power Company cc:

John G. Cook lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station 1035 Outer Park Drive P.O. Box 678 Springfield,IL 62704 Clinton,IL 61727 Larry Wigley Manager Nuclear Station Engineering Department Clinton Power Station P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 1

R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603

_