ML20202F782: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.                                                                                                                I o
{{#Wiki_filter:I o
;                                                      TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT                                     4 Certification of Plant-Referenced Simulator Manifest Date: January 27,1999 Correspondence Date: January 27,1999 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.. ...USAR File.....       .    ...Yes     No_x_
TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT 4
Steve Ludders .. . . ..NRC Commitment... ..Yes               No_x_
Certification of Plant-Referenced Simulator Manifest Date: January 27,1999 Correspondence Date: January 27,1999 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.....USAR File.....
Lila Imholte.................Monti OC Sec.. .. . ....Yes     No_x_ - 12, No dist to OC members below if YES SAC Secretary . ...... ..Monti SAC....     .    . . . . .Ye s No_x_ - 6 Monticello Internal Site Distribution:
...Yes No_x_
Monti Document Control File                                   JCC     ' b, o    NGSS, OC M F Hammer, Plant MGR, SAC, OC                                 L L f. o, GSSA, OC, SAC C A Schibonski, GSE, OC                                       E C Sopkin, MGR MTC, OC E M Reilly, GSM, OC                                           Monticello Oper Exp Coord J E Windschill, GSRS, OC                                       A E Ward, NQD B D Day, GSO, OC                                               Monti Site Lic File John Shriver (2 copies)                                       Monticello Sr. Resident inspector NSP Internal Distribution G T Goering, Chainnan, SAC W A Shamla, Dir Gen Qual Serv, SAC Communications Dept       Yes     No_x_
Steve Ludders......NRC Commitment.....Yes No_x_
External NSP Distribution Doc Controi Desk, NRC                                         Kris Sanda, State of Minn Director, Office of Nuclear Reactor                           J E Silberg                               l Regulation Fred Lyon, NRR-PM, NRC 9902040179           990127 9 ADOCK 05000263 ;
Lila Imholte.................Monti OC Sec.........Yes No_x_ - 12, No dist to OC members below if YES SAC Secretary.........Monti SAC....
PDR P                       PDR y M-1
.....Ye s No_x_ - 6 Monticello Internal Site Distribution:
Monti Document Control File JCC
' b, NGSS, OC o
M F Hammer, Plant MGR, SAC, OC L L f.
o, GSSA, OC, SAC C A Schibonski, GSE, OC E C Sopkin, MGR MTC, OC E M Reilly, GSM, OC Monticello Oper Exp Coord J E Windschill, GSRS, OC A E Ward, NQD B D Day, GSO, OC Monti Site Lic File John Shriver (2 copies)
Monticello Sr. Resident inspector NSP Internal Distribution G T Goering, Chainnan, SAC W A Shamla, Dir Gen Qual Serv, SAC Communications Dept Yes No_x_
External NSP Distribution Doc Controi Desk, NRC Kris Sanda, State of Minn Director, Office of Nuclear Reactor J E Silberg Regulation Fred Lyon, NRR-PM, NRC 9902040179 990127 9 PDR ADOCK 05000263 ;
P PDR y M-1


                              ~
~
l Northem States Power Company Monticello Nuclear Generating Plant         l 2807 West Hwy 75 Monticello, Minnesota 55362 9637 i
Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362 9637 i
o - January 27,1999                                                             10 CFR 55.45(b)(5)                                 ,
o
il                                                                                                                                   1
- January 27,1999 10 CFR 55.45(b)(5) il
  ^
^
          ' Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Certification of Plant-Referenced Simulator This submittal provides the information required by 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) for the Monticello Nuclear Generating Plant simulator. The required four year certification report is enclosed. Certification of the Monticello Nuclear Generating Plant simulator was provided to the Commission by {{letter dated|date=February 1, 1991|text=letter dated February 1,1991}}, from Thomas M. Parker to the US Nuclear Regulatory Commission, entitled " Certification of Plant-Referenced Simulator."
' Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Certification of Plant-Referenced Simulator This submittal provides the information required by 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) for the Monticello Nuclear Generating Plant simulator. The required four year certification report is enclosed. Certification of the Monticello Nuclear Generating Plant simulator was provided to the Commission by {{letter dated|date=February 1, 1991|text=letter dated February 1,1991}}, from Thomas M. Parker to the US Nuclear Regulatory Commission, entitled " Certification of Plant-Referenced Simulator."
This letter contains no new NRC commitments, nor does it modify any prior commitments. Please contact Marcus Voth, Monticello Licensing Project Manager, at 612-271-5116 if you require further information.
This letter contains no new NRC commitments, nor does it modify any prior commitments. Please contact Marcus Voth, Monticello Licensing Project Manager, at 612-271-5116 if you require further information.
                            %%flA/
%%flA/
Michael F. Hammer                                                                                                   1 Plant Manager .                                                                                                       l Monticello Nuclear Generating Plant c:     ' NRR Project Manager, NRC Sr. Resident inspector, NRC                                                                                     j
Michael F. Hammer 1
                    . State of Minnesota Attn: Kris Sanda                                                                                       D()
Plant Manager.
J Silberg -
l Monticello Nuclear Generating Plant c:
I'        '  
' NRR Project Manager, NRC Sr. Resident inspector, NRC j
D()
. State of Minnesota Attn: Kris Sanda J Silberg -
I'


==Attachment:==
==Attachment:==
  ' Monticello Nuclear Generating Plant Four Year Simulator Certification Report J11CENsETPeriodic Reports \ simulator.Jan99. Doc
  ' Monticello Nuclear Generating Plant Four Year Simulator Certification Report J11CENsETPeriodic Reports \\ simulator.Jan99. Doc


l NRC FORM 474                                 U.S. NUCLEAR REGULATORY COMMISSION                             APPROVED BY OMS: NO. 31504138                                   EXPIRES: 06t'3 ff2001 U                                                                                                           Esumated burden per response to comply with this mandatory mformabon colischon request. 120 hours This informabon is used to ca.tify a simulation facdity Forward Commerits regatdmg burden 85twnate to the Records M         ment Branch (T.8 F33), U S SIMULATION FACILITY CERTIFICATION                                                               %"J'OT'''"WJ" i'is"sc'.'"o'"fCfemeni a,d e'#4 'l0s*@.~oC' 20503 If anm        bon collection does n me NRC may not conduct or sponsor.       nd a .otdisplay a currencyvowlOMB
l NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 31504138 EXPIRES: 06t'3 ff2001 U
                                                                                                                                                                - a not iequired   = .spond io.c,ontros me numbe informanon coHecton This form a to be filed for msbal IN..STRUCTIONS:we en                                me -o,-.een .nd     ihe~,.-.
Esumated burden per response to comply with this mandatory mformabon colischon request. 120 hours This informabon is used to ca.tify a simulation facdity Forward Commerits regatdmg burden 85twnate to the Records M ment Branch (T.8 F33), U S SIMULATION FACILITY CERTIFICATION
cerbficabon, e bm m,.~ encerbficanon e - ,e, s-..      (d required). arid for any change to a sanulaban facility performance tesDng plan m FACIUTY                                                                                                                                                           DOCKET NUMBER Monticello Nuc? ear Generating Plant                                                                                                                 50-263 UCENSEE                                                                                                                                                           DATE Northern States Power Company                                                                                                                   Jan. 27, 1999 This is to cettrfy that
%"J'OT'''"WJ" i'is"sc'.'"o'"fCfemeni a,d e'#4 'l0s*@.~oC' me NRC may not conduct or sponsor..otdisplay a currencyvowlOMB c,ontros numbe 20503 If anm bon collection does n nd a - a not iequired =.spond io. me informanon coHecton IN..STRUCTIONS:we me -o,-.een.nd ~, cerbficabon, encerbficanon (d required). arid for any change to a sanulaban facility performance tesDng plan m This form a to be filed for msbal en ihe.-. e bm m,.~
: 1. The above named facility licensee is usmg a simulaton faciidy cons,sbag solely of a plant. referenced samuistor that meets the requirernents of 10 CFR 55 45.
e -,e, s-..
FACIUTY DOCKET NUMBER 50-263 Monticello Nuc? ear Generating Plant UCENSEE DATE Northern States Power Company Jan. 27, 1999 This is to cettrfy that 1.
The above named facility licensee is usmg a simulaton faciidy cons,sbag solely of a plant. referenced samuistor that meets the requirernents of 10 CFR 55 45.
: 2. Documentat on is eveilable for NRC remew m accordance with 10 CFR 55 45(b).
: 2. Documentat on is eveilable for NRC remew m accordance with 10 CFR 55 45(b).
: 3. This sunufabon focusty meets the gedance contained m ANSitANS 3 51965 or ANSIIANS 3 S1993, as endorsed by NRU Regulatory Guide 1.149 lllhete are any EXCEPTIONS to the certificaban of this stem, CHECK HERE [ ] and desenbe fully on addibonal pages as necessary                                                                 ;
: 3. This sunufabon focusty meets the gedance contained m ANSitANS 3 51965 or ANSIIANS 3 S1993, as endorsed by NRU Regulatory Guide 1.149 lllhete are any EXCEPTIONS to the certificaban of this stem, CHECK HERE [ ] and desenbe fully on addibonal pages as necessary NAME (a o@er afenbhcahon) AND LOCATION OF SIMULATION FACIUTY.
NAME (a o@er afenbhcahon) AND LOCATION OF SIMULATION FACIUTY.
Monticello Nuclear Generating Plant Training Simulator
Monticello Nuclear Generating Plant Training Simulator                                                                                                                                   )
)
Monticello Training Center Monticellos Minnesota 55362 SIMULATION FACluTY PERFORMANCE TEST ABSTRACTS ATTACHED (For penbrmence dests condueled a me permd andmg we me dets of mes corblicaban)
Monticello Training Center Monticello Minnesota 55362 s
SIMULATION FACluTY PERFORMANCE TEST ABSTRACTS ATTACHED (For penbrmence dests condueled a me permd andmg we me dets of mes corblicaban)
DESCRIPTION OF PERFORMANCE TESTING COMPLETED. (Altech addhonalpages as necessary end Idenk& @e reem descnpbon bemg conbnued)
DESCRIPTION OF PERFORMANCE TESTING COMPLETED. (Altech addhonalpages as necessary end Idenk& @e reem descnpbon bemg conbnued)
See attached Monticello Simulator Certification Report I
See attached Monticello Simulator Certification Report I
l l
l SIMULATION FACILITY PERFORMANCE TESTWO SCHEDULE ATTACHEO. (Fcr me conductof appromirnalsty 25 percent ofpeArmance kats per year A:r me itxr-yearpened
SIMULATION FACILITY PERFORMANCE TESTWO SCHEDULE ATTACHEO. (Fcr me conductof appromirnalsty 25 percent ofpeArmance kats per year A:r me itxr-yearpened
)(
    )(   comunencing wem the date of thes certrncaban)
comunencing wem the date of thes certrncaban)
DESCRIPTION OF PERFORMANCE TESTMO TO BE CONOUCTED. (Atsech addobonalpages as necessay and adenbry the stem desaxpban kerrte continued)
DESCRIPTION OF PERFORMANCE TESTMO TO BE CONOUCTED. (Atsech addobonalpages as necessay and adenbry the stem desaxpban kerrte continued)
See attached Monticello Simulator Certification Report                                                                                                                                 l l
See attached Monticello Simulator Certification Report l
l l
\\
                                                                                                                                                                                                            \
PERFORMANCE TESTING PLAN CHANGE. (Fa any mod,fceban to e perhmence fesbng p'en submetfod on a proveus certificaban)
PERFORMANCE TESTING PLAN CHANGE. (Fa any mod,fceban to e perhmence fesbng p'en submetfod on a proveus certificaban)
DESCRIPT10N OF PERFORMANCE TESTNO PLAN CHANGE (Anach eddabonelpages es necessary and adentr& te elem descnpban beng conbnued)
DESCRIPT10N OF PERFORMANCE TESTNO PLAN CHANGE (Anach eddabonelpages es necessary and adentr& te elem descnpban beng conbnued)
RECERT1FICATION (Desaube carectrve ockons teken, effech resuns of completedparksmance lesbng m occadence we y0 CFR SS 4S(b)(S)(r).
RECERT1FICATION (Desaube carectrve ockons teken, effech resuns of completedparksmance lesbng m occadence we y0 CFR SS 4S(b)(S)(r).
(Ansch addhanalpages es necessary end adentr& 50 item desenpkon beng conbnued)
(Ansch addhanalpages es necessary end adentr& 50 item desenpkon beng conbnued)
Any false statement or ernesseon m tbs document, includmg attachments, may be subject to cMI and commal sanctions. I corbfy under penalty of perjury that the esformabon m thes document and attachments is hee and correct SsGNATURE - AUTHOR 1 ZED REPRESENTATlVE                             TITLE                                                                                         DATE Plant Manager Michael F. Hammer                                                     Monticello Nuclear Generatine Plant                                                         Jan. 27. 1999 in accordance with 10 CFR 55 5, Communicabons, this form shall be submetted b the NRC as follows BYMAIL ADORESSEDTO               DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION                         BY DEUVERY IN PERSON               ONE WHITE FUNT NORTH U.S. NUCLEAR REGULATORY COMMISSION                                     TO THE NRC OFFICE AT;             11555 ROCKVILLE PlKE WASHINGTON, DC 206654001                                                                                 ROCKVILLE, MO NRC FORM 414 (&1998)                                                                                                                                               PRINTED ON RECYCLED PAPER}}
Any false statement or ernesseon m tbs document, includmg attachments, may be subject to cMI and commal sanctions. I corbfy under penalty of perjury that the esformabon m thes document and attachments is hee and correct SsGNATURE - AUTHOR 1 ZED REPRESENTATlVE TITLE DATE Plant Manager Michael F. Hammer Monticello Nuclear Generatine Plant Jan. 27. 1999 in accordance with 10 CFR 55 5, Communicabons, this form shall be submetted b the NRC as follows BYMAIL ADORESSEDTO DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION BY DEUVERY IN PERSON ONE WHITE FUNT NORTH U.S. NUCLEAR REGULATORY COMMISSION TO THE NRC OFFICE AT; 11555 ROCKVILLE PlKE WASHINGTON, DC 206654001 ROCKVILLE, MO NRC FORM 414 (&1998)
PRINTED ON RECYCLED PAPER}}

Latest revision as of 02:43, 8 December 2024

Forwards 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(vi).Ltr Contains No New Commitments or Modifies Any Prior Commitments
ML20202F782
Person / Time
Site: Monticello 
Issue date: 01/27/1999
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20202F788 List:
References
NUDOCS 9902040179
Download: ML20202F782 (3)


Text

I o

TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT 4

Certification of Plant-Referenced Simulator Manifest Date: January 27,1999 Correspondence Date: January 27,1999 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.....USAR File.....

...Yes No_x_

Steve Ludders......NRC Commitment.....Yes No_x_

Lila Imholte.................Monti OC Sec.........Yes No_x_ - 12, No dist to OC members below if YES SAC Secretary.........Monti SAC....

.....Ye s No_x_ - 6 Monticello Internal Site Distribution:

Monti Document Control File JCC

' b, NGSS, OC o

M F Hammer, Plant MGR, SAC, OC L L f.

o, GSSA, OC, SAC C A Schibonski, GSE, OC E C Sopkin, MGR MTC, OC E M Reilly, GSM, OC Monticello Oper Exp Coord J E Windschill, GSRS, OC A E Ward, NQD B D Day, GSO, OC Monti Site Lic File John Shriver (2 copies)

Monticello Sr. Resident inspector NSP Internal Distribution G T Goering, Chainnan, SAC W A Shamla, Dir Gen Qual Serv, SAC Communications Dept Yes No_x_

External NSP Distribution Doc Controi Desk, NRC Kris Sanda, State of Minn Director, Office of Nuclear Reactor J E Silberg Regulation Fred Lyon, NRR-PM, NRC 9902040179 990127 9 PDR ADOCK 05000263 ;

P PDR y M-1

~

Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362 9637 i

o

- January 27,1999 10 CFR 55.45(b)(5) il

^

' Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Certification of Plant-Referenced Simulator This submittal provides the information required by 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) for the Monticello Nuclear Generating Plant simulator. The required four year certification report is enclosed. Certification of the Monticello Nuclear Generating Plant simulator was provided to the Commission by letter dated February 1,1991, from Thomas M. Parker to the US Nuclear Regulatory Commission, entitled " Certification of Plant-Referenced Simulator."

This letter contains no new NRC commitments, nor does it modify any prior commitments. Please contact Marcus Voth, Monticello Licensing Project Manager, at 612-271-5116 if you require further information.

%%flA/

Michael F. Hammer 1

Plant Manager.

l Monticello Nuclear Generating Plant c:

' NRR Project Manager, NRC Sr. Resident inspector, NRC j

D()

. State of Minnesota Attn: Kris Sanda J Silberg -

I'

Attachment:

' Monticello Nuclear Generating Plant Four Year Simulator Certification Report J11CENsETPeriodic Reports \\ simulator.Jan99. Doc

l NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 31504138 EXPIRES: 06t'3 ff2001 U

Esumated burden per response to comply with this mandatory mformabon colischon request. 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> This informabon is used to ca.tify a simulation facdity Forward Commerits regatdmg burden 85twnate to the Records M ment Branch (T.8 F33), U S SIMULATION FACILITY CERTIFICATION

%"J'OT"WJ" i'is"sc'.'"o'"fCfemeni a,d e'#4 'l0s*@.~oC' me NRC may not conduct or sponsor..otdisplay a currencyvowlOMB c,ontros numbe 20503 If anm bon collection does n nd a - a not iequired =.spond io. me informanon coHecton IN..STRUCTIONS:we me -o,-.een.nd ~, cerbficabon, encerbficanon (d required). arid for any change to a sanulaban facility performance tesDng plan m This form a to be filed for msbal en ihe.-. e bm m,.~

e -,e, s-..

FACIUTY DOCKET NUMBER 50-263 Monticello Nuc? ear Generating Plant UCENSEE DATE Northern States Power Company Jan. 27, 1999 This is to cettrfy that 1.

The above named facility licensee is usmg a simulaton faciidy cons,sbag solely of a plant. referenced samuistor that meets the requirernents of 10 CFR 55 45.

2. Documentat on is eveilable for NRC remew m accordance with 10 CFR 55 45(b).
3. This sunufabon focusty meets the gedance contained m ANSitANS 3 51965 or ANSIIANS 3 S1993, as endorsed by NRU Regulatory Guide 1.149 lllhete are any EXCEPTIONS to the certificaban of this stem, CHECK HERE [ ] and desenbe fully on addibonal pages as necessary NAME (a o@er afenbhcahon) AND LOCATION OF SIMULATION FACIUTY.

Monticello Nuclear Generating Plant Training Simulator

)

Monticello Training Center Monticello Minnesota 55362 s

SIMULATION FACluTY PERFORMANCE TEST ABSTRACTS ATTACHED (For penbrmence dests condueled a me permd andmg we me dets of mes corblicaban)

DESCRIPTION OF PERFORMANCE TESTING COMPLETED. (Altech addhonalpages as necessary end Idenk& @e reem descnpbon bemg conbnued)

See attached Monticello Simulator Certification Report I

l SIMULATION FACILITY PERFORMANCE TESTWO SCHEDULE ATTACHEO. (Fcr me conductof appromirnalsty 25 percent ofpeArmance kats per year A:r me itxr-yearpened

)(

comunencing wem the date of thes certrncaban)

DESCRIPTION OF PERFORMANCE TESTMO TO BE CONOUCTED. (Atsech addobonalpages as necessay and adenbry the stem desaxpban kerrte continued)

See attached Monticello Simulator Certification Report l

\\

PERFORMANCE TESTING PLAN CHANGE. (Fa any mod,fceban to e perhmence fesbng p'en submetfod on a proveus certificaban)

DESCRIPT10N OF PERFORMANCE TESTNO PLAN CHANGE (Anach eddabonelpages es necessary and adentr& te elem descnpban beng conbnued)

RECERT1FICATION (Desaube carectrve ockons teken, effech resuns of completedparksmance lesbng m occadence we y0 CFR SS 4S(b)(S)(r).

(Ansch addhanalpages es necessary end adentr& 50 item desenpkon beng conbnued)

Any false statement or ernesseon m tbs document, includmg attachments, may be subject to cMI and commal sanctions. I corbfy under penalty of perjury that the esformabon m thes document and attachments is hee and correct SsGNATURE - AUTHOR 1 ZED REPRESENTATlVE TITLE DATE Plant Manager Michael F. Hammer Monticello Nuclear Generatine Plant Jan. 27. 1999 in accordance with 10 CFR 55 5, Communicabons, this form shall be submetted b the NRC as follows BYMAIL ADORESSEDTO DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION BY DEUVERY IN PERSON ONE WHITE FUNT NORTH U.S. NUCLEAR REGULATORY COMMISSION TO THE NRC OFFICE AT; 11555 ROCKVILLE PlKE WASHINGTON, DC 206654001 ROCKVILLE, MO NRC FORM 414 (&1998)

PRINTED ON RECYCLED PAPER