July 15, 1999 | |||
1 | |||
' | ' | ||
EA No. 99-045 | |||
Southern Nuclear Operating Company, Inc. | |||
ATTN: Mr. J. B. Beasley | |||
, | |||
l | l | ||
- Vice President | |||
! | ! | ||
Vogtle Electric Generating Plant | |||
P. O. Box 1295 | |||
Birmingham, AL 35201 | |||
SUBJECT: | |||
NRC INTEGRATED INSPECTION REPORT NOS. 60-424/99-04 AND | |||
50-425/99-04 | |||
Dear Mr. Beasley: | |||
This refers to the inspection conducted May 2,1999, through June 19,1999, at the Vogtle Units | |||
l' | l' | ||
- 1 and 2 reactor facilities. The enclosed report presents the results of that inspection. | |||
Based on the results of this inspection, the NRC has determined that two violations of NRC | |||
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs), | |||
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the | |||
subject inspection report. If you contest the violations or severity level of the NCVs, you should | |||
provide a response within 30 days of the date of this inspection report, with the basis for your | |||
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, | |||
j | j | ||
DC 20555-0001, with copies to the Regional Administrator, Region 11, and the Director, Office of | |||
' | ' | ||
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. | |||
In accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this letter and its | |||
i | i | ||
enclosures will be placed in the NRC Public Document Room. | |||
I | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
(Original signed by | |||
i | |||
Pierce H. | |||
SkinnerP | |||
Pierce H. Skinner, Chief | |||
l | |||
Reactor Projects Branch 2 | |||
l | |||
Division of Reactor Projects | |||
i | |||
Docket Nos. 50-424,50-425 | |||
) | |||
License Nos. NPF-68, NPF-81 | |||
j | |||
Enclosure: NRC Integrated inspection Report | |||
50-424/99-04 and 50-425/99-04 | |||
i | |||
cc w/sncl:(See Page 2) | |||
9907290100 990715 | |||
PDR | |||
ADOCK 05000424 | |||
0 | |||
PDR | |||
~f E OI | |||
j | |||
r , | r | ||
, | |||
l | |||
j | |||
SNC' | |||
2 | |||
cc w/ encl: | |||
J. D. Woodard | |||
Executive Vice President | |||
Southem Nuclear Operating Company, Inc. | |||
P. O. Box 1295 | |||
Birmingham, AL 35201-1295 | |||
J. T. Gasser | |||
l | l | ||
General Manager, Plant Vogtle | |||
l | |||
Southern Nuclear Operating Company, Inc. | |||
P. O. Box 1600 | |||
Waynesboro, GA 30830 | |||
J. A. Bailey ' | |||
Manager-Licensing | |||
Southern Nuclear Operating Company, Inc. | |||
P. O. Box 1295 | |||
l | Birmingham, AL 35201-1295 | ||
Director, Consumers' Utility Counsel Division | |||
Governor's Office of Consumer Affairs | |||
2 M. L. King, Jr. Drive | |||
Plaza Level East; Suite 356 | |||
Atlanta, GA 30334-4600 | |||
Office of Planning and Budget | |||
Room 615B | |||
270 Washington Street, SW | |||
Atlanta, GA 30334 | |||
Office of the County Commissioner | |||
Burke County Commission | |||
Waynesboro, GA 30830 | |||
Director, Department of Natural Resources | |||
205 Butler Street, SE, Suite 1252 | |||
Atlanta, GA 30334 | |||
Manager, Radioactive Materials Program | |||
Department of Natural Resources | |||
4244 International Parkway | |||
Suite 114 | |||
Atlanta, GA 30354 | |||
cc w/enci cont'd: (See Page 3) | |||
' | |||
l | l | ||
! | ! | ||
I | I | ||
J | |||
4 | |||
. | . | ||
SNC | |||
3 | |||
cc w/ encl: Continued | |||
Attorney General | |||
Law Department | |||
132 Judicial Building | |||
Atlanta, GA 30334 | |||
Program Manager | |||
Fossil & Nuclear Operations | |||
Oglethorpe Power Corporation | |||
2100 E. Exchange Place | |||
Tucker, GA 30085-1349 | |||
Charles A. Patrizia, Esq. | |||
Paul, Hastings, Janofsky & Walker | |||
10th Floor | |||
1299 Pennsylvania Avenue | |||
Washington, D. C. 20004-9500 | |||
Arthur H. Domby, Esq. | |||
Troutman Sanders | |||
NationsBank Plaza | |||
600 Peachtree Street, NE, Suite 5200 | |||
Atlanta, GA 30308-2216 | |||
Senior Engineer - Power Supply | |||
Municipal Electric Authority | |||
of Georgia | |||
1470 Riveredge Parkway NW | |||
Atlanta, GA 30328-4684 | |||
Distribution w/ encl: | |||
L. Plisco, Ril | |||
P. Skinner, Rll | |||
R. Assa, NRR | |||
PUBLIC | |||
NRC Senior Resident inspector | |||
U.S. Nuclear Regulatory Commission | |||
8805 River Road | |||
Waynesboro, GA 30830 | |||
/ | |||
, | |||
SIGNATURE | OFFICE | ||
NAME | Ril:DRP | ||
DATE. | Ril:DRP | ||
COPY? | Ril:DRP | ||
F fp{,, , A | |||
e | |||
SIGNATURE | |||
/'y | |||
/f J / gy/ | |||
NAME | |||
CWReph:dka | |||
JZeller | |||
Ko'Donohue | |||
i qagir$6rge/ / | |||
gf @ | |||
DATE. | |||
7/ gg | |||
7/ /99 | |||
7/ /99 | |||
pg/ly / | |||
y/y/99 | |||
7/ /99 | |||
7/ /99 | |||
COPY? | |||
YEs fNOf | |||
YEs | |||
NO | |||
YEs | |||
NO | |||
VIES / N(7 | |||
QfEs) | |||
NO | |||
YEs | |||
No | |||
YEs | |||
No | |||
, | |||
OFFICIAL RETORD COPY | |||
DOCUMENT NAME: G:W(IITLE\\i | |||
vog | |||
' JUL-83-1999 a/d:56 | |||
USiRC V0GTLE | |||
1 706 554 9548 | |||
P.02 | |||
4 | |||
SNC | |||
ccw/enci: Continued | |||
Attorney General | |||
Law Department | |||
132 Judicial Building | |||
Atlanta,GA 30334 | |||
Program Manager | |||
Fossil & Nuclear Operations | |||
Oglethorpe Power Corporation | |||
2100 E. Exchange Place | |||
Tucker, GA 30085-1349 | |||
- | |||
Charles A. Patrizia. Esq. | |||
Paul, Hastings,Janofsky & Walker | |||
10th Floor | |||
l | |||
1299 Pennsyhrania Avenue | |||
Washington, D. C. 20004-950r) | |||
' Arthur H. Domby, Esq. | |||
Troutman Sanders | |||
NationsBank Plaza | |||
600 Peachtree Street, NE, Suite 5200 | |||
Atlanta, GA 30308-2216 | |||
Senior Engineer- Power Supply | |||
Municipal Electric Authority | |||
of Georgia | |||
1470 Riveredge Parkway NW | |||
Atlanta, GA 30328 4 684 | |||
I | |||
Dighibution w/ encl: | |||
L Plisco, Ril | |||
P. Skinner, Ril | |||
R. Assa, NRR | |||
PUBLIC | |||
' | |||
NRC Senior Residentinspector | |||
O.S. Nuclear Regulatory Commission | |||
8805 River Road | |||
Waynesboro,GA 30830 | |||
. | |||
~ | |||
RN:DRP | |||
M NtP | |||
RR:DRP | |||
Rit:DR5 | |||
{J | {J | ||
- ^TURE | _ | ||
- ^TURE | |||
AQg | |||
. | |||
- | |||
I4ARE | |||
C | |||
.'-dka | |||
q | |||
KO'Donohus | |||
wKleinsorge | |||
DATE | DATE | ||
Ti see | |||
Js5ies | |||
rig 3ses | |||
ri ies | |||
(UFi? | 71 ies | ||
ri roe | |||
7e ise | |||
YES | |||
No | |||
(YE&i | |||
NO | |||
YES | |||
No | |||
YES | |||
NO | |||
YES | |||
NO | |||
YES | |||
NO | |||
YES | |||
No _ | |||
' | |||
(UFi? | |||
DOCUMENT NAME: G:WoGTLE\\itse64vog | |||
oPFICiALREcoRO COPY | |||
TOTAL P.02 | |||
}} | }} | ||
Latest revision as of 16:32, 6 December 2024
| ML20210E043 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/15/1999 |
| From: | Skinner P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beasley J SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20210E049 | List: |
| References | |
| 50-424-99-04, 50-425-99-04, EA-99-045, NUDOCS 9907280108 | |
| Download: ML20210E043 (4) | |
See also: IR 05000424/1999004
Text
l
1
July 15, 1999
1
'
Southern Nuclear Operating Company, Inc.
ATTN: Mr. J. B. Beasley
,
l
- Vice President
!
Vogtle Electric Generating Plant
P. O. Box 1295
Birmingham, AL 35201
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 60-424/99-04 AND
50-425/99-04
Dear Mr. Beasley:
This refers to the inspection conducted May 2,1999, through June 19,1999, at the Vogtle Units
l'
- 1 and 2 reactor facilities. The enclosed report presents the results of that inspection.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violations or severity level of the NCVs, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,
j
DC 20555-0001, with copies to the Regional Administrator, Region 11, and the Director, Office of
'
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this letter and its
i
enclosures will be placed in the NRC Public Document Room.
I
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by
i
Pierce H.
SkinnerP
Pierce H. Skinner, Chief
l
Reactor Projects Branch 2
l
Division of Reactor Projects
i
Docket Nos. 50-424,50-425
)
j
Enclosure: NRC Integrated inspection Report
50-424/99-04 and 50-425/99-04
i
cc w/sncl:(See Page 2)
9907290100 990715
ADOCK 05000424
0
~f E OI
j
r
,
l
j
SNC'
2
cc w/ encl:
J. D. Woodard
Executive Vice President
Southem Nuclear Operating Company, Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
J. T. Gasser
l
General Manager, Plant Vogtle
l
Southern Nuclear Operating Company, Inc.
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey '
Manager-Licensing
Southern Nuclear Operating Company, Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
Director, Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Office of Planning and Budget
Room 615B
270 Washington Street, SW
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Director, Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
cc w/enci cont'd: (See Page 3)
'
l
!
I
J
4
.
3
cc w/ encl: Continued
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Program Manager
Fossil & Nuclear Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
Washington, D. C. 20004-9500
Arthur H. Domby, Esq.
Troutman Sanders
NationsBank Plaza
600 Peachtree Street, NE, Suite 5200
Atlanta, GA 30308-2216
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328-4684
Distribution w/ encl:
L. Plisco, Ril
P. Skinner, Rll
R. Assa, NRR
PUBLIC
NRC Senior Resident inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro, GA 30830
/
,
OFFICE
Ril:DRP
Ril:DRP
Ril:DRP
F fp{,, , A
e
SIGNATURE
/'y
/f J / gy/
NAME
CWReph:dka
JZeller
Ko'Donohue
i qagir$6rge/ /
gf @
DATE.
7/ gg
7/ /99
7/ /99
pg/ly /
y/y/99
7/ /99
7/ /99
COPY?
YEs fNOf
YEs
NO
YEs
NO
VIES / N(7
QfEs)
NO
YEs
No
YEs
No
,
OFFICIAL RETORD COPY
DOCUMENT NAME: G:W(IITLE\\i
vog
' JUL-83-1999 a/d:56
USiRC V0GTLE
1 706 554 9548
P.02
4
ccw/enci: Continued
Attorney General
Law Department
132 Judicial Building
Atlanta,GA 30334
Program Manager
Fossil & Nuclear Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
-
Charles A. Patrizia. Esq.
Paul, Hastings,Janofsky & Walker
10th Floor
l
1299 Pennsyhrania Avenue
Washington, D. C. 20004-950r)
' Arthur H. Domby, Esq.
Troutman Sanders
NationsBank Plaza
600 Peachtree Street, NE, Suite 5200
Atlanta, GA 30308-2216
Senior Engineer- Power Supply
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328 4 684
I
Dighibution w/ encl:
L Plisco, Ril
P. Skinner, Ril
R. Assa, NRR
PUBLIC
'
NRC Senior Residentinspector
O.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro,GA 30830
.
~
RN:DRP
M NtP
RR:DRP
Rit:DR5
{J
_
- ^TURE
AQg
.
-
I4ARE
C
.'-dka
q
KO'Donohus
wKleinsorge
DATE
Ti see
Js5ies
rig 3ses
ri ies
71 ies
ri roe
7e ise
YES
No
(YE&i
NO
YES
No
YES
NO
YES
NO
YES
NO
YES
No _
'
(UFi?
DOCUMENT NAME: G:WoGTLE\\itse64vog
oPFICiALREcoRO COPY
TOTAL P.02