{{#Wiki_filter:April 6, 2021
Mr. David Rhoades
Senior VP, Exelon Generation Co., LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
              OF NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR
              INFORMATION: INSPECTION REPORT 05000237/2021011;
              05000249/2021011
Dear Mr. Rhoades:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your Dresden Nuclear
Power Station, Units 2 and 3 beginning July 12, 2021. The inspection will be conducted in
accordance with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated
June 12, 2019.
The inspection will verify that plant Systems, Structures, and Components (SSCs) and/or
administrative controls credited in the approved Fire Protection Program (FPP) can perform
their licensing basis functions.
The schedule for the inspection is as follows:
    *    Preparation week (R-III office): July 5, 2021
    *    Week 1 of onsite inspection: July 12 - 16, 2021
    *    Week 2 of onsite inspection: July 26 - 30, 2021
Experience has shown that the baseline fire protection team inspections are extremely resource
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
inspection impact on the site and to ensure a productive inspection for both organizations, we
have enclosed a request for documents needed for the inspection. These documents have
been divided into three groups.
The first group lists information necessary to aid the inspection team in choosing specific focus
areas for the inspection and to ensure that the inspection team is adequately prepared for the
inspection. It is requested that this information be provided to the lead inspector via mail or
electronically no later than May 24, 2021.
The second group of requested documents consists of those items that the team will review, or
need access to, during the inspection. Please have this information available by the first day of
the first onsite inspection week July 12, 2021.
 
D. Rhoades                                        -2-
The third group lists the information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
The lead inspector for this inspection is Mr. B. Jose. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 630-829-9756 or via
e-mail at Benny.Jose@nrc.gov. This letter, its enclosure, and your response (if any) will be
made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections,
Exemptions, Requests for Withholding.
                                                Sincerely,
                                                /RA/
                                                Benny Jose, Senior Reactor Inspector
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-237 and 50-249
License Nos. DPR-19 and DPR-25
Enclosure:
Information Request for Fire Protection
Team Inspection
cc: Distribution via LISTSERV
 
D. Rhoades                                  -3-
Letter to David Rhoades from Benny Jose dated April 6, 2021.
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
            OF NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR
            INFORMATION: INSPECTION REPORT 05000237/2021011;
            05000249/2021011
DISTRIBUTION:
Brett Titus
Mark Haire
RidsNrrDorlLpl3
RidsNrrPMDresden Resource
RidsNrrDroIrib Resource
John Giessner
Kenneth OBrien
Jamnes Cameron
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number: ML21096A175
    Publicly Available      Non-Publicly Available        Sensitive Non-Sensitive
OFFICE      RIII
NAME        BJose:mb
              via e-mail
DATE        04/06/2021
                                OFFICIAL RECORD COPY
 
        FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
I. Information Requested Prior to the Inspection Preparation Week
  The following information is requested by May 24, 2021. If you have any questions
  regarding this request, please call the lead inspector as soon as possible. All information
  should be sent to Benny Jose (e-mail address) Benny.Jose@nrc.gov. Electronic media is
  preferred (e.g. via Share File System).
  1. One set of hard-copy documents for facility layout drawings which identify plant fire area
      delineation; areas protected by automatic fire suppression and detection; and locations
      of fire protection equipment.
  2. Licensing Information:
      a. All NRC Safety Evaluation Reports (SERs) applicable to fire protection (specifically
            including those SERs referenced by the plant fire protection license condition) and all
            licensing correspondence referenced by the SERs;
      b. All licensing correspondence associated with the comparison to Standard Review
            Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
      c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated
            licensing correspondence;
      d. For pre-1979 plants, all licensing correspondence associated with those sections of
            10 CFR Part 50, Appendix R, that are not applicable to the plant under
            10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with
            those fire protection features proposed or implemented by the licensee that have
            been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch
            Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs
            issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection
            features, which were accepted by the NRC staff in comprehensive fire protection
            SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976
            (10 CFR 50.48(b)(1)(ii)); and
      e. The final safety analysis report sections applicable to fire protection, FHA, and SSA
            in effect at the time of original licensing.
  3. Fire Protection Program:
      a. A listing of changes made to the FPP since the last triennial fire protection
            inspection;
      b. For pre-1979 plants, a listing of the protection methodologies identified under
            10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for fire
            zones/areas. That is, please specify whether 3-hour rated fire barriers;
            (Section III.G.2.a), 20-foot separation along with detection and suppression;
            (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
            (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a
            strategy for each selected fire zone/area;
                                                                                            Enclosure
 
      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
  c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown
        evaluations);
  d. A list of applicable codes and standards related to the design of plant fire protection
        features. The list should include National Fire Protection Association (NFPA) code
        versions committed to (i.e., the NFPA Codes of Record);
  e. List of plant deviations from code commitments and associated evaluations;
  f.  Fire Protection Program and/or Fire Protection Plan document;
  g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA
        document (if summary document not available);
  h. List of the top 25 highest fire CDF scenarios for each unit;
  i.  List of Fire Areas/Zones ranked by contribution to CDF (i.e., ranking of highest to
        lowest risk fire areas/zones);
  j.  List of the top 25 highest fire LERF scenarios for each unit; and
  k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA
        sorted by RAW and human reliability worksheets for these items.
4. Facility Information:
  a. Piping and instrumentation (flow) diagrams showing the components used to achieve
        and maintain hot standby and cold shutdown for fires outside the control room, and
        those components used for those areas requiring alternative shutdown capability;
  b. One-line schematic drawings of the electrical distribution system for 4160 Volts
        alternating current (Vac) down to 480Vac;
  c. One-line schematic drawings of the electrical distribution system for 250 Volts direct
        current (Vdc) and 125Vdc systems as applicable;
  d. Logic diagrams showing the components used to achieve and maintain hot standby
        and cold shutdown; and
  e. Safe shutdown cable routing database (requested electronically, such as on compact
        disc, if available).
5. Operations Response for Fire Protection:
  a. Plant operating procedures which specify the initial operations response to a fire
        alarm or annunciator.
                                              2
 
          FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
    6. Corrective Actions:
        a. Listing of open and closed fire protection condition reports (i.e., problem identification
            forms and their resolution reports) since the date of the last, fire protection
            inspection; and
        b. List of current fire impairments, including duration.
    7. General Information:
        a. A listing of abbreviations and/or designators for plant systems;
        b. Organization charts of site personnel down to the level of fire protection staff
            personnel; and
        c. A phone list for onsite licensee personnel.
II. Information Requested to Be Available on First Day of the First Onsite
    Inspection Week (July 12, 2021)
    The following information is requested to be provided on the first day of inspection. It is
    requested that this information be provided on three sets of CDs (searchable, if possible).
    1. Program Procedures:
        a. Procedures for:
            i.  Administrative controls (such as allowed out of service times and compensatory
                measures) for fire protection systems and components;
            ii. Control of transient combustibles; and
            iii. Control of hot work.
        b. List of maintenance and surveillance testing procedures for alternative shutdown
            capability and fire barriers, detectors, pumps, and suppression systems; and
        c. List of maintenance procedures which routinely verify fuse breaker coordination in
            accordance with the post-fire safe shutdown coordination analysis.
    2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs
        to be determined during inspection preparation week):
        a. Coordination calculations and/or justifications that verify fuse/breaker coordination for
            SSCs that are fed off of the same electrical buses as components in the protected
            safe shutdown train;
        b. Copies of significant fire protection and post-fire safe shutdown related design
            change package descriptions (including their associated 10 CFR 50.59 evaluations)
            and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;
        c. Gaseous suppression system pre-operational testing, if applicable, for selected fire
            zones/areas;
                                                  3
 
      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
  d. Hydraulic calculations and supporting test data which demonstrate operability for
        water suppression systems;
  e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac
        electrical systems; and
  f.  List of all fire protection or Appendix R calculations.
3. Assessment and Corrective Actions:
  The three most recent fire protection Quality Assurance audits and/or fire protection
  self-assessments.
4. Any updates to information previously provided.
5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be
  determined during inspection preparation week):
  a. Copy of FPP implementing procedures (e.g., administrative controls, surveillance
        testing, and fire brigade);
  b. Pre-fire plans for selected fire area(s); and
  c. List of fire protection system design changes completed in the last three years.
6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during
  inspection preparation week):
  a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe
        shutdown components;
  b. Administrative or configuration control procedures that govern fuse replacement
        (e.g., fuse control procedures);
  c. Maintenance procedures that verify breaker over-current trip settings to ensure
        coordination remains functional, for post-fire nuclear safety capability components;
  d. Last surveillance demonstrating operability of those components operated from the
        primary control stations;
  e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be
        reviewed (C-size paper drawings);
  f.  Cable routing for components and equipment credited for post-fire nuclear safety
        capability systems and components;
  g. List of post-fire nuclear safety capability system and component design changes
        completed in the last three years; and
  h. List of identified fire induced circuit failure analyses.
                                                4
 
          FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
    7. Operations:
        a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected
            fire area);
        b. For Cold Shutdown Repairs, provide the following:
            i. Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
            ii. Most recent inspection and inventory results.
        c. List of licensed operator Job Performance Measures for operator actions required to
            achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs
            and fire area);
        d. For Radio communications, provide the following:
            i.  Communications Plan for firefighting and post-fire safe shutdown manual actions;
            ii.  Repeater locations;
            iii. Cable routing for repeater power supply cables;
            iv.  Radio coverage test results; and
            v.  Radio Dead Spot locations in the plant.
        e. Environmental and habitability evaluations for post-fire operator actions
            (temperature, smoke, humidity, SCBAs, etc.).
    8. Administrative Control, Oversight, and Corrective Action Programs:
        a. Self-assessments, peer assessments, and audits of fire protection activities for
            the last three years;
        b. Self-assessments, peer assessments, and audits of post-fire nuclear safety
            capability methodology for the last three years; and
        c. List of fire event analysis reports for the last three years.
    9. Any updates to information previously provided.
III. Information Requested to Be Provided Throughout the Inspection
    1. Copies of any corrective action documents generated as a result of the inspection teams
        questions or queries during this inspection.
    2. Copies of the list of questions submitted by the inspection team members and the
        status/resolution of the information requested (provided daily during the inspection to
        each inspection team member).
                                                    5
}}
}}

Revision as of 13:28, 9 September 2021

Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000237/2021011; 05000249/2021011
ML21096A175
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/06/2021
From: Benny Jose
Division of Reactor Safety III
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021011
Download: ML21096A175 (8)


See also: IR 05000237/2021011

Text

April 6, 2021

Mr. David Rhoades

Senior VP, Exelon Generation Co., LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR

INFORMATION: INSPECTION REPORT 05000237/2021011;

05000249/2021011

Dear Mr. Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your Dresden Nuclear

Power Station, Units 2 and 3 beginning July 12, 2021. The inspection will be conducted in

accordance with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated

June 12, 2019.

The inspection will verify that plant Systems, Structures, and Components (SSCs) and/or

administrative controls credited in the approved Fire Protection Program (FPP) can perform

their licensing basis functions.

The schedule for the inspection is as follows:

  • Preparation week (R-III office): July 5, 2021
  • Week 1 of onsite inspection: July 12 - 16, 2021
  • Week 2 of onsite inspection: July 26 - 30, 2021

Experience has shown that the baseline fire protection team inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into three groups.

The first group lists information necessary to aid the inspection team in choosing specific focus

areas for the inspection and to ensure that the inspection team is adequately prepared for the

inspection. It is requested that this information be provided to the lead inspector via mail or

electronically no later than May 24, 2021.

The second group of requested documents consists of those items that the team will review, or

need access to, during the inspection. Please have this information available by the first day of

the first onsite inspection week July 12, 2021.

D. Rhoades -2-

The third group lists the information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. B. Jose. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9756 or via

e-mail at Benny.Jose@nrc.gov. This letter, its enclosure, and your response (if any) will be

made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html

and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Benny Jose, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237 and 50-249

License Nos. DPR-19 and DPR-25

Enclosure:

Information Request for Fire Protection

Team Inspection

cc: Distribution via LISTSERV

D. Rhoades -3-

Letter to David Rhoades from Benny Jose dated April 6, 2021.

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR

INFORMATION: INSPECTION REPORT 05000237/2021011;

05000249/2021011

DISTRIBUTION:

Brett Titus

Mark Haire

RidsNrrDorlLpl3

RidsNrrPMDresden Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21096A175

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME BJose:mb

via e-mail

DATE 04/06/2021

OFFICIAL RECORD COPY

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

I. Information Requested Prior to the Inspection Preparation Week

The following information is requested by May 24, 2021. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to Benny Jose (e-mail address) Benny.Jose@nrc.gov. Electronic media is

preferred (e.g. via Share File System).

1. One set of hard-copy documents for facility layout drawings which identify plant fire area

delineation; areas protected by automatic fire suppression and detection; and locations

of fire protection equipment.

2. Licensing Information:

a. All NRC Safety Evaluation Reports (SERs) applicable to fire protection (specifically

including those SERs referenced by the plant fire protection license condition) and all

licensing correspondence referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard Review

Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated

licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those sections of

10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with

those fire protection features proposed or implemented by the licensee that have

been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch

Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs

issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection

features, which were accepted by the NRC staff in comprehensive fire protection

SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976

(10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report sections applicable to fire protection, FHA, and SSA

in effect at the time of original licensing.

3. Fire Protection Program:

a. A listing of changes made to the FPP since the last triennial fire protection

inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for fire

zones/areas. That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20-foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a

strategy for each selected fire zone/area;

Enclosure

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown

evaluations);

d. A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA Codes of Record);

e. List of plant deviations from code commitments and associated evaluations;

f. Fire Protection Program and/or Fire Protection Plan document;

g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA

document (if summary document not available);

h. List of the top 25 highest fire CDF scenarios for each unit;

i. List of Fire Areas/Zones ranked by contribution to CDF (i.e., ranking of highest to

lowest risk fire areas/zones);

j. List of the top 25 highest fire LERF scenarios for each unit; and

k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA

sorted by RAW and human reliability worksheets for these items.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room, and

those components used for those areas requiring alternative shutdown capability;

b. One-line schematic drawings of the electrical distribution system for 4160 Volts

alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts direct

current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot standby

and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically, such as on compact

disc, if available).

5. Operations Response for Fire Protection:

a. Plant operating procedures which specify the initial operations response to a fire

alarm or annunciator.

2

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem identification

forms and their resolution reports) since the date of the last, fire protection

inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

II. Information Requested to Be Available on First Day of the First Onsite

Inspection Week (July 12, 2021)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and compensatory

measures) for fire protection systems and components;

ii. Control of transient combustibles; and

iii. Control of hot work.

b. List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems; and

c. List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs

to be determined during inspection preparation week):

a. Coordination calculations and/or justifications that verify fuse/breaker coordination for

SSCs that are fed off of the same electrical buses as components in the protected

safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59 evaluations)

and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas;

3

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

d. Hydraulic calculations and supporting test data which demonstrate operability for

water suppression systems;

e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire protection

self-assessments.

4. Any updates to information previously provided.

5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be

determined during inspection preparation week):

a. Copy of FPP implementing procedures (e.g., administrative controls, surveillance

testing, and fire brigade);

b. Pre-fire plans for selected fire area(s); and

c. List of fire protection system design changes completed in the last three years.

6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during

inspection preparation week):

a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe

shutdown components;

b. Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures);

c. Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components;

d. Last surveillance demonstrating operability of those components operated from the

primary control stations;

e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be

reviewed (C-size paper drawings);

f. Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components;

g. List of post-fire nuclear safety capability system and component design changes

completed in the last three years; and

h. List of identified fire induced circuit failure analyses.

4

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

7. Operations:

a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected

fire area);

b. For Cold Shutdown Repairs, provide the following:

i. Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

ii. Most recent inspection and inventory results.

c. List of licensed operator Job Performance Measures for operator actions required to

achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs

and fire area);

d. For Radio communications, provide the following:

i. Communications Plan for firefighting and post-fire safe shutdown manual actions;

ii. Repeater locations;

iii. Cable routing for repeater power supply cables;

iv. Radio coverage test results; and

v. Radio Dead Spot locations in the plant.

e. Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

8. Administrative Control, Oversight, and Corrective Action Programs:

a. Self-assessments, peer assessments, and audits of fire protection activities for

the last three years;

b. Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last three years; and

c. List of fire event analysis reports for the last three years.

9. Any updates to information previously provided.

III. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

5