ML20236J295: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:.. | ||
/n 31 g | |||
Docket Nos. 50-266 | [- | ||
r 3 | |||
EJordan | Docket Nos. 50-266 DISTRIBUTION: | ||
NRC PDR' | i l | ||
Local PDR | and 50-301 Docket Files-EJordan NRC PDR' | ||
~ | |||
JPartlow Local PDR ACRS(10) 1 Mr. C. W. Fay, Vice President PDIII-3 r/f Nuclear Power Department DWigginton I | |||
Wisconsin Electric Power Company GH01ahan l | |||
231 W. Michigan Street, Room 308 PKreutzer Milwaukee, Wisconsin 53201 OGC-Bethesda i | |||
l | |||
==Dear Mr. Fay:== | ==Dear Mr. Fay:== | ||
| Line 30: | Line 35: | ||
==SUBJECT:== | ==SUBJECT:== | ||
POINTBEACHNUCLEARPOWERPLANT, UNIT 1,REACTORPRESSUIEVESSEL | POINTBEACHNUCLEARPOWERPLANT, UNIT 1,REACTORPRESSUIEVESSEL FLAW (TAC #65440) | ||
I In a letter to you dated July 9, 1987, we transmitted the staff's Safety Evaluation regarding the above subject. | |||
Krause of your staff, we have identified an error in our transmittal which requires correction. Specifically, in both the third paragraph of the cover letter, and the fifth paragraph on page 4 of the Safety Evaluation, reference | Based on a discussion with Mr. C. | ||
Krause of your staff, we have identified an error in our transmittal which requires correction. Specifically, in both the third paragraph of the cover letter, and the fifth paragraph on page 4 of the Safety Evaluation, reference is made to subarticle "IWB-3123" of Section XI of the ASME Code. This l | |||
l | reference is incorrect. The correct reference is to subarticle "IWB-3122.4." | ||
l No subarticle IWB-3123 exists for the Code Edition and Addenda applicable to Point Beach, Unit 1. | |||
This correction in no way affects the conclusions presented in our {{letter dated|date=July 9, 1987|text=July 9,1987 letter}}. | This correction in no way affects the conclusions presented in our {{letter dated|date=July 9, 1987|text=July 9,1987 letter}}. | ||
Sincerely, | Sincerely, is David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects cc: See next page 1 | ||
is David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects cc: See next page 1 | Office: | ||
Office: | LAf_PD})ll-3 PM/PDIII-3 EMTB-~ [ | ||
8708060126 870721 PDR | P9 III-3 07@h/87 Surname: | ||
Pl htzer DWagner/tg Belli DWigginton Date: | |||
07/3087 07/yd87 07/ad87 vv 1 | |||
8708060126 870721 PDR ADOCK 05000266 P | |||
PDR | |||
l Mr. C. W. Fay | l Point Beach Nuclear Plant Mr. C. W. Fay Wisconsin Electric Power Company Units 1 and 2 11 cc: | ||
11 cc: | |||
Mr. Bruce Churchill, Esq. | Mr. Bruce Churchill, Esq. | ||
Shaw, Pittman, Potts and Trowbridge | Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W. | ||
i Washington, DC 20037 Mr. James J. Zach, Manager | |||
i | ) | ||
Point Beach Nuclear Plant | Point Beach Nuclear Plant Wisconsin Electric Power Company-i | ||
Wisconsin Electric Power Company- | .6610 Nuclear Road L | ||
Two Rivers, Wisconsin 54241 | |||
Town Chairman Town of Two Creeks Route 3 | -l l | ||
Two Rivers,-Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building | Town Chairman Town of Two Creeks Route 3 Two Rivers,-Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 i | ||
Madison, Wisconsin 53702 | Regional Administrator, Region III l | ||
U.S. Nuclear Regulatory Commission i | |||
799 Roosevelt Raad Glen Ellyn, Illinois 60137 | Office of Executive Director 1 | ||
for Operations 799 Roosevelt Raad Glen Ellyn, Illinois 60137 1 | |||
l Resident Inspector's Office 1 | |||
l U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l | |||
i k | |||
i i}} | |||
i}} | |||
Latest revision as of 01:40, 3 December 2024
| ML20236J295 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/31/1987 |
| From: | Wagner D Office of Nuclear Reactor Regulation |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| TAC-65440, NUDOCS 8708060126 | |
| Download: ML20236J295 (2) | |
Text
..
/n 31 g
[-
r 3
Docket Nos. 50-266 DISTRIBUTION:
i l
and 50-301 Docket Files-EJordan NRC PDR'
~
JPartlow Local PDR ACRS(10) 1 Mr. C. W. Fay, Vice President PDIII-3 r/f Nuclear Power Department DWigginton I
Wisconsin Electric Power Company GH01ahan l
231 W. Michigan Street, Room 308 PKreutzer Milwaukee, Wisconsin 53201 OGC-Bethesda i
l
Dear Mr. Fay:
J
SUBJECT:
POINTBEACHNUCLEARPOWERPLANT, UNIT 1,REACTORPRESSUIEVESSEL FLAW (TAC #65440)
I In a letter to you dated July 9, 1987, we transmitted the staff's Safety Evaluation regarding the above subject.
Based on a discussion with Mr. C.
Krause of your staff, we have identified an error in our transmittal which requires correction. Specifically, in both the third paragraph of the cover letter, and the fifth paragraph on page 4 of the Safety Evaluation, reference is made to subarticle "IWB-3123" of Section XI of the ASME Code. This l
reference is incorrect. The correct reference is to subarticle "IWB-3122.4."
l No subarticle IWB-3123 exists for the Code Edition and Addenda applicable to Point Beach, Unit 1.
This correction in no way affects the conclusions presented in our July 9,1987 letter.
Sincerely, is David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects cc: See next page 1
Office:
LAf_PD})ll-3 PM/PDIII-3 EMTB-~ [
P9 III-3 07@h/87 Surname:
Pl htzer DWagner/tg Belli DWigginton Date:
07/3087 07/yd87 07/ad87 vv 1
8708060126 870721 PDR ADOCK 05000266 P
l Point Beach Nuclear Plant Mr. C. W. Fay Wisconsin Electric Power Company Units 1 and 2 11 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
i Washington, DC 20037 Mr. James J. Zach, Manager
)
Point Beach Nuclear Plant Wisconsin Electric Power Company-i
.6610 Nuclear Road L
Two Rivers, Wisconsin 54241
-l l
Town Chairman Town of Two Creeks Route 3 Two Rivers,-Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 i
Regional Administrator, Region III l
U.S. Nuclear Regulatory Commission i
Office of Executive Director 1
for Operations 799 Roosevelt Raad Glen Ellyn, Illinois 60137 1
l Resident Inspector's Office 1
l U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l
i k
i i