ML20236X576: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
pm Cl o p               t                             UNITED STATES g
pm Cl o p
e j
t UNITED STATES g
t NUCLEAR REGULATORY COMMISSION WASHINGTON, o.C. 2066H001
j NUCLEAR REGULATORY COMMISSION e
      '% . . . . . p                             July 29, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601
t WASHINGTON, o.C. 2066H001
'%..... p July 29, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
Line 29: Line 30:


==Dear Mr. Knubel:==
==Dear Mr. Knubel:==
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notice of issuance will be included in the Commission's next regular biweekly Federal Reoister notice.
A copy of the related Safety Evaluation is enclosed. A Notice of issuance will be included in the Commission's next regular biweekly Federal Reoister notice.
Sincerely,
Sincerely,
                                                        ./
/
                                                          /
/
                                                                      /
./
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333


Line 41: Line 41:
: 1. Amendment No.145to DPR-59
: 1. Amendment No.145to DPR-59
: 2. Safety Evaluation cc w/encls: See next page i
: 2. Safety Evaluation cc w/encls: See next page i
9808100116 980729 PDR     ADOCK 05000333                                                                           '
9808100116 980729 PDR ADOCK 05000333 P
P                      PDR
PDR


James Knubel                                         James A. FitzPatrick Nuclear Power Authority of the State                         Power Plant of New York cc:
James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc:
Mr. Gerald C. Goldstein                             Regional Administrator, Region i Assistant General Counsel                           U.S. Nuclear Regulatory Commission Power Authority of the State                         475 Allendale Road of New York                                         King of Prussia, PA 19406 1633 Broadway New York, NY 10019                                   Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office                           and Development Authority U. S. Nuclear Regulatory Commission                 Corporate Plaza West P.O. Box 136                                         286 Washington Avenue Extension Lycoming, NY 13093                                   Albany, NY 12203-6399 Mr. Harry P, Salmon, Jr.                             Mr. Richard L. Patch, Director Vice Presid it - Engineering                         Quality Assurance Power Aut' t sty of the State                       Power Authority of the State of New York                                         of New York 123 Main Street                                     123 Main Street White Plains, NY 10601                               White Plains, NY 10601 Ms. Charlane D. Faison                               Mr. Gerard Goering Director Nuclear Licensing                           28112 Bayview Drive                                                           4 Power Authority of the State                         Red Wing, MN 55066 of New York 123 Main Street                                     Mr. James Gagliardo White Plains, NY 10601                               Safety Review Committee 708 Castlewood Avenue Supervisor                                           Arlington, TX 76012 Town of Scriba Route 8, Box 382                                     Mr. Arthur Zaremba, Licensing Manager Oswego, NY 13126                                     James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeltmann                               P.O. Box 41 President and Chief Operating                       Lycoming, NY 13093 Officer Power Authority of the State                         Mr. Paul Eddy                                                                 1 of New York                                         New York State Dept. of 99 Washington Ave., Suite No. 2005                                                                                                 l Public Service                                                               :
Mr. Gerald C. Goldstein Regional Administrator, Region i Assistant General Counsel U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Harry P, Salmon, Jr.
Albany, NY 12210-2820                               3 Empire State Plaza,10th Floor                                               !
Mr. Richard L. Patch, Director Vice Presid it - Engineering Quality Assurance Power Aut' t sty of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 Ms. Charlane D. Faison Mr. Gerard Goering Director Nuclear Licensing 28112 Bayview Drive 4
Albany, NY 12223                                                               i Charles Donaldson, Esquire                                                                                                         l Assistant Attomey General                           Michael J. Colomb                                                             l New York Department of Law                           Site Executive Officer 120 Broadway                                         James A. FitzPatrick Nuclear Power Plant New York, NY 10271                                   P.O. Box 41 Lycoming, NY 13093 I
Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street Mr. James Gagliardo White Plains, NY 10601 Safety Review Committee 708 Castlewood Avenue Supervisor Arlington, TX 76012 Town of Scriba Route 8, Box 382 Mr. Arthur Zaremba, Licensing Manager Oswego, NY 13126 James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeltmann P.O. Box 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Eddy 1
of New York New York State Dept. of l
99 Washington Ave., Suite No. 2005 Public Service Albany, NY 12210-2820 3 Empire State Plaza,10th Floor Albany, NY 12223 i
Charles Donaldson, Esquire l
Assistant Attomey General Michael J. Colomb l
New York Department of Law Site Executive Officer 120 Broadway James A. FitzPatrick Nuclear Power Plant New York, NY 10271 P.O. Box 41 Lycoming, NY 13093 I
L
L


        .4
.4
  'i.
'i.
DATED: July 29. 1998-AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK 13sekst Files"                   ,
DATED: July 29. 1998-AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK 13sekst Files" PUBLIC PDI-1 Reading J. Zwolinski (A)
PUBLIC PDI-1 Reading                               .
J. Zwolinski (A)
S. Bajwa S. Little -
S. Bajwa S. Little -
J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan -
J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan -
Line 60: Line 63:
1 I
1 I
i i
i i
t f.' O i
t f.' O iL
L


4 I
4 I
  .                                                                                                                    1 Mr. James Knubel Chief NuclearOfficer Power Authority of the State of New York 123 Main Street White Plains, NY 10601 SUDJECT: ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)
1 Mr. James Knubel Chief NuclearOfficer Power Authority of the State of New York 123 Main Street White Plains, NY 10601 SUDJECT: ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)


==Dear Mr. Knubel:==
==Dear Mr. Knubel:==
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Reaister notice.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Reaister notice.
                                                                " '' Y' Original Signed by:
" '' Y' Original Signed by:
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333


==Enclosures:==
==Enclosures:==
: 1. Amendment No245to DPR-59
: 1. Amendment No245to DPR-59
: 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page DOCUMENT NAME: G:\FITZ\MA1132.AMD To re eive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with att*chment/ enclosure. "N" = No copy     n OFFICE   PM:PDI 1 ///1/ l E LAPDI1{X. l             c.PDI-1 ,,/L       l     OGC.fN d         l NAME- . JWilliams:kf'         SLittle"             SBajwa /y D'.h         h ,j, m ,,7f, DATE     07//6/96 l'           07/ lIO98            07/f!%98                 D7///%8 Official Record Copy                                             l t
: 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To re eive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with att*chment/ enclosure. "N" = No copy n
I    i u n e T F L; L . ; $ N wa l                -                                  [D k       {l 4
OFFICE PM:PDI 1 ///1/ l E LAPDI1{X. l c.PDI-1,,/L l
OGC.fN d l
NAME-. JWilliams:kf' SLittle" SBajwa /y D'.h h,j, m,,7f, DATE 07//6/96 l' 07/ IO98 07/f!%98 D7///%8 l
Official Record Copy l
t I
i u n e T F L; L. ; $ N
[D k
{ l wa l 4
l i
l i


l l
l l
DATED: July 29.1998 AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK Docket File PUBLIC PDl-1 Reading J. Zwolinski (A)
DATED: July 29.1998 AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK Docket File PUBLIC PDl-1 Reading J. Zwolinski (A)
S. Bajwa S. Little J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15
S. Bajwa S. Little J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan ACRS J. Rogge, Region I cc: Plant Service list l
,                      N. Trehan ACRS J. Rogge, Region I cc: Plant Service list l
l l
l l
l l
l l


                - Mr. James Knubel Chief Nuclear Officer Power Authenty of the State of New York 123 Main Street White Plains, NY 10601
- Mr. James Knubel Chief Nuclear Officer Power Authenty of the State of New York 123 Main Street White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
Line 92: Line 99:


==Dear Mr. Knubel:==
==Dear Mr. Knubel:==
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. OPR 59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. OPR 59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by {{letter dated|date=February 6, 1998|text=letter dated February 6,1998}}, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notict: of issuance wi!! be included in the Commission's next regular biweekly Federal @aister notice.
A copy of the related Safety Evaluation is enclosed. A Notict: of issuance wi!! be included in the Commission's next regular biweekly Federal @aister notice.
                                                                  "*    Y' Original Signed by:
Y' Original Signed by:
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333


Line 101: Line 107:
: 1. Amendment No245 to DPR-59
: 1. Amendment No245 to DPR-59
: 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page
: 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page
    ' DOCUMENT NAME: G:\FITZ\MA1132.AMD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attr.chment/ enclosure _ "N" = No copy       n OFFICE     PM.PDI-1     ///A f lE LAPDI-11% l         D.PDI-1 A         l     OGc '7N O         l NAME     JWilliams:leff"         SLitne W          SBajwa //D' A           % ,/,,,,     ,f,3
' DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attr.chment/ enclosure _ "N" = No copy n
,      DATE       07// k/98 l'           07/l h             07/t%98                 D7///198 l                                                       Official Record Copy I
OFFICE PM.PDI-1
///A f lE LAPDI-11% l D.PDI-1 A l
OGc '7N O l
NAME JWilliams:leff" SLitne SBajwa //D' A
%,/,,,,
,f,3 W
DATE 07// k/98 l' 07/l h 07/t%98 D7///198 l
Official Record Copy I
L}}
L}}

Latest revision as of 19:37, 2 December 2024

Forwards Amend 245 to License DPR-59 & Se.Amend Consists of Changes to TSs in Response to Application Transmitted by 980206 Request for Rev of Reactor Protection Sys Normal Supply Electrical Protection Assembly Undervoltage Setpoint
ML20236X576
Person / Time
Site: FitzPatrick 
Issue date: 07/29/1998
From: Williams J
NRC (Affiliation Not Assigned)
To: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20236X578 List:
References
TAC-MA1132, NUDOCS 9808100116
Download: ML20236X576 (6)


Text

pm Cl o p

t UNITED STATES g

j NUCLEAR REGULATORY COMMISSION e

t WASHINGTON, o.C. 2066H001

'%..... p July 29, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601

SUBJECT:

ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)

Dear Mr. Knubel:

The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.

A copy of the related Safety Evaluation is enclosed. A Notice of issuance will be included in the Commission's next regular biweekly Federal Reoister notice.

Sincerely,

/

/

./

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Amendment No.145to DPR-59
2. Safety Evaluation cc w/encls: See next page i

9808100116 980729 PDR ADOCK 05000333 P

PDR

James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc:

Mr. Gerald C. Goldstein Regional Administrator, Region i Assistant General Counsel U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Harry P, Salmon, Jr.

Mr. Richard L. Patch, Director Vice Presid it - Engineering Quality Assurance Power Aut' t sty of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 Ms. Charlane D. Faison Mr. Gerard Goering Director Nuclear Licensing 28112 Bayview Drive 4

Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street Mr. James Gagliardo White Plains, NY 10601 Safety Review Committee 708 Castlewood Avenue Supervisor Arlington, TX 76012 Town of Scriba Route 8, Box 382 Mr. Arthur Zaremba, Licensing Manager Oswego, NY 13126 James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeltmann P.O. Box 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Eddy 1

of New York New York State Dept. of l

99 Washington Ave., Suite No. 2005 Public Service Albany, NY 12210-2820 3 Empire State Plaza,10th Floor Albany, NY 12223 i

Charles Donaldson, Esquire l

Assistant Attomey General Michael J. Colomb l

New York Department of Law Site Executive Officer 120 Broadway James A. FitzPatrick Nuclear Power Plant New York, NY 10271 P.O. Box 41 Lycoming, NY 13093 I

L

.4

'i.

DATED: July 29. 1998-AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK 13sekst Files" PUBLIC PDI-1 Reading J. Zwolinski (A)

S. Bajwa S. Little -

J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan -

ACRS J. Rogge, Region I cc: Plant Service list 1

1 I

i i

t f.' O iL

4 I

1 Mr. James Knubel Chief NuclearOfficer Power Authority of the State of New York 123 Main Street White Plains, NY 10601 SUDJECT: ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)

Dear Mr. Knubel:

The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.

A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Reaister notice.

" Y' Original Signed by:

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Amendment No245to DPR-59
2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To re eive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with att*chment/ enclosure. "N" = No copy n

OFFICE PM:PDI 1 ///1/ l E LAPDI1{X. l c.PDI-1,,/L l

OGC.fN d l

NAME-. JWilliams:kf' SLittle" SBajwa /y D'.h h,j, m,,7f, DATE 07//6/96 l' 07/ IO98 07/f!%98 D7///%8 l

Official Record Copy l

t I

i u n e T F L; L. ; $ N

[D k

{ l wa l 4

l i

l l

DATED: July 29.1998 AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK Docket File PUBLIC PDl-1 Reading J. Zwolinski (A)

S. Bajwa S. Little J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan ACRS J. Rogge, Region I cc: Plant Service list l

l l

l l

- Mr. James Knubel Chief Nuclear Officer Power Authenty of the State of New York 123 Main Street White Plains, NY 10601

SUBJECT:

ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)

Dear Mr. Knubel:

The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. OPR 59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.

A copy of the related Safety Evaluation is enclosed. A Notict: of issuance wi!! be included in the Commission's next regular biweekly Federal @aister notice.

Y' Original Signed by:

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Amendment No245 to DPR-59
2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page

' DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attr.chment/ enclosure _ "N" = No copy n

OFFICE PM.PDI-1

///A f lE LAPDI-11% l D.PDI-1 A l

OGc '7N O l

NAME JWilliams:leff" SLitne SBajwa //D' A

%,/,,,,

,f,3 W

DATE 07// k/98 l' 07/l h 07/t%98 D7///198 l

Official Record Copy I

L