ML20236X576
| ML20236X576 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 07/29/1998 |
| From: | Williams J NRC (Affiliation Not Assigned) |
| To: | James Knubel POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20236X578 | List: |
| References | |
| TAC-MA1132, NUDOCS 9808100116 | |
| Download: ML20236X576 (6) | |
Text
pm Cl o p
t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION e
t WASHINGTON, o.C. 2066H001
'%..... p July 29, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601
SUBJECT:
ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)
Dear Mr. Knubel:
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notice of issuance will be included in the Commission's next regular biweekly Federal Reoister notice.
Sincerely,
/
/
./
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosures:
- 1. Amendment No.145to DPR-59
- 2. Safety Evaluation cc w/encls: See next page i
9808100116 980729 PDR ADOCK 05000333 P
James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc:
Mr. Gerald C. Goldstein Regional Administrator, Region i Assistant General Counsel U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Harry P, Salmon, Jr.
Mr. Richard L. Patch, Director Vice Presid it - Engineering Quality Assurance Power Aut' t sty of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 Ms. Charlane D. Faison Mr. Gerard Goering Director Nuclear Licensing 28112 Bayview Drive 4
Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street Mr. James Gagliardo White Plains, NY 10601 Safety Review Committee 708 Castlewood Avenue Supervisor Arlington, TX 76012 Town of Scriba Route 8, Box 382 Mr. Arthur Zaremba, Licensing Manager Oswego, NY 13126 James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeltmann P.O. Box 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Eddy 1
of New York New York State Dept. of l
99 Washington Ave., Suite No. 2005 Public Service Albany, NY 12210-2820 3 Empire State Plaza,10th Floor Albany, NY 12223 i
Charles Donaldson, Esquire l
Assistant Attomey General Michael J. Colomb l
New York Department of Law Site Executive Officer 120 Broadway James A. FitzPatrick Nuclear Power Plant New York, NY 10271 P.O. Box 41 Lycoming, NY 13093 I
L
.4
'i.
DATED: July 29. 1998-AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK 13sekst Files" PUBLIC PDI-1 Reading J. Zwolinski (A)
S. Bajwa S. Little -
J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan -
ACRS J. Rogge, Region I cc: Plant Service list 1
1 I
i i
t f.' O iL
4 I
1 Mr. James Knubel Chief NuclearOfficer Power Authority of the State of New York 123 Main Street White Plains, NY 10601 SUDJECT: ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)
Dear Mr. Knubel:
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Reaister notice.
" Y' Original Signed by:
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosures:
- 1. Amendment No245to DPR-59
- 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To re eive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with att*chment/ enclosure. "N" = No copy n
OFFICE PM:PDI 1 ///1/ l E LAPDI1{X. l c.PDI-1,,/L l
OGC.fN d l
NAME-. JWilliams:kf' SLittle" SBajwa /y D'.h h,j, m,,7f, DATE 07//6/96 l' 07/ IO98 07/f!%98 D7///%8 l
Official Record Copy l
t I
i u n e T F L; L. ; $ N
[D k
{ l wa l 4
l i
l l
DATED: July 29.1998 AMENDMENT NO.245 TO FACILITY OPERATING LICENSE NO. DPR-59-FITZPATRICK Docket File PUBLIC PDl-1 Reading J. Zwolinski (A)
S. Bajwa S. Little J. Williams OGC G. Hill (2), T-5 C3 W. Beckner,013/H15 N. Trehan ACRS J. Rogge, Region I cc: Plant Service list l
l l
l l
- Mr. James Knubel Chief Nuclear Officer Power Authenty of the State of New York 123 Main Street White Plains, NY 10601
SUBJECT:
ISSUANCE OF AMENDMENT FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1132)
Dear Mr. Knubel:
The Commission has issued the enclosed Amendment No.245 to Facility Operating License No. OPR 59 for the James A. FitzPatrick Nuclear Power Plant. The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 6,1998, where you had requested revision of the Reactor Protection System Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint.
A copy of the related Safety Evaluation is enclosed. A Notict: of issuance wi!! be included in the Commission's next regular biweekly Federal @aister notice.
Y' Original Signed by:
Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosures:
- 1. Amendment No245 to DPR-59
- 2. Safety Evaluation cc w/encis: See next page DISTRIBUTION: See next page
' DOCUMENT NAME: G:\\FITZ\\MA1132.AMD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attr.chment/ enclosure _ "N" = No copy n
OFFICE PM.PDI-1
///A f lE LAPDI-11% l D.PDI-1 A l
OGc '7N O l
NAME JWilliams:leff" SLitne SBajwa //D' A
%,/,,,,
,f,3 W
DATE 07// k/98 l' 07/l h 07/t%98 D7///198 l
Official Record Copy I
L