;                                                                        23 DEC 1987
..
.
.
,
.
23 DEC 1987
;
l
l
                    Docket Nos. 50-277
Docket Nos. 50-277
                                        50-278
50-278
                    Philadelphia Electric Company
Philadelphia Electric Company
                    ATTN: . Mr. J. W. Gallagher
ATTN: . Mr. J. W. Gallagher
                                Vice President
Vice President
Nuclear Operations
.'
.'
                                  Nuclear Operations
2301 Market Street
                    2301 Market Street
Philadelphia, Pennsylvania 19101
                    Philadelphia, Pennsylvania 19101
Gentlemen:
                    Gentlemen:
Subject:
                    Subject:     Inspection Report'Nos. 50-277/87-34 and 50-278/87-34
Inspection Report'Nos. 50-277/87-34 and 50-278/87-34
                    This refers to the routine safety inspection conducted by C. H. Woodard of this
This refers to the routine safety inspection conducted by C. H. Woodard of this
                    office on November 9 - 13, 1987 of activities-authorized by NRC License Nos.
office on November 9 - 13, 1987 of activities-authorized by NRC License Nos.
                    DPR-44 and DPR-56 and to the discussions of our findings held by C. H. Woodard
DPR-44 and DPR-56 and to the discussions of our findings held by C. H. Woodard
                    with D. Smith at the conclusion of the inspection.
with D. Smith at the conclusion of the inspection.
                    Areas examined during this inspection are descrit-d in the NRC Region I
Areas examined during this inspection are descrit-d in the NRC Region I
                    Inspection Report which is enclosed with this letter. Within these areas, the
Inspection Report which is enclosed with this letter. Within these areas, the
                    inspection consisted of selective examinations of procedures and representative
inspection consisted of selective examinations of procedures and representative
                    records, interviews with personnel, and observations by the inspector.
records, interviews with personnel, and observations by the inspector.
                    Within the scope of this inspection, no violations were observed.
Within the scope of this inspection, no violations were observed.
                    No reply to this letter is required. Your cooperation with us in this matter
No reply to this letter is required. Your cooperation with us in this matter
                    is appreciated.
is appreciated.
                                                                                                              *
*
                                                                  Sincerely,
Sincerely,
                                                                                                \
\\
                                                                                          ..
..
                                                                                  ,
,
                                                            '
illi m . Johnston, Acting Director
                                                                        illi m . Johnston, Acting Director
'
                                                                  Division of Reactor Safety
Division of Reactor Safety
                    Enclosures: NRC Region I Inspection Report Nos. 50-277/87-34 and 50-278/87-34
Enclosures: NRC Region I Inspection Report Nos. 50-277/87-34 and 50-278/87-34
                                                  0FFICIAL RECORD COPY           CIR PB 87-34 - 0001.0.0
0FFICIAL RECORD COPY
            8801050413 871223                                                   12/15/87
CIR PB 87-34 - 0001.0.0
            P.DR     ADOCK 05000277                                                                       \
8801050413 871223
            Q                           DCD                                                             gj/
12/15/87
                              -     -         -     ---                     --       _
P.DR
ADOCK 05000277
\\
gj/
Q
DCD
-
-
-
---
--
_


    - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ __
- _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ __
                                        -
,-
,-                                             .
                                                        ,
-
-
                                          Philadelphia Electric Company             2
.
                                          cc w/ enc 1:
,
                                          Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station
Philadelphia Electric Company
                                          John S. Kemper, Senior Vice President, Engineering and Production
2
                                          Thomas S. Shaw, Jr. , Vice President, Production
-
                                          Troy B. Conner, Jr. , Esquire
cc w/ enc 1:
                                          W. H. Hirst, Director, Joint Generation Projects Department,
Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station
                                                  Atlantic Electric
John S. Kemper, Senior Vice President, Engineering and Production
                                          G. Leitch, Nuclear Generation Manager
Thomas S. Shaw, Jr. , Vice President, Production
                                          Eugene J. Bradley, Esquire, Assistant General Counsel (Withaut Report)     l
Troy B. Conner, Jr. , Esquire
                                          Raymond L. Hovis, Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
                                          Thomas Hagette, Power Plant Siting, Nuclear Evaluations
Atlantic Electric
                                          W. M. Alden, Engineer in Charge, Licensing Section
G. Leitch, Nuclear Generation Manager
                                          Doris Poulsen, Secretary of Harford County Council
Eugene J. Bradley, Esquire, Assistant General Counsel (Withaut Report)
                                          Public Document Room (PDR)
l
                                          local Public Document Room (LPDR)                                           ;
Raymond L. Hovis, Esquire
                                          Nuclear Safety Information Center (NSIC)                                   '
Thomas Hagette, Power Plant Siting, Nuclear Evaluations
                                          NRC Resident Inspector
W. M. Alden, Engineer in Charge, Licensing Section
                                          Commonwealth of Pennsylvania
Doris Poulsen, Secretary of Harford County Council
                                          bec w/ enc 1:
Public Document Room (PDR)
                                          Region I Docket Room (with concurrences)
local Public Document Room (LPDR)
                                          Management Assistant, DRMA (w/o encl)
;
                                          Section Chief, DRP
'
                                          Robert J. Bores, DRSS
Nuclear Safety Information Center (NSIC)
                                                                                                                      i
NRC Resident Inspector
                                                                                                                      ,
Commonwealth of Pennsylvania
                                          RI:DRS           RI:DRS         Rfy RS
bec w/ enc 1:
                                          Woodard/rw       Ander on       Due
Region I Docket Room (with concurrences)
                                            e gu)             c
Management Assistant, DRMA (w/o encl)
                                          12//6/87         12// /87       12//7/87
Section Chief, DRP
                                                                      0FFICIAL RECORD COPY     CIR PB 87-34 - 0002.0.0
Robert J. Bores, DRSS
                                                                                              12/15/87
i
,
RI:DRS
RI:DRS
Rfy RS
Woodard/rw
Ander on
Due
e gu)
c
12//6/87
12// /87
12//7/87
0FFICIAL RECORD COPY
CIR PB 87-34 - 0002.0.0
12/15/87
}}
}}

Latest revision as of 07:05, 3 December 2024

Forwards Safety Insp Repts 50-277/87-34 & 50-278/87-34 on 871109-13.No Violations Noted
ML20234B007
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/23/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20234B011 List:
References
NUDOCS 8801050413
Download: ML20234B007 (2)


See also: IR 05000277/1987034

Text

- --

- -

--

-

- - -

W

..

.

.

,

.

23 DEC 1987

l

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: . Mr. J. W. Gallagher

Vice President

Nuclear Operations

.'

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection Report'Nos. 50-277/87-34 and 50-278/87-34

This refers to the routine safety inspection conducted by C. H. Woodard of this

office on November 9 - 13, 1987 of activities-authorized by NRC License Nos.

DPR-44 and DPR-56 and to the discussions of our findings held by C. H. Woodard

with D. Smith at the conclusion of the inspection.

Areas examined during this inspection are descrit-d in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

\\

..

,

illi m . Johnston, Acting Director

'

Division of Reactor Safety

Enclosures: NRC Region I Inspection Report Nos. 50-277/87-34 and 50-278/87-34

0FFICIAL RECORD COPY

CIR PB 87-34 - 0001.0.0

8801050413 871223

12/15/87

P.DR

ADOCK 05000277

\\

gj/

Q

DCD

-

-

-

---

--

_

- _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ __

,-

-

.

,

Philadelphia Electric Company

2

-

cc w/ enc 1:

Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Senior Vice President, Engineering and Production

Thomas S. Shaw, Jr. , Vice President, Production

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

G. Leitch, Nuclear Generation Manager

Eugene J. Bradley, Esquire, Assistant General Counsel (Withaut Report)

l

Raymond L. Hovis, Esquire

Thomas Hagette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Engineer in Charge, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (PDR)

local Public Document Room (LPDR)

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

Robert J. Bores, DRSS

i

,

RI:DRS

RI:DRS

Rfy RS

Woodard/rw

Ander on

Due

e gu)

c

12//6/87

12// /87

12//7/87

0FFICIAL RECORD COPY

CIR PB 87-34 - 0002.0.0

12/15/87