ML20245K088: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
4 JUN 161989 1 | 4 JUN 161989 1 | ||
Florida Power and ' Light Company | Florida Power and ' Light Company | ||
. ATTN: Mr. C. 0. Woody, Acting Senior Vice President - Nuclear j | |||
Senior Vice President - Nuclear | P. O. Box 14000 i | ||
Juno-Beach, Florida 33408-0420 j | |||
,) | |||
Gentlemen: | Gentlemen: | ||
| Line 27: | Line 28: | ||
DOCKET NOS. 50-250.AND 50-251 This acknowledges the receipt ofl your_ letter of March:27, 1989, - which - | DOCKET NOS. 50-250.AND 50-251 This acknowledges the receipt ofl your_ letter of March:27, 1989, - which - | ||
transmitted Revision 16 to the Turkey Point Physical Security Plan. | transmitted Revision 16 to the Turkey Point Physical Security Plan. | ||
Our review of the changes has found them to be consistent with the provisions of-10 CFR 50.54(p). | Our review of the changes has found them to be consistent with the provisions of-10 CFR 50.54(p). | ||
i Should you have any _ questions concerning this letter, we will. be' glad to | Accordingly, they are acceptable for inclusion into the plan. | ||
j The enclosure to your ' letter is being withheld from public disclosure because it contains Safeguards Information and must be protected.in accordance with the j | |||
provisions of 10 CFR Part 73.21. | |||
i Should you have any _ questions concerning this letter, we will. be' glad to l | |||
discuss them with you. | |||
Sincerely, ORIGINAL SIGNED BY WILLIAM E. CLINE William E. Cline, Chief. | Sincerely, ORIGINAL SIGNED BY WILLIAM E. CLINE William E. Cline, Chief. | ||
Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety-and Safeguards cc: | Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety-and Safeguards cc: | ||
1615 L Street, N.W. | K. Harris, Vice President Turkey Point Nuclear Plant P.O. Box 029100 Miami, Florida 33102 J. E. Cross, Plant Manager Turkey Point Nuclear Plant P. O. Box 029100 Miami, Florida 33102 Harold F. Reis, Esq. | ||
) | |||
Newman and Holtzinger, P.C. | |||
a 1615 L Street, N.W. | |||
Washington, DC 20036 3 | Washington, DC 20036 3 | ||
(c'c cont'd - See page 2) | (c'c cont'd - See page 2) g e | ||
e907050004 890616 | e907050004 890616 i | ||
PDR | PDR ADDCK 0500 | ||
}O F_ | |||
.7 l | |||
) | |||
Florida Power and Light Company | Florida Power and Light Company 2 | ||
JUll 16 1989 l | |||
(cc cont'd) | |||
John T. Butler, Esq. | John T. Butler, Esq. | ||
Steel, Hector and Davis | Steel, Hector and Davis J | ||
Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard | 4000 Southeast Financial Center Miami, Florida 33131-2398 Attorney General j | ||
Department of Legal Affairs j | |||
The Capitol i | |||
Tallahassee, Florida 32304 | |||
) | |||
Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard l | |||
Tallahassee, Florida 32399-0700 i | |||
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 | |||
) | |||
Administrator l | |||
Department of Environmental Regulation l | |||
Power Plant Siting Section i | Power Plant Siting Section i | ||
State of Florida | State of Florida I | ||
2600 Blair Stone Road Tallahassee, Florida 32301 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 | Twin Towers 2600 Blair Stone Road Tallahassee, Florida 32301 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Intergovernmental Coordination and Review Office of Planning and Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 State of Florida bec: (See page 3) | ||
2 Florida Power and Light Company 3 | |||
oft!N 161989 l | |||
l 1 | l 1 | ||
I bec: Document Control Desk (RG01), 42-P | I bec: Document Control Desk (RG01), 42-P l | ||
Resident Inspector | Chief, Safeguards Branch, NRR, 9D-24 j | ||
Region II Licensing File, J | |||
(50-250) (20VA), TAB 2 | |||
) | |||
Resident Inspector i | |||
A. Tillman l | |||
) | |||
1 l | 1 l | ||
l 4 | l 4 | ||
i i | i i | ||
l 1 | l 1 | ||
2 RII | 2 RII RI' pr;I j r0 | ||
\\J CP M y:tj McGuire tCrlenjak 06/g7/89 06/g}/89 06/ 7/89 | |||
_}} | |||
Latest revision as of 00:58, 2 December 2024
| ML20245K088 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/16/1989 |
| From: | Cline W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8907050004 | |
| Download: ML20245K088 (3) | |
Text
.
4 JUN 161989 1
Florida Power and ' Light Company
. ATTN: Mr. C. 0. Woody, Acting Senior Vice President - Nuclear j
P. O. Box 14000 i
Juno-Beach, Florida 33408-0420 j
,)
Gentlemen:
SUBJECT:
DOCKET NOS. 50-250.AND 50-251 This acknowledges the receipt ofl your_ letter of March:27, 1989, - which -
transmitted Revision 16 to the Turkey Point Physical Security Plan.
Our review of the changes has found them to be consistent with the provisions of-10 CFR 50.54(p).
Accordingly, they are acceptable for inclusion into the plan.
j The enclosure to your ' letter is being withheld from public disclosure because it contains Safeguards Information and must be protected.in accordance with the j
provisions of 10 CFR Part 73.21.
i Should you have any _ questions concerning this letter, we will. be' glad to l
discuss them with you.
Sincerely, ORIGINAL SIGNED BY WILLIAM E. CLINE William E. Cline, Chief.
Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety-and Safeguards cc:
K. Harris, Vice President Turkey Point Nuclear Plant P.O. Box 029100 Miami, Florida 33102 J. E. Cross, Plant Manager Turkey Point Nuclear Plant P. O. Box 029100 Miami, Florida 33102 Harold F. Reis, Esq.
)
Newman and Holtzinger, P.C.
a 1615 L Street, N.W.
Washington, DC 20036 3
(c'c cont'd - See page 2) g e
e907050004 890616 i
PDR ADDCK 0500
}O F_
.7 l
)
Florida Power and Light Company 2
JUll 16 1989 l
(cc cont'd)
John T. Butler, Esq.
Steel, Hector and Davis J
4000 Southeast Financial Center Miami, Florida 33131-2398 Attorney General j
Department of Legal Affairs j
The Capitol i
Tallahassee, Florida 32304
)
Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard l
Tallahassee, Florida 32399-0700 i
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304
)
Administrator l
Department of Environmental Regulation l
Power Plant Siting Section i
State of Florida I
Twin Towers 2600 Blair Stone Road Tallahassee, Florida 32301 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Intergovernmental Coordination and Review Office of Planning and Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 State of Florida bec: (See page 3)
2 Florida Power and Light Company 3
oft!N 161989 l
l 1
I bec: Document Control Desk (RG01), 42-P l
Chief, Safeguards Branch, NRR, 9D-24 j
Region II Licensing File, J
(50-250) (20VA), TAB 2
)
Resident Inspector i
A. Tillman l
)
1 l
l 4
i i
l 1
2 RII RI' pr;I j r0
\\J CP M y:tj McGuire tCrlenjak 06/g7/89 06/g}/89 06/ 7/89
_