ML20247D091: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_                                                                                                                                                   _ _ _ - - _ _ .
{{#Wiki_filter:_
      .      :x               :    . .
:x PURDUE UNIVERSITY SCHOOL OF NUCLEAR ENGINEERING 8
PURDUE UNIVERSITY SCHOOL OF NUCLEAR ENGINEERING                                                                           8 Director                                                                                       '
Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-182
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-182


==Dear Sirs:==
==Dear Sirs:==
 
This letter is submitted in compliance with the requirements in 10CFR 50.64 to annually update the prc cosed schedule for the conversion from HEU to LEU. The University has started 1
This letter is submitted in compliance with the requirements in 10CFR 50.64 to annually                                                 ,
the final design of the core and reflector and thermal hydraulics. The following schedule is proposed for completion of the project.
update the prc cosed schedule for the conversion from HEU to LEU. The University has started                                                   1 the final design of the core and reflector and thermal hydraulics. The following schedule is proposed for completion of the project.
August 15,1989 - Start the safety analysis repcrt.
August 15,1989 - Start the safety analysis repcrt.
!                                      December 31,1989 - Submit the safety analysis report to the NRC.
December 31,1989 - Submit the safety analysis report to the NRC.
January 1,1991 - Receive approval of the safety analysis report.
January 1,1991 - Receive approval of the safety analysis report.
Summer 1991 - Install new core. (Assuming NRC approval and the fuel can be fabricated on time.)
Summer 1991 - Install new core. (Assuming NRC approval and the fuel can be fabricated on time.)
If we can be of any further help, please feel free to contact me.
If we can be of any further help, please feel free to contact me.
1 Sincerely, l                                                                                                                                               w                           l l                                                                                                                         F.M. Clikeman Professor and Acting Head l
1 Sincerely, l
w l
l F.M. Clikeman Professor and Acting Head l
FMC/djc l
FMC/djc l
l i
l i
3;83888M838Sj;g2 P                                                                                                                       ffP NUCLEAR ENGINEERING BUILDING e West LAFAYETTE. IN 479o7 * (317 404 573o w__-_--____-. __ - - _ _ _            - _ - _ _ _ - _ - _ - _ _ _ _ _ _ _ -                  _      _}}
3;83888M838Sj;g2 ff P
P NUCLEAR ENGINEERING BUILDING e West LAFAYETTE. IN 479o7 * (317 404 573o w__-_--____-.
_}}

Latest revision as of 21:14, 1 December 2024

Provides Annual Update of Proposed Schedule for Conversion from High Enriched U to Low Enriched U.Univ Started Final Design of Core & Reflector & Thermal Hydraulics.Listed Schedule Proposed for Completion of Project
ML20247D091
Person / Time
Site: Purdue University
Issue date: 03/23/1989
From: Clikeman F
PURDUE UNIV., WEST LAFAYETTE, IN
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8903300378
Download: ML20247D091 (2)


Text

_

x PURDUE UNIVERSITY SCHOOL OF NUCLEAR ENGINEERING 8

Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-182

Dear Sirs:

This letter is submitted in compliance with the requirements in 10CFR 50.64 to annually update the prc cosed schedule for the conversion from HEU to LEU. The University has started 1

the final design of the core and reflector and thermal hydraulics. The following schedule is proposed for completion of the project.

August 15,1989 - Start the safety analysis repcrt.

December 31,1989 - Submit the safety analysis report to the NRC.

January 1,1991 - Receive approval of the safety analysis report.

Summer 1991 - Install new core. (Assuming NRC approval and the fuel can be fabricated on time.)

If we can be of any further help, please feel free to contact me.

1 Sincerely, l

w l

l F.M. Clikeman Professor and Acting Head l

FMC/djc l

l i

3;83888M838Sj;g2 ff P

P NUCLEAR ENGINEERING BUILDING e West LAFAYETTE. IN 479o7 * (317 404 573o w__-_--____-.

_