{{#Wiki_filter:l B. OPERATING DATA REPORT                                                                 l DOCKET NO.:   050-454             !
{{#Wiki_filter:l B.
UNIT: Byron One DATE:   12/10/87             i COMPILED BY:   D. J. Spitzer       !
OPERATING DATA REPORT l
TELEPHONE:   (815)234-5441       j x2023               i OPERATING STATUS
DOCKET NO.:
: 1. Reporting Period: November 1987. Gross Hours: 720 i
050-454 UNIT: Byron One DATE:
: 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)                                           l Design Electrical Rating: 1120 (MWe-net)
12/10/87 i
Max Dependable Capacity (MWe-net): NOT DETERMINED
COMPILED BY:
: 3. Power Level to Which Restricted (If Any): 1097 (Mwe-net)
D. J. Spitzer TELEPHONE:
: 4. Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)
(815)234-5441 j
I THIS MONTH YR TO DATE CUMULATIVE *
x2023 i
: 5. Report Period Hrs.                               720         8016       19345
OPERATING STATUS 1.
: 6. Rx Critical Hours                                 720         5466       14568
Reporting Period: November 1987. Gross Hours: 720 i
: 7. Rx Reserve Shutdown Hours                           0           0         37.8
2.
: 8. Hours Generator on Line                           720         5263       14217 l
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) l Design Electrical Rating: 1120 (MWe-net)
: 9. Unit Reserve Shutdown Hours                         0           0           0
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
: 10. Gross Thermal Energy (MWH)                     2272967.6 14742799.6 41288633.6
Power Level to Which Restricted (If Any): 1097 (Mwe-net) 4.
: 11. Gross Elec. Energy (MWH)                       762621     4933589     13857821
Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)
: 12. Net Elec. Energy (MWH)                         723097     4594521     13012599
I THIS MONTH YR TO DATE CUMULATIVE
: 13. Reactor Service Factor                             100           68.2         75.3
* 5.
: 14. Reactor Availability Factor                       100           68.2       76
Report Period Hrs.
: 15. Unit Service Factor                               100           66         74
720 8016 19345 6.
: 16. Unit Availability Factor                           100           66         74
Rx Critical Hours 720 5466 14568 7.
: 17. Unit Capacity Factor (MDC net)                     N/A         N/A         N/A     J
Rx Reserve Shutdown Hours 0
: 18. Unit Capacity Factor (DER net)                       90           51.2       60.1
0 37.8 8.
: 19. Unit Forced Outage Hrs.                               0         135.1       912.1
Hours Generator on Line 720 5263 14217 l
: 20. Unit Forced Outage Rate                               0           2.50         6.02
9.
Unit Reserve Shutdown Hours 0
0 0
: 10. Gross Thermal Energy (MWH) 2272967.6 14742799.6 41288633.6
: 11. Gross Elec. Energy (MWH) 762621 4933589 13857821
: 12. Net Elec. Energy (MWH) 723097 4594521 13012599
: 13. Reactor Service Factor 100 68.2 75.3
: 14. Reactor Availability Factor 100 68.2 76
: 15. Unit Service Factor 100 66 74
: 16. Unit Availability Factor 100 66 74
: 17. Unit Capacity Factor (MDC net)
N/A N/A N/A J
: 18. Unit Capacity Factor (DER net) 90 51.2 60.1
: 19. Unit Forced Outage Hrs.
0 135.1 912.1
: 20. Unit Forced Outage Rate 0
2.50 6.02
: 21. Shutdowns Scheduled Over Next 6 Months:
: 21. Shutdowns Scheduled Over Next 6 Months:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 23. Units in Test Status (Prior to Commercial Operation): None
: 23. Units in Test Status (Prior to Commercial Operation): None
* Note - The cumulative numbers do not reflect power generated prior to commercial       j service.
* Note - The cumulative numbers do not reflect power generated prior to commercial j
(0625M/0062M-4) 1     8712180020 871130 ADOCK 05000454 PDR p                  .DCD                                                                   ,g [g
service.
(0625M/0062M-4) 1 8712180020 871130
,g [g PDR ADOCK 05000454
.DCD p


                                                                                              \
\\
l'
l C.
    .- C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One           i DATE:   12/10/87         {
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One i
COMPILED BY:    D. J. Spitzer TELEPHONE:    (815)234-5441    i x2023 MONTH: November, 1937 DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)
DATE:
: 1.                971 MW                  16,                  961 MW                l I
12/10/87
: 2.                990 MW                  17.                1065 MW
: 3.              1058 MW                    18.                1073 MW
: 4.                993 MW                  19.                1071 MW
: 5.                988 EW                  20.                1047 MW 1
l      6.              1061 MW                    21.                1051 MW
: 7.              1003 MW                    22.                1051 MW                l 1
: 8.                989 MW                  23.                  979 MW                l
{
{
I l     9.               1024 MW                   24.                 987 MW l
COMPILED BY:
: 10.               1060 MW                   25.                 971 MW               3
D. J. Spitzer TELEPHONE:
: 11.               1048 MW                   26.                 960 MW                 l
(815)234-5441 i
: 12.               1000 MW                   27.                 976 MW
x2023 MONTH: November, 1937 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
: 13.               1019 MW                   28.                 819 MW l     14.               1045 MW                   29.                 826 MW l       15.             1006 MW                   30.                 1020 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)   In such casen the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
971 MW 16, 961 MW l
I 2.
990 MW 17.
1065 MW 3.
1058 MW 18.
1073 MW 4.
993 MW 19.
1071 MW 5.
988 EW 20.
1047 MW 1
l 6.
1061 MW 21.
1051 MW 7.
1003 MW 22.
1051 MW l
1 8.
989 MW 23.
979 MW l
{
I l
9.
1024 MW 24.
987 MW l
10.
1060 MW 25.
971 MW 3
11.
1048 MW 26.
960 MW l
12.
1000 MW 27.
976 MW 13.
1019 MW 28.
819 MW l
14.
1045 MW 29.
826 MW l
15.
1006 MW 30.
1020 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)
In such casen the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-5)
(0625M/0062M-5)


n e
never P
v e
r P
o t
o t
n                                   )
n
o                               t6 1
)
o 1
0
0
* o   i 0      o t                                 r1 o c                                 o0 p -
* o i
0      o A               t 0     e                 n                 eG e     e e             e       r   tRE 0     n v             n       o     e     R 0     o i               o     ff etU 0     o t               p H       ohnN 0     o c             m       s   S e(
t6 o
0     o e             o & nn           v 0 No     r             C       o o yE e 0 Oo     r                 Fii r             l 0 Ro     o             &      ttt ei 0 Yo     C                 t caneF 0 Bo                     m iurEs 0     o &              e b ra it paeR n) 0     o                 t 0     o e             s y
t r1 0
h set cE 0     o s                 xnraiL 0     o u             S EIPDL(
o0 o
.      o a 0     o C 0     o 0     o 0
c 0
* o t
o A
n e
t p -
n                              .
0 e
o p                      m       d m                       a         a S     o                       rm cadL
n eG e
                                        .o N     C O                           S re I                                 cud T                       ll S ne C     m                 aa       i cr U     e             d   uuot ue D     t               o   nnt ndh E)     s             h   aauoet R1     y             t e
e e
MMACRO
e r
  /     S ST                   M 123459 NI WN     r OU     e D(   b T     m U       u H     N S                             r R                       o T     E                       r I     L                       r N                           E U                         n       rn d                 i reo               n o                 mehi d ptt o
tRE 0
h                                     i t                 AOOc               t e                 - - - iga M                 FGHrnn tii n                           snm o                 et         eia s                 rs         Rax a                 ue             rE e               l T . yT R                 i       gr         e arnors 7       s                 F oit on 8       r                         l at e 9       u                 pt el ac 1       o             n i nuuri H               o uif gel qaeep
n v
    ,                    s e        .
n o
EMRRO&
e R
r     e.             e   - - - - -
0 o
b      p             R   ABCDE m     y                   '
i o
e    T v
ff etU 0
o N              * * *                            )
o t
                  *
p H
* 6 d      e      *
ohnN 0
* o    t       *
o c
* M i      a
m s
* y*                           2 r     D
S e(
* r*                           6 a
0 o
* a*                           0 P
e o
& nn v
0 No r
C o o yE e 0 Oo r
Fii r l
0 Ro o
ttt ei 0 Yo C
t caneF 0 Bo m
iurEs 0
o e
b ra n) 0 o
t it paeR 0
o e
s h set cE 0
o s
y xnraiL 0
o u
S EIPDL(
o a
0 o
C 0
o 0
o 0
* o tneno p
m d
m a
a S
o rm
.o N
C cadL O
S re I
cud T
ll S ne C
m aa i cr U
e d
uuot ue D
t o
nnt ndh E) s h
aauoet R1 y
t MMACRO
/
S e
ST M
123459 NI WN r
OU e
D(
b T
m U
u H
N S
r R
o T
E r
I L
r N
E U
n rn d
i reo n
o mehi o
h d ptt i
t AOOc t
e
- - - iga M
FGHrnn tii n
snm o
et eia s
rs Rax a
ue rE e
l T. yT R
i gr e
arnors 7
s F oit on 8
r l at e 9
u pt el ac 1
o n
i nuuri H
o uif gel e
s qaeep a
EMRRO&
r e.
e b
p R
ABCDE m
y e
T voN d
e o
t i
a y*
r D
r*
a a*
P
* m*
* m*
* m*
d m*
d ed 0
ed t
                                                  /
E
t            E
* u*
* u*       ce                   M r           N
ce r
* S*       rh o      . O *
N S*
* E   oc p     o   N *
rh O
* P  FS e     N       *
E oc o
* Y   - -
p o
R             * *
N P
* T  FS
FS e
N Y
R T
FS


                                                                              .J E. UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of Novsmb2r 1987 l
.J E.
: 1. Safety / Relief valve operations for Unit One.
UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of Novsmb2r 1987 l
VALVES         NO & TYPE       PLANT       DESCRIPTION l
1.
DATE         ACTUATED       ACTUATION       CONDITION   OF EVENT None l
Safety / Relief valve operations for Unit One.
: 2. Licensee generated changes to ODCM.   (Y/N)
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT l
No
None l
: 3. Indications of failed fuel.   (Y/N)
2.
Yes. I131 = 2.0 E-3 pcuries/ gram I
Licensee generated changes to ODCM.
(Y/N)
No 3.
Indications of failed fuel.
(Y/N)
Yes.
I131 = 2.0 E-3 pcuries/ gram I
I i
I i
                                                                                )
)
i
i
                                                                                .I (0625M/0062M-7) 1 i
.I (0625M/0062M-7) 1 i


F.         LICENSEE EVENT REPORTS (UNIT 1)
F.
LICENSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number     Date     Title of Occurrence 87-022-00                       10/26/87   Containment Vent Isolation caused by AR12J Spike i
Occurrence Licensee Event Report Number Date Title of Occurrence 87-022-00 10/26/87 Containment Vent Isolation caused by AR12J Spike i
(0625M/0062M-8)
(0625M/0062M-8)


p-
p-
                                . }c (,                             !''  '
. }c (,
g' i                                                         .i i g
i
II. Monthly Report for Byron Unit 2 for the month of' November 1987 J           A. Sununary of Operating Experience for' Unit 2 jr v                                                                                                              (
.i i g'
The unit began this reporting period in Mode 1 at 94% power.. The unit operated,at power levels of up.to 94% until 11/20/87 when power was deceased dui to high steam generato: cation conductivity. On 11/21/87 at 0328 the load reduction was completed at 26% reactor power. The condition was corrected and poweri4as at 88% by 0700 on.
g II. Monthly Report for Byron Unit 2 for the month of' November 1987 J
11/24/87. At 1740 on 11/25/87 a power reducti'on - for a s'cheduled .
A.
surveillance outage was begun. 'On 11/26/87 at 0200 the generator was taken off line. At 2025 on 11/26/87 Mode 5 (Cold Shutdown) was                   .
Sununary of Operating Experience for' Unit 2 jr
entered. The unit remained in mode 5 for the rest of the;r'eporting.                                       . -(
(
period.                                                                      ,-
v The unit began this reporting period in Mode 1 at 94% power.. The unit operated,at power levels of up.to 94% until 11/20/87 when power was deceased dui to high steam generato: cation conductivity. On 11/21/87 at 0328 the load reduction was completed at 26% reactor power. The condition was corrected and poweri4as at 88% by 0700 on.
l'\       ,-,'  ,;j 4
11/24/87. At 1740 on 11/25/87 a power reducti'on - for a s'cheduled.
                                                                                                          /
surveillance outage was begun. 'On 11/26/87 at 0200 the generator was taken off line. At 2025 on 11/26/87 Mode 5 (Cold Shutdown) was entered. The unit remained in mode 5 for the rest of the;r'eporting.
. -(
l'\\
,;j period.
4
/
1.
1.
(
(
                                                                                              .'\                           ',t,/ [
.'\\
                                                                                          \.0                                   y           ,
',t,/ [
\\.0 y
k.
k.
t g
t g
( .*h 1p f'                                                             ..
(.*
K;i
h 1p f'
                                                                                                            >                              4 i                               ..
K;i 4
o_
i o_
I
I
                                      -4                                                                                                       l i
-4 l
i                                                                                                   :
i i
l
l
                                                                                                                                        'l 1
'l 1
                                                                                                                                      '._ (
(0625M/0062M-9)
v                                                      l
'/
                                                                            '/
l v
(0625M/0062M-9)                                                                                                                 .]   1 b
.]
                                                                                                -_-_.__.n__.
1 b
-_-_.__.n__.


B. OPERATING DATA REPORT                                             /
B.
                      '                                                        DOCTE' NO. : 050-455 UNIT: Byron Two                           ,
OPERATING DATA REPORT
DATE:   12/10/87 COMPILED BY:   D. J. Spitzer TELEPHONE:     (S15)234-5441 x2023 OPERATING STATUS q
/
: 1. Reporting Period: November 1987. Gross Hours:         720               ,
DOCTE' NO. : 050-455 UNIT: Byron Two DATE:
l
12/10/87 COMPILED BY:
: 2. Currentiv Authorized Povar Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i Design Electrical Rating: 1120 (MWe-net)
D. J. Spitzer TELEPHONE:
(S15)234-5441 x2023 OPERATING STATUS q
1.
Reporting Period: November 1987. Gross Hours:
720 l
2.
Currentiv Authorized Povar Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (tCde-net): NOT DETERMINED l
Max Dependable Capacity (tCde-net): NOT DETERMINED l
: 3. Power Level to Which Restricted (If Any):     1055 (MWe-net)
3.
: 4. Reasons for Restriction (If Any): Steam Generater Split Flow. (65 MW)
Power Level to Which Restricted (If Any):
THIS MONIH YR TO DATE CUMULATIVM
1055 (MWe-net) 4.
: 5. Report Period Hrs.                                 720         2449           2449
Reasons for Restriction (If Any): Steam Generater Split Flow. (65 MW)
: 6. Rx Critical Hours                                 602.1       2079.1         2079.:1
THIS MONIH YR TO DATE CUMULATIVM 5.
: 7. Rx Reserve Shutdown Hours                             0               0             0
Report Period Hrs.
: 8. Hours Generator on Line                           602         2043           2043                 ;
720 2449 2449 6.
1
Rx Critical Hours 602.1 2079.1 2079.:1 7.
: 9. Unit Reserve Shutdown Hours                           0               0             0               l I
Rx Reserve Shutdown Hours 0
: 10. Gross Thennal Energy (MWH)                     1735646.4   6124186.4       6123166'.4
0 0
: 11. Gross Elec. Energy (MNH)                         582290     1995763         1995763
8.
: 12. Net Elec. Energy (MWH)                           549261     1879841         1879841
Hours Generator on Line 602 2043 2043 1
: 13. Reactor Service Factor                               84           65             85
9.
: 14. Reactor Availability Factor                           84             85             85
Unit Reserve Shutdown Hours 0
: 15. Unit Service Factor                                   84             83.4           83.4
0 0
: 16. Unit Availability Factor                             84             83.4           83.4
l I
: 17. Unit Capacity Factor (MDC net)                     N/A           U/A           ,V/A
: 10. Gross Thennal Energy (MWH) 1735646.4 6124186.4 6123166'.4
: 18. Unit Capacity Factor (7ER net)                       68.1       < 2 69           '69
: 11. Gross Elec. Energy (MNH) 582290 1995763 1995763
: 19. Unit Forttrd Outage Hrs.                               0         286           288
: 12. Net Elec. Energy (MWH) 549261 1879841 1879841
: 20. Unit Forced Outage Rate                                 0           12.3           12.3
: 13. Reactor Service Factor 84 65 85
: 21. Shutdowns Scheduled Over Next 6 Months:                               .
: 14. Reactor Availability Factor 84 85 85
: 15. Unit Service Factor 84 83.4 83.4
: 16. Unit Availability Factor 84 83.4 83.4
: 17. Unit Capacity Factor (MDC net)
N/A U/A
,V/A
: 18. Unit Capacity Factor (7ER net) 68.1
< 2 69
'69
: 19. Unit Forttrd Outage Hrs.
0 286 288
: 20. Unit Forced Outage Rate 0
12.3 12.3
: 21. Shutdowns Scheduled Over Next 6 Months:
t
t
: 22. If Shutdown at End of Report Period, Estinated Date of Startup.             12/24/87             ,
: 22. If Shutdown at End of Report Period, Estinated Date of Startup.
12/24/87
: 23. Units in Test Status (Prior to Commercial Operation): None
: 23. Units in Test Status (Prior to Commercial Operation): None
* Note - The cumulative numbers do not reflect power generated prior to commercial                       .
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
service.                                                                                      1 1
1 1
(0625M/0062M-10)
(0625M/0062M-10)
:- g
:- g
    ~M        '
~
C$ AVERAGB DAILY UNIT POWER LEVEL
C$ AVERAGB DAILY UNIT POWER LEVEL M
  . h{                                                                         DOCKET NO.:   050-455'                                                                   J W ,'
. h{
UNIT: Byron Two DATE:   12/10/87-
DOCKET NO.:
                                                                                                                                                                        .i
050-455' J
. c. ;                      ,            t   4                                COMPILED BY:   D. J. Spitzer                                                             ,
W UNIT: Byron Two
TELEPHONE:   (8151234-5441 x2023 s
. i DATE:
12/10/87-t COMPILED BY:
D. J. Spitzer
. c. ;
4 TELEPHONE:
(8151234-5441 x2023 s
MONTH:, November, 1987
MONTH:, November, 1987
                                                                                                                                                                        -i DAY         AVERAGE DAILY POER LEVEL c                                         (MWe-Net)
- i DAY AVERAGE DAILY POER LEVEL c
: 1.             j_         1003 MW                   16.         999 MW
(MWe-Net) 1.
: 2.                         946 MW               '  17,         984 MW
j_
: 3.                         942''MW                 18.       1038 MW                                                                             ;
1003 MW 16.
: 4.                         953 MW                   19.         1036 MW S.                         999 MW                   20.         1034 MW
999 MW 2.
: 6.             -
946 MW 17, 984 MW 3.
947 W         -
942''MW 18.
21.'         303 MW                                                                           i
1038 MW 4.
?                   t 345 MW
953 MW 19.
: 7.                       1009 IG                 -22.
1036 MW S.
: 8.       ;                923 MW                   23.         -638' MW
999 MW 20.
        <        s  9.                   _
1034 MW 6.
997 MW                   24.           919 MW                                                                           ,
947 W 21.'
i
303 MW i
: 10.                   -  1034 MN                   25.           825 MW
?
: 11. _                     1032 MW                   26.           -10 MW-                                                                         ;
t 7.
: 12.                       1033 MW                   27.           -15 MW
1009 IG
: 13.                       1005 MW                   28.           -11 MW
-22.
: 14.                       9F5__ MW                 29.           -9 MW 15,                         999 W                   30.           -9 MW' I
345 MW 8.
INSTRUCTIONS                             j On this form list thi tverage daily unit power level in MWe-Net'for each day                                                                       i in the reporting mosth. Compute to the nearest whole megawatt.- These figures                                                                       )
923 MW 23.
g                    will be used to plotsa graph for each reporting month. ' Note that when maximum                                                                     '
-638' MW 9.
dependable capacity is used for the net electrical rating'of the unit there may be occasions when'the daily average power level exceeds the 100% line (or
997 MW 24.
  !)                  the restricted powerflevel line.) In such cases the average daily unit power-p?                     output sheet shouldJoe footnoted to explain the apparent anomaly.
919 MW s
g-                 (0625M/0062M-11)                       b                                                                                                        j 1
i 10.
: t.                                     ,.j, r
1034 MN 25.
825 MW
: 11. _
1032 MW 26.
-10 MW-12.
1033 MW 27.
-15 MW 13.
1005 MW 28.
-11 MW 14.
9F5__ MW 29.
-9 MW 15, 999 W 30.
-9 MW' I
INSTRUCTIONS j
On this form list thi tverage daily unit power level in MWe-Net'for each day i
in the reporting mosth. Compute to the nearest whole megawatt.- These figures
)
will be used to plotsa graph for each reporting month. ' Note that when maximum g
dependable capacity is used for the net electrical rating'of the unit there
!)
may be occasions when'the daily average power level exceeds the 100% line (or the restricted powerflevel line.) In such cases the average daily unit power-p?
output sheet shouldJoe footnoted to explain the apparent anomaly.
b g-(0625M/0062M-11) j 1
t.
,.j, r
y
y
                                                                                                --x--------m.---__.     -. _ _ _ - _ - - - _ . , _ , _ _  .m-mi
--x--------m.---__.
.m-mi


u c
uce R
e R
tnever P
)
o 1
m**
t s
t6 o
n r1 o
n r
o0 o
o e
t p-o i
c n
eG o
t n
t n
e v
e r
e r
P                                              )
tRE o
o                                         t6 1
c o
m**      t      s                                    r1 o
e n
* n                                     o0 o
o e
* n    r                                    p-o
R o
* o    e                  t n                  eG o
A C
* i      c                  e       r      tRE o
g o
* t      n                  n      o      e    R o
ff etJ o
* c    o    e o
a p
* A     C     g             o       ff etJ o
H o h n N' o
* a             p   H s
e y
o h n N' o
t m
* e     y   t             m             Se(
s Se(
o v
t u
o
o
* v    t      u            o  & nn           v oN*       i     i     O             C       o o yE e eO*       t     v                     Fiir             l oR*       c   i     e           &      ttt ei
& nn v
cY*       e   t     c               t caneF eB*       r     c     n           m   i urEs n
oN*
* r     u     a           e   b             n
i i
_  o
O C
* o    d    l            t s
o o yE e eO*
it  r a'a hset cE p e )R c
t v
* C      n    l y    xnraiL o
Fiir l
* o    i S  EIPDL(
oR*
c o
c i
n o
e ttt ei cY*
e s
e t
c t caneF eB*
r c
n m
i urEs n
n r
u a
e b r a'a e )R p
o o
d l
t it c
C n
C n
l s
hset cE o
o i
y xnraiL c
C e
S EIPDL(
o v
n e
n r
o s
o u
c u
i S
e**
a t
C a
2 C
t G
i
/
n S
U m
d a
a S
t rm o
N n
n cadL O
e i
Sre I
n m
cud T
o e
o e
v r
llSne C
u c
p D
e**
aa icr U
C u
m d
a i
uuot ue D
t a
o P
S 2
o nnt ndh E)
C t
C C
_                  G    i
h aauoet R2 t
_                  /      n S    U                      m        d a          a S      t                                rm cadL o
MMACRO
_      N        n    n O        e  i                          Sre I        n    m                              cud T        o    e                    llSne C        p   D                       aa       icr U       m                       d   uuot ue D       o   P                   o   nnt ndh E)     C     C                 h   aauoet R2                               t   MMACRO
/
      /       m                       e   - - - - - -
m e
ST       e                       M   123459 NI     t WN       s OU       y   S D(     S     M T
ST e
U        r H       e S       b                                 r m                               o T       u                               r I       N                                 r N                                       E U       R                             n       rn E                             ireo               n L                             mehi             o d ptt             i d                             AOOc               t o                             - - - iga h                             FGHrnn t     5     1                           tii e
M 123459 NI t
et snm eia M                              rs       Rax n                             ue         yT rE o                           l T     gr         e s                            i a   H     H                 arnors 7       e                           Foit on 8       R                                     l at e 9                                     pt el ac 1       s                         n inuuri r         8             o   uif gel qaeep
WN s
          ,    u    1     1             s r       o   3     1             a EMRRO&
OU y
e       H                         e   - - - - -
S D(
b                                R   ABCDE m     e e     p v     y     F   S                                       )
S M
o      T           -
TU r
                                * *
H e
* 2 N                        *
S b
* 1 7     7 8     8   *    *                              -
r m
d
o T
* M o     e     /   /     *
u r
* y*                            2 i       t     0     6 r     a     2     2
I N
* r*                             6 e       D     /     /
r N
* a*                             0 0
E U
P             1     1
R n
* d 1     1
rn E
* m**        ed                  /
ireo n
t
L mehi o
* u*         ce                 M r
d ptt i
* S*         rh                 5 o        .              *
d AOOc t
* E   oc                 2 p      o     .      . *
o
* P  FS                   6
- - - iga h
:      N     5     6   *
FGHrnn t
* Y    - -                0 R                       * *
5 1
* T   FS   .
tii e
snm M
et eia rs Rax n
ue rE o
l T yT s
i gr e
a H
H arnors 7
e Foit on 8
R l at e 9
pt el ac 1
s n
inuuri r
8 o
uif gel u
1 1
s qaeep r
o 3
1 a
EMRRO&
e H
e b
R ABCDE m
e e
p v
y F
S o
T
)
N 2
7 7
1 d
8 8
o e
/
/
M i
t 0
6 y*
2 r
a 2
2 r*
6 e
D
/
/
a*
0 d
0 m**
P 1
1 ed
/
1 1
t u*
ce M
r S*
rh 5
E oc 2
o P
FS 6
p o
N 5
6 Y
0 R
T FS
(
(
:
 
* E. UNIQUE REPORTING REQUIREMENTS (UNIT 2) for'thi month of Novemb2r 1987
E.
                                                                                        ~
UNIQUE REPORTING REQUIREMENTS (UNIT 2) for'thi month of Novemb2r 1987
: 1. Safety / Relief valve operations for Unit Two.:
~
    ,                            VALVES         NO & TYPE       PLANT     DESCRIPTION DATE           ACTUATED       ACTUATION       CONDITION, OF EVENT None
1.
: 2. Licensee generated changes _to ODCM.   (Y/N)
Safety / Relief valve operations for Unit Two.:
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION, OF EVENT None 2.
Licensee generated changes _to ODCM.
(Y/N)
No -
No -
            .3. Indications of failed fuel.     (Y/N)
.3.
Yes.   .Il31 2.0E-2 pcuries/ gram i
Indications of failed fuel.
1 (0625M/0062M-13)
(Y/N)
      '                                                                                    i
Yes.
.Il31 2.0E-2 pcuries/ gram i
1 (0625M/0062M-13) i
__1_______.___
__1_______.___


1 1
1 1
F. LICENSEE DIENT REPORTS (UNIT 2)
F.
The following is a tabular summary of all ~ Licensee Event Reports for Byro'a 4 Nuclear Power Station, Unit Two, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
LICENSEE DIENT REPORTS (UNIT 2)
Occurrence Licensee Event Report Number     Date       Title of Occurrence NONE l
The following is a tabular summary of all ~ Licensee Event Reports for Byro'a 4
Nuclear Power Station, Unit Two, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Title of Occurrence NONE l
l l
l l
(0625M/0062M-14)
(0625M/0062M-14)
Line 328: Line 660:
Attschid are updates of thn Unit 1 End Unit 2 operIting dats giction for the month of October. These changes resulted from incorrect reporting of the time change that occurred during the October reporting period.
Attschid are updates of thn Unit 1 End Unit 2 operIting dats giction for the month of October. These changes resulted from incorrect reporting of the time change that occurred during the October reporting period.
l I
l I
l (0625M/0062M-15)
(0625M/0062M-15)


1
1 B.
  ,  . B. OPF)MTING DATA REPORT                                                                 j DOCKET NO.:     050-454               i UNIT: Byron On3               J DATE:   11/10/87 COMPILED BY:     D. J. Spitzer TELEPHONE:     (815)234-5441         i x2023 OPERATING STATUS l
OPF)MTING DATA REPORT j
: 1. Reporting Period: October 1987. Gross Hours:       745**                             I
DOCKET NO.:
: 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
050-454 i
UNIT: Byron On3 J
DATE:
11/10/87 COMPILED BY:
D. J. Spitzer TELEPHONE:
(815)234-5441 i
x2023 OPERATING STATUS 1.
Reporting Period: October 1987. Gross Hours:
745**
I 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED l
Max Dependable Capacity (MWe-net): NOT DETERMINED l
: 3. Power Level to Which Restricted (If Any): 1097 (MWe-net)                             i 1
3.
: 4. Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)                 !
Power Level to Which Restricted (If Any): 1097 (MWe-net) i 1
THIS MONTH YR TO DATE CUMULATIVE *
4.
: 5. Report Perios Hrs.                               745           7296       18625
Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)
: 6. Rx Critical Hours                               745           4746       13848
THIS MONTH YR TO DATE CUMULATIVE
: 7. Rx Reserve Shutdown Hours                           0             0         37.8
* 5.
: 8. Hours Generator on Line                         745           4543       13497
Report Perios Hrs.
: 9. Unit Reserve Shutdown Hours                           0             0           0
745 7296 18625 6.
: 10. Gross Thermal Energy (MWH)                   2343715     12469832     39015666
Rx Critical Hours 745 4746 13848 7.
: 11. Gross Elec. Energy (MWH)                       790337       4170968     13095200
Rx Reserve Shutdown Hours 0
: 12. Net Elec. Energy (MWH)                         749178       3871424     12289502
0 37.8 8.
: 13. Reactor Service Factor                             100             65         74.3
Hours Generator on Line 745 4543 13497 9.
: 14. Reactor Availability Factor                       100             65         75
Unit Reserve Shutdown Hours 0
: 15. Unit Service Factor                               100             63         73
0 0
: 16. Unit Availability Factor                           100             63         73
: 10. Gross Thermal Energy (MWH) 2343715 12469832 39015666
: 17. Unit Capacity Factor (MDC net)                     N/A           N/A         N/A
: 11. Gross Elec. Energy (MWH) 790337 4170968 13095200
: 18. Unit Capacity Factor (DER net)                       90           47.4       59
: 12. Net Elec. Energy (MWH) 749178 3871424 12289502
: 19. Unit Forced Outage Hrs.                               0           135.1       912.1
: 13. Reactor Service Factor 100 65 74.3
: 20. Unit Forced Outage Rate                               0             2.88         6.33
: 14. Reactor Availability Factor 100 65 75
: 15. Unit Service Factor 100 63 73
: 16. Unit Availability Factor 100 63 73
: 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
: 18. Unit Capacity Factor (DER net) 90 47.4 59
: 19. Unit Forced Outage Hrs.
0 135.1 912.1
: 20. Unit Forced Outage Rate 0
2.88 6.33
: 21. Shutdowns Scheduled Over Next 6 Months:
: 21. Shutdowns Scheduled Over Next 6 Months:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 23. Units in Test Status (Prior to Commercial Operation): See Unit 2 (II.B.23)
: 23. Units in Test Status (Prior to Commercial Operation): See Unit 2 (II.B.23)
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
        ** One more hour in period due to the time change.
** One more hour in period due to the time change.
(0625M/0062M-16) i i
(0625M/0062M-16) i i


1
1 l
                . B. OPERATING DATA REPORT                                                                                                 l DOCKET NO.: 050-455                                               )
B.
UNIT: Byron Two                                             I DATE:   11/10/87 COMPILED BY:   D. J. Spitzer TELEPHONE:   (815)234-5441 x2023 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.: 050-455
: 1. Reporting Period: October 1987. Gross Hours:       745**
)
: 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)                                                                           i Design Electrical Rating: 1120 (MWe-net)                                                                             i Max Dependable Capacity (MWe-net): NOT DETERMINED I
UNIT: Byron Two I
: 3. Power Level to Which Restricted (If Any): 1055 (MWe-net)                                                             ,
DATE:
: 4. Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)
11/10/87 COMPILED BY:
THIS MONTH YR TO DATE CUMULATIVE *
D. J. Spitzer TELEPHONE:
: 5. Report Period Hrs.                               745         1729                       1729
(815)234-5441 x2023 OPERATING STATUS 1.
: 6. Rx Critical Hours                                 699         1477                       1477
Reporting Period: October 1987. Gross Hours:
: 7. Rx Reserve Shutdown Hours                           0             0                           0
745**
: 8. Hours Gene ator on Line                           677.2       1441                       1441
2.
: 9. Unit Reserve Shutdown Hours                           0             0                           0
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i i
: 10. Gross Thermal Energy (MWH)                     1996878       4388540             4388540
Design Electrical Rating: 1120 (MWe-net)
: 11. Gross Elec. Energy (MWH)                       671579       1413473               1413473
Max Dependable Capacity (MWe-net): NOT DETERMINED I
: 12. Net Elec. Energy (MWH)                         634809       1330574               1330574
3.
: 13. Reactor Service Factor                               94           85.4                       85.4
Power Level to Which Restricted (If Any): 1055 (MWe-net) 4.
: 14. Reactor Availability Factor                         94           85.4                       85.4
Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)
: 15. Unit Service Factor                                 91           83.3                       83.3
THIS MONTH YR TO DATE CUMULATIVE
: 16. Unit Availability Factor                             91           83.3                       83.3
* 5.
: 17. Unit Capacity Factor (MDC net)                     N/A           N/A                         N/A                     i
Report Period Hrs.
: 18. Unit Capacity Factor (DER net)                       76.3         69                         69
745 1729 1729 6.
: 19. Unit Forced Outage Hrs.                             67.8       288                         288
Rx Critical Hours 699 1477 1477 7.
: 20. Unit Forced Outage Rate                               9           17                         17
Rx Reserve Shutdown Hours 0
: 21. Shutdowns Scheduled Over Next 6 Months:     11/28/87
0 0
8.
Hours Gene ator on Line 677.2 1441 1441 9.
Unit Reserve Shutdown Hours 0
0 0
: 10. Gross Thermal Energy (MWH) 1996878 4388540 4388540
: 11. Gross Elec. Energy (MWH) 671579 1413473 1413473
: 12. Net Elec. Energy (MWH) 634809 1330574 1330574
: 13. Reactor Service Factor 94 85.4 85.4
: 14. Reactor Availability Factor 94 85.4 85.4
: 15. Unit Service Factor 91 83.3 83.3
: 16. Unit Availability Factor 91 83.3 83.3
: 17. Unit Capacity Factor (MDC net)
N/A N/A N/A i
: 18. Unit Capacity Factor (DER net) 76.3 69 69
: 19. Unit Forced Outage Hrs.
67.8 288 288
: 20. Unit Forced Outage Rate 9
17 17
: 21. Shutdowns Scheduled Over Next 6 Months:
11/28/87
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 22. If Shutdown at End of Report Period, Estimated Date of Startup:
: 23. Units in Test Status (Prior to Commercial Operation):         (UNIT 2)
: 23. Units in Test Status (Prior to Commercial Operation):
Forecast                           Achieved Initial Criticality                             01/07/87                           01/09/87 Initial Electricity                             02/05/87                           02/06/87 Commercial Operation                             05/31/87                           08/21/87
(UNIT 2)
Forecast Achieved Initial Criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 Commercial Operation 05/31/87 08/21/87
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
* Note - The cumulative numbers do not reflect power generated prior to commercial service.
                    **  One more hour in time period due to the time change.
One more hour in time period due to the time change.
(0625M/0062M-17)
(0625M/0062M-17)


                                                                                                                          )
)
December 10, 1987 LTR:           BYRON 87-1181 File:           2.7.200 Director, Office of Management Information and Program Control                                                               ;
December 10, 1987 LTR:
United States Nuclear Regulatory Commission Washington, D.C.     20555 ATTN:           Document Control Desk Gentlemen:
BYRON 87-1181 File:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period November 1 through November 30, 1987.
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period November 1 through November 30, 1987.
Very truly yours,
Very truly yours, W
                                                ##    W f~ R. E. Querio Station Manager Byron Nuclear Power Station i
f~
R. E. Querio Station Manager Byron Nuclear Power Station i
REQ /DJS/bb i
REQ /DJS/bb i
cc:   A.B. Davis, NRC, Region III                                               j NRC Resident Inspector Byron                                                 i Gary Wright, Ill. Dept. of Nuclear Safety T.J. Maiman/K.L. Graesser L.D. Butterfield                                                             l Nuclear Fuel Services, PWR Plant Support                                     j L. Anastasia, Station Nuclear Engineering                                   ;
cc:
INPO Records Center L. Olshan - USNRC (0625M/0062M-1)                                                             {}
A.B. Davis, NRC, Region III j
NRC Resident Inspector Byron i
Gary Wright, Ill. Dept. of Nuclear Safety T.J. Maiman/K.L. Graesser L.D. Butterfield l
Nuclear Fuel Services, PWR Plant Support j
L. Anastasia, Station Nuclear Engineering INPO Records Center L. Olshan - USNRC (0625M/0062M-1)
{ }


1 p                                                                                                                                                             'h 1
1 p
'h 1
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l
COMMONWEALTH EDISON COMPANY l
COMMONWEALTH EDISON COMPANY l
NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455           .
NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 l
LICENSE NO. NPF-37 LICENSE NO. NPF-66 l
l l
l l                                                                                                                                                                               i l
i l
1 l
1 l
l (0625M/0062M-2)
l (0625M/0062M-2)
_ _j
_ _j


I. Monthly Report for Byron Unit I for the montn of November 1987 A. Summary of Operating Experience for Unit 1 The unit began this reporting period in Mode 1 at 98% power. The unit operated at power levels of up to 98% for the entire reporting period.
I.
Monthly Report for Byron Unit I for the montn of November 1987 A.
Summary of Operating Experience for Unit 1 The unit began this reporting period in Mode 1 at 98% power. The unit operated at power levels of up to 98% for the entire reporting period.
a (0625M/0062M-3)}}
a (0625M/0062M-3)}}

Latest revision as of 08:17, 2 December 2024

Monthly Operating Repts for Nov 1987
ML20237B979
Person / Time
Site: Byron  
Issue date: 11/30/1987
From: Querio R, Spitzer D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
BYRON-87-1181, NUDOCS 8712180020
Download: ML20237B979 (17)


Text

l B.

OPERATING DATA REPORT l

DOCKET NO.:

050-454 UNIT: Byron One DATE:

12/10/87 i

COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 j

x2023 i

OPERATING STATUS 1.

Reporting Period: November 1987. Gross Hours: 720 i

2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) l Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity (MWe-net): NOT DETERMINED 3.

Power Level to Which Restricted (If Any): 1097 (Mwe-net) 4.

Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)

I THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

720 8016 19345 6.

Rx Critical Hours 720 5466 14568 7.

Rx Reserve Shutdown Hours 0

0 37.8 8.

Hours Generator on Line 720 5263 14217 l

9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 2272967.6 14742799.6 41288633.6
11. Gross Elec. Energy (MWH) 762621 4933589 13857821
12. Net Elec. Energy (MWH) 723097 4594521 13012599
13. Reactor Service Factor 100 68.2 75.3
14. Reactor Availability Factor 100 68.2 76
15. Unit Service Factor 100 66 74
16. Unit Availability Factor 100 66 74
17. Unit Capacity Factor (MDC net)

N/A N/A N/A J

18. Unit Capacity Factor (DER net) 90 51.2 60.1
19. Unit Forced Outage Hrs.

0 135.1 912.1

20. Unit Forced Outage Rate 0

2.50 6.02

21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial j

service.

(0625M/0062M-4) 1 8712180020 871130

,g [g PDR ADOCK 05000454

.DCD p

\\

l C.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One i

DATE:

12/10/87

{

COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 i

x2023 MONTH: November, 1937 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

971 MW 16, 961 MW l

I 2.

990 MW 17.

1065 MW 3.

1058 MW 18.

1073 MW 4.

993 MW 19.

1071 MW 5.

988 EW 20.

1047 MW 1

l 6.

1061 MW 21.

1051 MW 7.

1003 MW 22.

1051 MW l

1 8.

989 MW 23.

979 MW l

{

I l

9.

1024 MW 24.

987 MW l

10.

1060 MW 25.

971 MW 3

11.

1048 MW 26.

960 MW l

12.

1000 MW 27.

976 MW 13.

1019 MW 28.

819 MW l

14.

1045 MW 29.

826 MW l

15.

1006 MW 30.

1020 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)

In such casen the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M-5)

never P

o t

n

)

o 1

0

  • o i

t6 o

t r1 0

o0 o

c 0

o A

t p -

0 e

n eG e

e e

e r

tRE 0

n v

n o

e R

0 o

i o

ff etU 0

o t

p H

ohnN 0

o c

m s

S e(

0 o

e o

& nn v

0 No r

C o o yE e 0 Oo r

Fii r l

0 Ro o

ttt ei 0 Yo C

t caneF 0 Bo m

iurEs 0

o e

b ra n) 0 o

t it paeR 0

o e

s h set cE 0

o s

y xnraiL 0

o u

S EIPDL(

o a

0 o

C 0

o 0

o 0

  • o tneno p

m d

m a

a S

o rm

.o N

C cadL O

S re I

cud T

ll S ne C

m aa i cr U

e d

uuot ue D

t o

nnt ndh E) s h

aauoet R1 y

t MMACRO

/

S e

ST M

123459 NI WN r

OU e

D(

b T

m U

u H

N S

r R

o T

E r

I L

r N

E U

n rn d

i reo n

o mehi o

h d ptt i

t AOOc t

e

- - - iga M

FGHrnn tii n

snm o

et eia s

rs Rax a

ue rE e

l T. yT R

i gr e

arnors 7

s F oit on 8

r l at e 9

u pt el ac 1

o n

i nuuri H

o uif gel e

s qaeep a

EMRRO&

r e.

e b

p R

ABCDE m

y e

T voN d

e o

t i

a y*

r D

r*

a a*

P

  • m*

d m*

ed t

E

  • u*

ce r

N S*

rh O

E oc o

p o

N P

FS e

N Y

R T

FS

.J E.

UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of Novsmb2r 1987 l

1.

Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT l

None l

2.

Licensee generated changes to ODCM.

(Y/N)

No 3.

Indications of failed fuel.

(Y/N)

Yes.

I131 = 2.0 E-3 pcuries/ gram I

I i

)

i

.I (0625M/0062M-7) 1 i

F.

LICENSEE EVENT REPORTS (UNIT 1)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence 87-022-00 10/26/87 Containment Vent Isolation caused by AR12J Spike i

(0625M/0062M-8)

p-

. }c (,

i

.i i g'

g II. Monthly Report for Byron Unit 2 for the month of' November 1987 J

A.

Sununary of Operating Experience for' Unit 2 jr

(

v The unit began this reporting period in Mode 1 at 94% power.. The unit operated,at power levels of up.to 94% until 11/20/87 when power was deceased dui to high steam generato: cation conductivity. On 11/21/87 at 0328 the load reduction was completed at 26% reactor power. The condition was corrected and poweri4as at 88% by 0700 on.

11/24/87. At 1740 on 11/25/87 a power reducti'on - for a s'cheduled.

surveillance outage was begun. 'On 11/26/87 at 0200 the generator was taken off line. At 2025 on 11/26/87 Mode 5 (Cold Shutdown) was entered. The unit remained in mode 5 for the rest of the;r'eporting.

. -(

l'\\

,;j period.

4

/

1.

(

.'\\

',t,/ [

\\.0 y

k.

t g

(.*

h 1p f'

K;i 4

i o_

I

-4 l

i i

l

'l 1

(0625M/0062M-9)

'/

l v

.]

1 b

-_-_.__.n__.

B.

OPERATING DATA REPORT

/

DOCTE' NO. : 050-455 UNIT: Byron Two DATE:

12/10/87 COMPILED BY:

D. J. Spitzer TELEPHONE:

(S15)234-5441 x2023 OPERATING STATUS q

1.

Reporting Period: November 1987. Gross Hours:

720 l

2.

Currentiv Authorized Povar Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity (tCde-net): NOT DETERMINED l

3.

Power Level to Which Restricted (If Any):

1055 (MWe-net) 4.

Reasons for Restriction (If Any): Steam Generater Split Flow. (65 MW)

THIS MONIH YR TO DATE CUMULATIVM 5.

Report Period Hrs.

720 2449 2449 6.

Rx Critical Hours 602.1 2079.1 2079.:1 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Generator on Line 602 2043 2043 1

9.

Unit Reserve Shutdown Hours 0

0 0

l I

10. Gross Thennal Energy (MWH) 1735646.4 6124186.4 6123166'.4
11. Gross Elec. Energy (MNH) 582290 1995763 1995763
12. Net Elec. Energy (MWH) 549261 1879841 1879841
13. Reactor Service Factor 84 65 85
14. Reactor Availability Factor 84 85 85
15. Unit Service Factor 84 83.4 83.4
16. Unit Availability Factor 84 83.4 83.4
17. Unit Capacity Factor (MDC net)

N/A U/A

,V/A

18. Unit Capacity Factor (7ER net) 68.1

< 2 69

'69

19. Unit Forttrd Outage Hrs.

0 286 288

20. Unit Forced Outage Rate 0

12.3 12.3

21. Shutdowns Scheduled Over Next 6 Months:

t

22. If Shutdown at End of Report Period, Estinated Date of Startup.

12/24/87

23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

1 1

(0625M/0062M-10)

- g

~

C$ AVERAGB DAILY UNIT POWER LEVEL M

. h{

DOCKET NO.:

050-455' J

W UNIT: Byron Two

. i DATE:

12/10/87-t COMPILED BY:

D. J. Spitzer

. c. ;

4 TELEPHONE:

(8151234-5441 x2023 s

MONTH:, November, 1987

- i DAY AVERAGE DAILY POER LEVEL c

(MWe-Net) 1.

j_

1003 MW 16.

999 MW 2.

946 MW 17, 984 MW 3.

942MW 18.

1038 MW 4.

953 MW 19.

1036 MW S.

999 MW 20.

1034 MW 6.

947 W 21.'

303 MW i

?

t 7.

1009 IG

-22.

345 MW 8.

923 MW 23.

-638' MW 9.

997 MW 24.

919 MW s

i 10.

1034 MN 25.

825 MW

11. _

1032 MW 26.

-10 MW-12.

1033 MW 27.

-15 MW 13.

1005 MW 28.

-11 MW 14.

9F5__ MW 29.

-9 MW 15, 999 W 30.

-9 MW' I

INSTRUCTIONS j

On this form list thi tverage daily unit power level in MWe-Net'for each day i

in the reporting mosth. Compute to the nearest whole megawatt.- These figures

)

will be used to plotsa graph for each reporting month. ' Note that when maximum g

dependable capacity is used for the net electrical rating'of the unit there

!)

may be occasions when'the daily average power level exceeds the 100% line (or the restricted powerflevel line.) In such cases the average daily unit power-p?

output sheet shouldJoe footnoted to explain the apparent anomaly.

b g-(0625M/0062M-11) j 1

t.

,.j, r

y

--x--------m.---__.

.m-mi

uce R

tnever P

)

o 1

m**

t s

t6 o

n r1 o

n r

o0 o

o e

t p-o i

c n

eG o

t n

e r

tRE o

c o

e n

o e

R o

A C

g o

ff etJ o

a p

H o h n N' o

e y

t m

s Se(

o v

t u

o

& nn v

oN*

i i

O C

o o yE e eO*

t v

Fiir l

oR*

c i

e ttt ei cY*

e t

c t caneF eB*

r c

n m

i urEs n

n r

u a

e b r a'a e )R p

o o

d l

t it c

C n

l s

hset cE o

o i

y xnraiL c

C e

S EIPDL(

o v

n e

n r

o s

o u

c u

i S

e**

a t

C a

2 C

t G

i

/

n S

U m

d a

a S

t rm o

N n

n cadL O

e i

Sre I

n m

cud T

o e

llSne C

p D

aa icr U

m d

uuot ue D

o P

o nnt ndh E)

C C

h aauoet R2 t

MMACRO

/

m e

ST e

M 123459 NI t

WN s

OU y

S D(

S M

TU r

H e

S b

r m

o T

u r

I N

r N

E U

R n

rn E

ireo n

L mehi o

d ptt i

d AOOc t

o

- - - iga h

FGHrnn t

5 1

tii e

snm M

et eia rs Rax n

ue rE o

l T yT s

i gr e

a H

H arnors 7

e Foit on 8

R l at e 9

pt el ac 1

s n

inuuri r

8 o

uif gel u

1 1

s qaeep r

o 3

1 a

EMRRO&

e H

e b

R ABCDE m

e e

p v

y F

S o

T

)

N 2

7 7

1 d

8 8

o e

/

/

M i

t 0

6 y*

2 r

a 2

2 r*

6 e

D

/

/

a*

0 d

0 m**

P 1

1 ed

/

1 1

t u*

ce M

r S*

rh 5

E oc 2

o P

FS 6

p o

N 5

6 Y

0 R

T FS

(

E.

UNIQUE REPORTING REQUIREMENTS (UNIT 2) for'thi month of Novemb2r 1987

~

1.

Safety / Relief valve operations for Unit Two.:

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION, OF EVENT None 2.

Licensee generated changes _to ODCM.

(Y/N)

No -

.3.

Indications of failed fuel.

(Y/N)

Yes.

.Il31 2.0E-2 pcuries/ gram i

1 (0625M/0062M-13) i

__1_______.___

1 1

F.

LICENSEE DIENT REPORTS (UNIT 2)

The following is a tabular summary of all ~ Licensee Event Reports for Byro'a 4

Nuclear Power Station, Unit Two, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence NONE l

l l

(0625M/0062M-14)

Attschid are updates of thn Unit 1 End Unit 2 operIting dats giction for the month of October. These changes resulted from incorrect reporting of the time change that occurred during the October reporting period.

l I

(0625M/0062M-15)

1 B.

OPF)MTING DATA REPORT j

DOCKET NO.:

050-454 i

UNIT: Byron On3 J

DATE:

11/10/87 COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 i

x2023 OPERATING STATUS 1.

Reporting Period: October 1987. Gross Hours:

745**

I 2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity (MWe-net): NOT DETERMINED l

3.

Power Level to Which Restricted (If Any): 1097 (MWe-net) i 1

4.

Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)

THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Perios Hrs.

745 7296 18625 6.

Rx Critical Hours 745 4746 13848 7.

Rx Reserve Shutdown Hours 0

0 37.8 8.

Hours Generator on Line 745 4543 13497 9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 2343715 12469832 39015666
11. Gross Elec. Energy (MWH) 790337 4170968 13095200
12. Net Elec. Energy (MWH) 749178 3871424 12289502
13. Reactor Service Factor 100 65 74.3
14. Reactor Availability Factor 100 65 75
15. Unit Service Factor 100 63 73
16. Unit Availability Factor 100 63 73
17. Unit Capacity Factor (MDC net)

N/A N/A N/A

18. Unit Capacity Factor (DER net) 90 47.4 59
19. Unit Forced Outage Hrs.

0 135.1 912.1

20. Unit Forced Outage Rate 0

2.88 6.33

21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to Commercial Operation): See Unit 2 (II.B.23)
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.
    • One more hour in period due to the time change.

(0625M/0062M-16) i i

1 l

B.

OPERATING DATA REPORT DOCKET NO.: 050-455

)

UNIT: Byron Two I

DATE:

11/10/87 COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 x2023 OPERATING STATUS 1.

Reporting Period: October 1987. Gross Hours:

745**

2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i i

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity (MWe-net): NOT DETERMINED I

3.

Power Level to Which Restricted (If Any): 1055 (MWe-net) 4.

Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)

THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

745 1729 1729 6.

Rx Critical Hours 699 1477 1477 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Gene ator on Line 677.2 1441 1441 9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 1996878 4388540 4388540
11. Gross Elec. Energy (MWH) 671579 1413473 1413473
12. Net Elec. Energy (MWH) 634809 1330574 1330574
13. Reactor Service Factor 94 85.4 85.4
14. Reactor Availability Factor 94 85.4 85.4
15. Unit Service Factor 91 83.3 83.3
16. Unit Availability Factor 91 83.3 83.3
17. Unit Capacity Factor (MDC net)

N/A N/A N/A i

18. Unit Capacity Factor (DER net) 76.3 69 69
19. Unit Forced Outage Hrs.

67.8 288 288

20. Unit Forced Outage Rate 9

17 17

21. Shutdowns Scheduled Over Next 6 Months:

11/28/87

22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to Commercial Operation):

(UNIT 2)

Forecast Achieved Initial Criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 Commercial Operation 05/31/87 08/21/87

  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

One more hour in time period due to the time change.

(0625M/0062M-17)

)

December 10, 1987 LTR:

BYRON 87-1181 File:

2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.

20555 ATTN:

Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period November 1 through November 30, 1987.

Very truly yours, W

f~

R. E. Querio Station Manager Byron Nuclear Power Station i

REQ /DJS/bb i

cc:

A.B. Davis, NRC, Region III j

NRC Resident Inspector Byron i

Gary Wright, Ill. Dept. of Nuclear Safety T.J. Maiman/K.L. Graesser L.D. Butterfield l

Nuclear Fuel Services, PWR Plant Support j

L. Anastasia, Station Nuclear Engineering INPO Records Center L. Olshan - USNRC (0625M/0062M-1)

{ }

1 p

'h 1

BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l

COMMONWEALTH EDISON COMPANY l

NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 l

l l

i l

1 l

l (0625M/0062M-2)

_ _j

I.

Monthly Report for Byron Unit I for the montn of November 1987 A.

Summary of Operating Experience for Unit 1 The unit began this reporting period in Mode 1 at 98% power. The unit operated at power levels of up to 98% for the entire reporting period.