ML20237B979
ML20237B979 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 11/30/1987 |
From: | Querio R, Spitzer D COMMONWEALTH EDISON CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
References | |
BYRON-87-1181, NUDOCS 8712180020 | |
Download: ML20237B979 (17) | |
Text
l B. OPERATING DATA REPORT l DOCKET NO.: 050-454 !
UNIT: Byron One DATE: 12/10/87 i COMPILED BY: D. J. Spitzer !
TELEPHONE: (815)234-5441 j x2023 i OPERATING STATUS
- 1. Reporting Period: November 1987. Gross Hours: 720 i
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) l Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED
- 3. Power Level to Which Restricted (If Any): 1097 (Mwe-net)
- 4. Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)
I THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 720 8016 19345
- 6. Rx Critical Hours 720 5466 14568
- 7. Rx Reserve Shutdown Hours 0 0 37.8
- 8. Hours Generator on Line 720 5263 14217 l
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 2272967.6 14742799.6 41288633.6
- 11. Gross Elec. Energy (MWH) 762621 4933589 13857821
- 12. Net Elec. Energy (MWH) 723097 4594521 13012599
- 13. Reactor Service Factor 100 68.2 75.3
- 14. Reactor Availability Factor 100 68.2 76
- 15. Unit Service Factor 100 66 74
- 16. Unit Availability Factor 100 66 74
- 17. Unit Capacity Factor (MDC net) N/A N/A N/A J
- 18. Unit Capacity Factor (DER net) 90 51.2 60.1
- 19. Unit Forced Outage Hrs. 0 135.1 912.1
- 20. Unit Forced Outage Rate 0 2.50 6.02
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial j service.
(0625M/0062M-4) 1 8712180020 871130 ADOCK 05000454 PDR p .DCD ,g [g
\
l'
.- C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One i DATE: 12/10/87 {
COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 i x2023 MONTH: November, 1937 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 5. 988 EW 20. 1047 MW 1
{
- 13. 1019 MW 28. 819 MW l 14. 1045 MW 29. 826 MW l 15. 1006 MW 30. 1020 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such casen the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-5)
n e
v e
r P
o t
n )
o t6 1
0
- o i 0 o t r1 o c o0 p -
0 o A t 0 e n eG e e e e r tRE 0 n v n o e R 0 o i o ff etU 0 o t p H ohnN 0 o c m s S e(
0 o e o & nn v 0 No r C o o yE e 0 Oo r Fii r l 0 Ro o & ttt ei 0 Yo C t caneF 0 Bo m iurEs 0 o & e b ra it paeR n) 0 o t 0 o e s y
h set cE 0 o s xnraiL 0 o u S EIPDL(
. o a 0 o C 0 o 0 o 0
- o t
n e
n .
o p m d m a a S o rm cadL
.o N C O S re I cud T ll S ne C m aa i cr U e d uuot ue D t o nnt ndh E) s h aauoet R1 y t e
MMACRO
/ S ST M 123459 NI WN r OU e D( b T m U u H N S r R o T E r I L r N E U n rn d i reo n o mehi d ptt o
h i t AOOc t e - - - iga M FGHrnn tii n snm o et eia s rs Rax a ue rE e l T . yT R i gr e arnors 7 s F oit on 8 r l at e 9 u pt el ac 1 o n i nuuri H o uif gel qaeep
, s e .
a EMRRO&
r e. e - - - - -
b p R ABCDE m y '
e T v
o N * * * )
- 6 d e *
- o t *
- M i a
- y* 2 r D
- r* 6 a
- a* 0 P
- m*
- m*
d ed 0
/
t E
- u* ce M r N
- S* rh o . O *
- E oc p o N *
- P FS e N *
- Y - -
R * *
- T FS
.J E. UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of Novsmb2r 1987 l
- 1. Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION l
DATE ACTUATED ACTUATION CONDITION OF EVENT None l
- 2. Licensee generated changes to ODCM. (Y/N)
No
- 3. Indications of failed fuel. (Y/N)
Yes. I131 = 2.0 E-3 pcuries/ gram I
I i
)
i
.I (0625M/0062M-7) 1 i
F. LICENSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Title of Occurrence 87-022-00 10/26/87 Containment Vent Isolation caused by AR12J Spike i
(0625M/0062M-8)
p-
. }c (, ! '
g' i .i i g
II. Monthly Report for Byron Unit 2 for the month of' November 1987 J A. Sununary of Operating Experience for' Unit 2 jr v (
The unit began this reporting period in Mode 1 at 94% power.. The unit operated,at power levels of up.to 94% until 11/20/87 when power was deceased dui to high steam generato: cation conductivity. On 11/21/87 at 0328 the load reduction was completed at 26% reactor power. The condition was corrected and poweri4as at 88% by 0700 on.
11/24/87. At 1740 on 11/25/87 a power reducti'on - for a s'cheduled .
surveillance outage was begun. 'On 11/26/87 at 0200 the generator was taken off line. At 2025 on 11/26/87 Mode 5 (Cold Shutdown) was .
entered. The unit remained in mode 5 for the rest of the;r'eporting. . -(
period. ,-
l'\ ,-,' ,;j 4
/
1.
(
.'\ ',t,/ [
\.0 y ,
k.
t g
( .*h 1p f' ..
K;i
> 4 i ..
o_
I
-4 l i
i :
l
'l 1
'._ (
v l
'/
(0625M/0062M-9) .] 1 b
-_-_.__.n__.
B. OPERATING DATA REPORT /
' DOCTE' NO. : 050-455 UNIT: Byron Two ,
DATE: 12/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (S15)234-5441 x2023 OPERATING STATUS q
- 1. Reporting Period: November 1987. Gross Hours: 720 ,
l
- 2. Currentiv Authorized Povar Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (tCde-net): NOT DETERMINED l
- 3. Power Level to Which Restricted (If Any): 1055 (MWe-net)
- 4. Reasons for Restriction (If Any): Steam Generater Split Flow. (65 MW)
THIS MONIH YR TO DATE CUMULATIVM
- 5. Report Period Hrs. 720 2449 2449
- 6. Rx Critical Hours 602.1 2079.1 2079.:1
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line 602 2043 2043 ;
1
- 9. Unit Reserve Shutdown Hours 0 0 0 l I
- 10. Gross Thennal Energy (MWH) 1735646.4 6124186.4 6123166'.4
- 11. Gross Elec. Energy (MNH) 582290 1995763 1995763
- 12. Net Elec. Energy (MWH) 549261 1879841 1879841
- 13. Reactor Service Factor 84 65 85
- 14. Reactor Availability Factor 84 85 85
- 15. Unit Service Factor 84 83.4 83.4
- 16. Unit Availability Factor 84 83.4 83.4
- 17. Unit Capacity Factor (MDC net) N/A U/A ,V/A
- 18. Unit Capacity Factor (7ER net) 68.1 < 2 69 '69
- 19. Unit Forttrd Outage Hrs. 0 286 288
- 20. Unit Forced Outage Rate 0 12.3 12.3
- 21. Shutdowns Scheduled Over Next 6 Months: .
t
- 22. If Shutdown at End of Report Period, Estinated Date of Startup. 12/24/87 ,
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial .
service. 1 1
(0625M/0062M-10)
- - g
~M '
C$ AVERAGB DAILY UNIT POWER LEVEL
. h{ DOCKET NO.: 050-455' J W ,'
UNIT: Byron Two DATE: 12/10/87-
.i
. c. ; , t 4 COMPILED BY: D. J. Spitzer ,
TELEPHONE: (8151234-5441 x2023 s
MONTH:, November, 1987
-i DAY AVERAGE DAILY POER LEVEL c (MWe-Net)
- 6. -
947 W -
21.' 303 MW i
? t 345 MW
- 7. 1009 IG -22.
< s 9. _
i
- 10. - 1034 MN 25. 825 MW
- 11. _ 1032 MW 26. -10 MW- ;
INSTRUCTIONS j On this form list thi tverage daily unit power level in MWe-Net'for each day i in the reporting mosth. Compute to the nearest whole megawatt.- These figures )
g will be used to plotsa graph for each reporting month. ' Note that when maximum '
dependable capacity is used for the net electrical rating'of the unit there may be occasions when'the daily average power level exceeds the 100% line (or
!) the restricted powerflevel line.) In such cases the average daily unit power-p? output sheet shouldJoe footnoted to explain the apparent anomaly.
g- (0625M/0062M-11) b j 1
- t. ,.j, r
y
--x--------m.---__. -. _ _ _ - _ - - - _ . , _ , _ _ .m-mi
u c
e R
t n
e v
e r
P )
o t6 1
m** t s r1 o
- n o0 o
- n r p-o
- o e t n eG o
- i c e r tRE o
- t n n o e R o
- c o e o
- A C g o ff etJ o
- a p H s
o h n N' o
- e y t m Se(
o
- v t u o & nn v oN* i i O C o o yE e eO* t v Fiir l oR* c i e & ttt ei
_ cY* e t c t caneF eB* r c n m i urEs n
- r u a e b n
_ o
- o d l t s
it r a'a hset cE p e )R c
- C n l y xnraiL o
- o i S EIPDL(
_ c o
n o
e s
C n
o e
v r
u c
e**
C u
a i
t a
S 2
C t
_ G i
_ / n S U m d a a S t rm cadL o
_ N n n O e i Sre I n m cud T o e llSne C p D aa icr U m d uuot ue D o P o nnt ndh E) C C h aauoet R2 t MMACRO
/ m e - - - - - -
ST e M 123459 NI t WN s OU y S D( S M T
U r H e S b r m o T u r I N r N E U R n rn E ireo n L mehi o d ptt i d AOOc t o - - - iga h FGHrnn t 5 1 tii e
et snm eia M rs Rax n ue yT rE o l T gr e s i a H H arnors 7 e Foit on 8 R l at e 9 pt el ac 1 s n inuuri r 8 o uif gel qaeep
, u 1 1 s r o 3 1 a EMRRO&
e H e - - - - -
b R ABCDE m e e p v y F S )
o T -
- *
- 2 N *
- 1 7 7 8 8 * * -
d
- M o e / / *
- y* 2 i t 0 6 r a 2 2
- r* 6 e D / /
- a* 0 0
P 1 1
- d 1 1
- m** ed /
t
- u* ce M r
- S* rh 5 o . *
- E oc 2 p o . . *
- P FS 6
- N 5 6 *
- Y - - 0 R * *
- T FS .
(
- E. UNIQUE REPORTING REQUIREMENTS (UNIT 2) for'thi month of Novemb2r 1987
~
- 1. Safety / Relief valve operations for Unit Two.:
, VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION, OF EVENT None
- 2. Licensee generated changes _to ODCM. (Y/N)
No -
.3. Indications of failed fuel. (Y/N)
Yes. .Il31 2.0E-2 pcuries/ gram i
1 (0625M/0062M-13)
' i
__1_______.___
1 1
F. LICENSEE DIENT REPORTS (UNIT 2)
The following is a tabular summary of all ~ Licensee Event Reports for Byro'a 4 Nuclear Power Station, Unit Two, submitted during the reporting period, November 1 through November 30, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Title of Occurrence NONE l
l l
(0625M/0062M-14)
Attschid are updates of thn Unit 1 End Unit 2 operIting dats giction for the month of October. These changes resulted from incorrect reporting of the time change that occurred during the October reporting period.
l I
l (0625M/0062M-15)
1
, . B. OPF)MTING DATA REPORT j DOCKET NO.: 050-454 i UNIT: Byron On3 J DATE: 11/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 i x2023 OPERATING STATUS l
- 1. Reporting Period: October 1987. Gross Hours: 745** I
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED l
- 3. Power Level to Which Restricted (If Any): 1097 (MWe-net) i 1
- 4. Reasons for Restriction (If Any): Steam Generator Split Flow (23MW) !
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Perios Hrs. 745 7296 18625
- 6. Rx Critical Hours 745 4746 13848
- 7. Rx Reserve Shutdown Hours 0 0 37.8
- 8. Hours Generator on Line 745 4543 13497
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 2343715 12469832 39015666
- 11. Gross Elec. Energy (MWH) 790337 4170968 13095200
- 12. Net Elec. Energy (MWH) 749178 3871424 12289502
- 13. Reactor Service Factor 100 65 74.3
- 14. Reactor Availability Factor 100 65 75
- 15. Unit Service Factor 100 63 73
- 16. Unit Availability Factor 100 63 73
- 17. Unit Capacity Factor (MDC net) N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 90 47.4 59
- 19. Unit Forced Outage Hrs. 0 135.1 912.1
- 20. Unit Forced Outage Rate 0 2.88 6.33
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): See Unit 2 (II.B.23)
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
- One more hour in period due to the time change.
(0625M/0062M-16) i i
1
. B. OPERATING DATA REPORT l DOCKET NO.: 050-455 )
UNIT: Byron Two I DATE: 11/10/87 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: October 1987. Gross Hours: 745**
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross) i Design Electrical Rating: 1120 (MWe-net) i Max Dependable Capacity (MWe-net): NOT DETERMINED I
- 3. Power Level to Which Restricted (If Any): 1055 (MWe-net) ,
- 4. Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 745 1729 1729
- 6. Rx Critical Hours 699 1477 1477
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Gene ator on Line 677.2 1441 1441
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 1996878 4388540 4388540
- 11. Gross Elec. Energy (MWH) 671579 1413473 1413473
- 12. Net Elec. Energy (MWH) 634809 1330574 1330574
- 13. Reactor Service Factor 94 85.4 85.4
- 14. Reactor Availability Factor 94 85.4 85.4
- 15. Unit Service Factor 91 83.3 83.3
- 16. Unit Availability Factor 91 83.3 83.3
- 17. Unit Capacity Factor (MDC net) N/A N/A N/A i
- 18. Unit Capacity Factor (DER net) 76.3 69 69
- 19. Unit Forced Outage Hrs. 67.8 288 288
- 20. Unit Forced Outage Rate 9 17 17
- 21. Shutdowns Scheduled Over Next 6 Months: 11/28/87
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): (UNIT 2)
Forecast Achieved Initial Criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 Commercial Operation 05/31/87 08/21/87
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
- One more hour in time period due to the time change.
(0625M/0062M-17)
)
December 10, 1987 LTR: BYRON 87-1181 File: 2.7.200 Director, Office of Management Information and Program Control ;
United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period November 1 through November 30, 1987.
Very truly yours,
- W f~ R. E. Querio Station Manager Byron Nuclear Power Station i
REQ /DJS/bb i
cc: A.B. Davis, NRC, Region III j NRC Resident Inspector Byron i Gary Wright, Ill. Dept. of Nuclear Safety T.J. Maiman/K.L. Graesser L.D. Butterfield l Nuclear Fuel Services, PWR Plant Support j L. Anastasia, Station Nuclear Engineering ;
INPO Records Center L. Olshan - USNRC (0625M/0062M-1) {}
1 p 'h 1
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l
COMMONWEALTH EDISON COMPANY l
NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 .
LICENSE NO. NPF-37 LICENSE NO. NPF-66 l
l l i l
1 l
l (0625M/0062M-2)
_ _j
I. Monthly Report for Byron Unit I for the montn of November 1987 A. Summary of Operating Experience for Unit 1 The unit began this reporting period in Mode 1 at 98% power. The unit operated at power levels of up to 98% for the entire reporting period.
a (0625M/0062M-3)