JOSETil M. FARLEY NUCLEAR PLAlff UNIT 2 NARRATIVE SltNARY OF OPERATIONS July, 1987 4
JOSETil M. FARLEY NUCLEAR PLAlff UNIT 2 NARRATIVE SltNARY OF OPERATIONS July, 1987 4
i There were no unit shutdowns or significant power reductions during the                                                               j month of July.                                                                                                                       1 The following major safety-related maintenance was performed in the month of July:                                                                                                                             3
i There were no unit shutdowns or significant power reductions during the j
                                                                                                                                                  /
month of July.
l
1 The following major safety-related maintenance was performed in the month of July:
: 1. Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-tenninated in accortlance with newly approved EQ terminations on a priority basis. This is still in progress.
3
: 2. The 2B battery charger was taken out of service and the spare was placed in use. The 2B battery charger was repasred.
/
: 3. Miscellaneous corrective and preventive maintenance was performed on the riiesel generators.
l 1.
Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-tenninated in accortlance with newly approved EQ terminations on a priority basis. This is still in progress.
2.
The 2B battery charger was taken out of service and the spare was placed in use.
The 2B battery charger was repasred.
3.
Miscellaneous corrective and preventive maintenance was performed on the riiesel generators.
)
)
                                                                                                                                            ~
~
8709030191 870                                                                                                                     n PDR   ADOCK OSO     64 R                 PDR
8709030191 870 n
: l.                                                   OPERATING D E REPORT L
PDR ADOCK OSO 64 R
DOCKET No. 50-348 i                                                                                         DATE                               8/4/87 COMPLETED BY                               J. D. Woodard
PDR
[ .:                                                                                  TELEPHONE (205)899-5156 l .-
 
L             OPERATING STATUS l<                                                                                 Notes L             1. Unit Name:       ~
l.
Joseph N. Farley - Unit 1 l             2. Reporting Period's     July,. 1967                               1) Cumulative data since
OPERATING D E REPORT L
!:             3. Licenced Thermal Power (MWt):         2,652                         12-1-77, date of
DOCKET No. 50-348 i
: 4. t%meplate Rating'(Gross MWe):           860                         comnercial operation
DATE 8/4/87
(.:
COMPLETED BY J. D. Woodard
[
TELEPHONE (205)899-5156 l.-
L OPERATING STATUS l<
Notes L
: 1. Unit Name:
~
Joseph N. Farley - Unit 1 l
: 2. Reporting Period's July,. 1967
: 1) Cumulative data since
: 3. Licenced Thermal Power (MWt):
2,652 12-1-77, date of
: 4. t%meplate Rating'(Gross MWe):
860 comnercial operation
: 5. Design Electrical Rating (Net NWe): 829
: 5. Design Electrical Rating (Net NWe): 829
: 6. Maximum Dependable Capacity (Gross MWe):       856.0
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable capacity (Net Ne):         825.1
856.0
            '8, If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:       N/A
: 7. Maximum Dependable capacity (Net Ne):
: 9. Power Level To Which Restricted, If Any (Net M e):         N/A l             10. Reasons For Restrictions, If Any:       N/A l.
825.1
This Month     Yr-to-Date                                 Cumalative L
'8, If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 11. Hours In Reporting Period                           744           5,087                                       84,719
N/A
: 12. Number Of hours Reactor Was Critical                 744.0         4,836.3                                     61,745.8 13.-Reactor. Reserve Shutdown Hours                       0.0                         0.0                           3,650.0
: 9. Power Level To Which Restricted, If Any (Net M e):
: 14. Hours Generator On-Line                             744.0         4,774.3                                     50,396.7
N/A l
: 15. Unit Reserve Shutdown Hours                           0.0                         0.0                               0.0
: 10. Reasons For Restrictions, If Any:
: 16. Gross sitermal Energy Generated (MWH)         1,973,035       12,480,288                                 153,807,956
N/A l.
: 17. Gross Electrical Energy Generated (MWH)         630,744       4,046,964                                 49,410,008
This Month Yr-to-Date Cumalative L
: 18. Net Electrical Energy Generated (MWH)           599,826       3,836,924                                 46,561,258
: 11. Hours In Reporting Period 744 5,087 84,719
: 19. Unit Service Factor                                 100.0             93.9                                       71.3
: 12. Number Of hours Reactor Was Critical 744.0 4,836.3 61,745.8 13.-Reactor. Reserve Shutdown Hours 0.0 0.0 3,650.0
: 20. Unit Availability Factor                             100.0               93.9                                       71.3
: 14. Hours Generator On-Line 744.0 4,774.3 50,396.7
: 31. Unit Capacity Factor (Using MDC Net)                 97.7               91.4                                       68.3
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 22. Unit Capacity Factor (Using DER Net)                 97.3               91.0                                       66.3
: 16. Gross sitermal Energy Generated (MWH) 1,973,035 12,480,288 153,807,956
: 23. Unit Forced Outage Rate                               0.0                       1.6                               9.9
: 17. Gross Electrical Energy Generated (MWH) 630,744 4,046,964 49,410,008
: 18. Net Electrical Energy Generated (MWH) 599,826 3,836,924 46,561,258
: 19. Unit Service Factor 100.0 93.9 71.3
: 20. Unit Availability Factor 100.0 93.9 71.3
: 31. Unit Capacity Factor (Using MDC Net) 97.7 91.4 68.3
: 22. Unit Capacity Factor (Using DER Net) 97.3 91.0 66.3
: 23. Unit Forced Outage Rate 0.0 1.6 9.9
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
N/A
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:                                     N/A
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):         Forecast                                   Achieved INITIAL CRITICALITY                                 08/06/77                                   08/09/77 INITIAL ELECTRICITY                                 08/20/77                                   08/18/77 COMMERCIAL OPERATION                               12/01/77                                   12/01/77 L
N/A
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 L
Form 2/34 I
Form 2/34 I
i
i
__ -__---___ --..--______ _ _ - _                -_.w
-_.w


DOCKIT NO.               50-364 j,
DOCKIT NO.
2 UNIT DATI August 5, 1987 J. D.~Woodard N                                                              '
50-364 j,
COMPLETED BY T(O
2 UNIT DATI August 5, 1987 J. D.~Woodard COMPLETED BY T(O N
      ~
~
1TLEPHONE       (205) 899-5156 July                                                              ,
1TLEPHONE (205) 899-5156 MONTil.
MONTil .                                                                                                                                            .
July DAY AVERACE DAILY POWER LEVEL DAY
DAY                 AVERACE DAILY POWER LEVEL                                         DAY
* AVERACE DAILY POWER LEVEL (hlWe-Net)
* AVERACE DAILY POWER LEVEL (hlWe-Net)                                                       .
(5tWe Net)-
(5tWe Net)-
g,                         809                                                37                   816 783                                                 1g                   813 2
g, 37 816 809 783 1g 813 2
g-3 g                  . .          . _ . . _ . .
g-g_,
g_, . - .
g,q g
g,q 812                                                                      812 4'                                                                             20 A13                                               21                   Rin 3-812                                               n                    813
3 812 4'
                      .6                                                                             ,
812 20 3-A13 21 Rin 812 813
813                                               23                   810 7
.6 n
: g.                         812                                                24 811
7 813 23 810 812 811 g.
      /                                             810L                                                                    814
24
                      .9,.                                                                             25-
/
                                                                                                                                                            ~~
.9,.
812                                                3                    815                                            .j 10
810L 25-814 812 815
                    -!!c                             811                                               27                   813 808                                                                     012 12                                                                             3 807                                               3                   809 33 0
~~
14                           809                                               30 gg                          813                                                                     809                                               i 33 16 817 1
.j 10 3
l INSTRUCTIONS                                                                                                                                           l On this form: . list the average daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to .
-!!c 811 27 813 808 012 12 3
                    , the neare:t whole me;2 watt.
809 807 3
33 0
14 809 30 813 809 i
gg 33 16 817 1
l INSTRUCTIONS l
On this form:. list the average daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to.
, the neare:t whole me;2 watt.
(997)
(997)


O 0at r
O 3
s o9 o8 W')                                                                          e e
5 o9 r
s 5'tF. u      5                                                         nsa nF s
o8 0at W'
        '. g u D. 2 0                                                      i t
e s
oaec c Di JA J(                     e v
e 5 F.
                                              ,c u    fL ur i
)
Y                  r t
s s
c            ,        L                t       i    o O.EEYE N AMTBN e
u a
s     go ,,  ,        U J                I s
't 5
n hs    af(
ns nF g
A DO                  n     i            -
0 oae D. 2 c
                                                                            .      tae t
u i Di t
a                                                      e T
JA J(
E  ND  Ei T P l
e c fL i
C w. g,ci F
,c Y
O                 Gahe     s pS K T I    EE                &t c       ,
ur v
t ie h r yt CN      L L se A ,,                 H T
u r
O D U P E MT u
o t
a
t O.EEYE c
                                              ,        N O
L s af i
dP i
U n
x EfEE0 r
o,,
o  tn C            p O                                        M C                                        E             4 H
e N MTBN hs s
T G
I J
g C w. g,c tae t
D O n
F Gahe A A i
e a
T N D s
l Ei E
O i
K T T P pS
&t t
E E c,
ie h r yt I
C N L L e A,,
H dP t s
T O U P E u
i r
D M T a
N x o O
EfEE0 C
p M
OC E
4 HT G
N IRUD 3
S 3
N O
O I
T H
,Qj u
C l
m E
5g D
,a U
a M
r E
c IE R
S l l R
: aa y
l d uu R
l E
o nnt E
u v,TG W
haau J
O eMM t
W
[E&
P O
M123 O
P T
l D
1 i
N T
A 3
C A
N I
N I
R U
O S
D 3
e F
S                                                3 N                                                 O O                                                I        --
N M
H                                                T                                  .
c I
E M
t a
I
s n
                          ,a 5g l
N W
                                    ,Qj    u            C U
T n
D E
w G
m a
e e
r ci E                                                R                        l l St R        y                                        ;
v p I
: aa R        l l
O R
E                do nnt    uu E        u              v,TG                    W               haau W        J
c Ee D
[E&                        O P                eMMA t
O i
O                                                                  M123 O  P D
S L
N l
R T
i T
P U
N T
E R
1 A
R O
C 3
l iS s
A                                      -
T N
I S        O              e         #            F N        M              c s      t    a I
"L E "ygg6 W
n e w  n                N W        T              e v p                   G O         R               c Ee                   I D         O P            L i
IN a
R           S T
O U
U       E                                       R l
sE_g@
i R                                       O S                                                s T                                                 N I
D
N                  "L a E "ygg6                   W sE_g@                       O                      )
)n T
U                                                D                         n Ygaj                        T                       i a
Ygaj U
U                       l H                         p E                         x E
ia l
e5ge                       T                       (t r                           I                         e se N
H p
T l
E x
rT u
E e5ge T
if O                      F ao N                              e
(t s
_C$$                                                 t c nn c$e$                       E                         ea
r I
                                  -          c R
e e rT N
E mne pt el J               :ninu o uif s qa e E
u if T
                                ~  g"                   R               aEMR e       - -
l ao O
                                ~                       E l
F e
i RABCD
_C$$
                                                        '            2 t
N t c nn c$e$
e a
E eae R
D O                                                                    d u ed c e r
mn c
oli d
E pt el J
l e
:nin o uif s qa e E
t FS
aEMR g"
: o.                               : :
R e - -  
N                                 FS l
~
                                                              .I
~
E RABC l
i 2
e taD O
l de d u ed c e roli t
o.
FS N
FS l
.I


    ,,r~"~~,
,,r~"~~,
* 9 r     O               %
9 r
f.
O
_.P,               v 7,-: .,
_.P, f.
e
e v 7,-:.,
                                  *\
*\\
L% B                     y                       g na                     a s uvC-               p
L% B y
        'a .;1 nAf0N       /j Ar
g na a
s uvC-p
'a.;1 nAf0N
/j Ar
{, :,
{, :,
9 O
9 O


lt
lt
    +~
+ ~
JOSEPil M. FARLEY NUCLEAR PLANT UNIT'2 NARRATIVE SlftiARY OF OPERATIONS July, 1987 p.
JOSEPil M. FARLEY NUCLEAR PLANT UNIT'2 NARRATIVE SlftiARY OF OPERATIONS July, 1987 p.
There were no unit shutdowns or significant power reductions during the
There were no unit shutdowns or significant power reductions during the month of July.
<                              month of July.                                                                       1 The following major safety-related maintenance was performed in the month of July:
1 The following major safety-related maintenance was performed in the month of July:
: 1. Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.
1.
: 2. The 2B battery charger was taken out of service and the-spare was placed in use. The 2B battery charger was repaired.
Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.
2.
The 2B battery charger was taken out of service and the-spare was placed in use. The 2B battery charger was repaired.
: 3. -Miscellaneous corrective and presentive maintenance was performed on the diesel generators.
: 3. -Miscellaneous corrective and presentive maintenance was performed on the diesel generators.
l-l l
l -
l l
1
1
                                                                            . _ _ _              _        _ ___a
_ ___a


OPERATING DATA REPORT 4
OPERATING DATA REPORT 4
DOCKET NO. 50-364
DOCKET NO.
,                                                                                      DATE   8/4/87                       ~
50-364 DATE 8/4/87
C MPLETED BY   J. D. Woodard TELEPHONE (205)899-5156 OPERATING STATUS Notes
~
: 1. Unit Name:             Joseph M. Farley - Unit 2
C MPLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STATUS Notes
: 2. Reporting Period:       July, 1987                                 1) Cumulative data since
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):         2,652                           7-30-81, date of
Joseph M. Farley - Unit 2
: 4. Nameplate Rating (Gross MWe):           860                           commercial operation
: 2. Reporting Period:
July, 1987
: 1) Cumulative data since
: 3. Licensed Thermal Power (MWt):
2,652 7-30-81, date of
: 4. Nameplate Rating (Gross MWe):
860 commercial operation
: 5. Design Electrical Rating (Net MWe): 829
: 5. Design Electrical Rating (Net MWe): 829
      ' 6. Maximum Dependable Capacity (Gross MWe):       864.9
' 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):         824.1
864.9
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:       N/A
: 7. Maximum Dependable Capacity (Net MWe):
: 9. Power Level To Which Restricted, If Any (Net MWe):           N/A
824.1
: 10. Reasons For Restrictions, If Any:       N/A
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
                                                              'Ihis Month     Yr-to-Date     Cumulative
N/A
: 11. Hours In Reporting Period                             744             5,087           52,632
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 12. Number Of Hours Reactor Was Critical                 744           4,729.6           51,085.8
N/A
: 13. Reactor Reserve Shutdown Hours                           0.0             0.0                             138.0
: 10. Reasons For Restrictions, If Any:
: 14. Hours Generator On-Line                               744.0         4,712.7           45,563.5
N/A
: 15. Unit Reserve Shutdown Hours                               0.0             0.0                               0.0
'Ihis Month Yr-to-Date Cumulative
: 16. Gross Thermal Energy Generated (MWH)           1,970,667         11,972,772     115,290,762
: 11. Hours In Reporting Period 744 5,087 52,632
: 17. Gross Electrical Energy Generated (MWH)           634,066         3,903,624       37,912,894
: 12. Number Of Hours Reactor Was Critical 744 4,729.6 51,085.8
: 18. Net Electrical Energy Generated (MWH)             603,190         3,704,984       35,954,096
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
: 19. Unit Service Factor                                   100.0             92.6                               86.6
: 14. Hours Generator On-Line 744.0 4,712.7 45,563.5
: 20. Unit Availability Factor                               100.0             92.6                               86.6
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 21. Unit Capacity Factor (Using MDC Net)                     98.4             88.4                               83.9
: 16. Gross Thermal Energy Generated (MWH) 1,970,667 11,972,772 115,290,762
: 22. Unit Capacity Factor (Using DER Net)                     97.8             87.9                               82.4
: 17. Gross Electrical Energy Generated (MWH) 634,066 3,903,624 37,912,894
: 23. Unit Forced Outage Rate                                   0.0             7.4                               4.7
: 18. Net Electrical Energy Generated (MWH) 603,190 3,704,984 35,954,096
: 19. Unit Service Factor 100.0 92.6 86.6
: 20. Unit Availability Factor 100.0 92.6 86.6
: 21. Unit Capacity Factor (Using MDC Net) 98.4 88.4 83.9
: 22. Unit Capacity Factor (Using DER Net) 97.8 87.9 82.4
: 23. Unit Forced Outage Rate 0.0 7.4 4.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance outage, 10/2/87, approximately eight weeks
Refueling / Maintenance outage, 10/2/87, approximately eight weeks
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:             N/A
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):             Forecast       Achieved INITIAL CRITICALITY                                   05/06/81         05/08/81                       l INITIAL ELECTRICITY                                 05/24/81         05/25/81                       ,
N/A
COMMERCIAL OPERATION                                 08/01/81         07/30/81 l
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 l
INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 l
Form 2/30 l
Form 2/30 l


r       o9 0at       o8                                                                  e s W                                                       s           e
3 5
  '5 F. u         )
o9 r
5                                                   nta nF s
o8 0at e
g 0                                                  io4 M.
W s
JA u D. 2             e           ,
e
t c fLDic J(
'5 F.
i t
)
v          ,c
s s
                                        ,        L Y
a u
e u
5 nt nF M. u D. 2 io4 g
r s
0 c
oro c                                              m O.EEyE                   e o ,,,         U                   nf(
Di t
NA      MTgN A
JA e
s s     t             J                  I iss
c fL J(
                                                                      - ra e t
u v
TND D0 any                                                e E          Ei f
or i
Co,i g                F O                  Gah   pS K T       T P         &t c,                                     t i e I    E E          eA,                  H                  br yt CN         L L           s           ,
,c Y
T                 h ipr n1 O         PE            u DU                      a          ,
e r
N     .
o t
x r   o   t MT          C           p O                 EfEE0 O                                   M C                                  E             4 H
L nf(
T G
m s
O.EEyE c
o,,,
U e
I is N MTgN s
s J
t s t A A D 0 any
- a ee T N D Ei Co, F
Gah f
r K T T P i g O
E pS
&t ti e E
c, E
br yt I
CN L L eA, H
ipr n1 s
T h
t O U P E u
N x r D
M T a
o O
EfEE0 C
p M
O C
E 4
HT GN I
RUD 3
S 3
N O
O I
I T
4Eu C
T m
U a
C 5cEj
)
D r
M E
c I
St E
R
: l l R
a a y
l d uu R
l E
o nn t?0 W
h a a u E
u teMM J
O W
E u#
P O
M123 P
T D
H
}
N T
A 3
C A
N I
N I
R U
O S
D 3
e a
S                                           3 N                                          O O                                            I I                                            T                                .
F N
T C
M e
    )                5cEj 4Eu  '                C U                              m a
I s
D                              r M
at N
I E                              c E                                            R                            St
W T
: lal a R            y                                  .
n ic o G
R          l                                E l
i e
d uu E          u          t?0                  W                hoa nn    a u W          J                                O                  teMM E u#                    P                              -
v p I
O                                  <
O R
M123 P                                          T    .
c E e S
D          H                          _  }
D O
A            3 N           T C
L R
A          N                              I S          O          e          a        F N          M         e s at I
i 1
N W           T         n e      ic o v p i
P 0
G O           R         c                   I D           O       i     E e              S 1           P L            R 0           E                               R l
E R
i R                               O S                                           i T                                           N I
R O
N                "i:'jeg6 W
l i
O
S i
                      .5g5                                             )
T N
U                                 g       D in 37,j                     T                        a U
"i:'jeg6 W
I I                        lp 5                         n E
IN O
                      .8;5                     T                       (t r                       I                         e es r
.5g5 D
N luT i i a >
)
O                       F<e
U g
                        .egE                   N                         t c
T in U
                        .          i nn ea e2. g$ g                E R                         mnn pt elel E                   :ninu o uif s qa e E
a 37,j I
                              .g~'             R                  aEMR e -
lp I
E i
5 n
l RAiCD      n 1           2 e
E (t
i
s
_                              a D
.8;5 T
d dedleu
r I
-                                                                  t e
e e N
_                                                                  nh i       t l     S N                                 FS t
r luT i i a >
_                                                        l
O F<e i
t c
.egE N
nn e2. g$
E ea R
mn g
el E
:ninu pt el o uif s qa e E
aEM
.g~'
ER e -
i RAiCD n
l 1
2 e
i a
D d
d le u
ed t e nh i
tS l
N FS t
l


        ~'
~'
2
UNIT 2
:.                                                                                                                                                      UNIT DATI                 August 5, 1987 e
DATI August 5, 1987 e
J. D. W dard COMPLETED BY TELEPHONE                   (205) 899-5156 310NTil '               J"IY                                                                                                       /
J. D. W dard COMPLETED BY TELEPHONE (205) 899-5156 310NTil '
i DAY           AVERACE DAILY F0WER LEVEL                                                                     DAY'           AVERACE DAILY POWER LEVEL                                                     l (5tWe-Net)                                                                                                 .
J"IY
(MWe-Net) 809                                                                               17                               816 783                                                                             }g.                             813 2
/
          ~~
i DAY AVERACE DAILY F0WER LEVEL DAY' AVERACE DAILY POWER LEVEL l
g ig-           = . _ . _ _ . . . .. - . g 9 _ .                                                                 gjq 3                                                                                                                 .. . .
(5tWe-Net)
812                                                                              ;g                               812 4
(MWe-Net) 809 17 816 783
811                                                                             21                               Rio 5.
}g.
812-                                                                             n                                813 6
813 2
7 813                                                                             23                               810 g                     812                                                                              24                               811 9,                     810                         '
~~
g-                               814
ig-
                                                                                                                                                                                        ~~
=. _. _ _..... -. g 9 _.
812                                                                              3                               815 10 11                       811                                                                             27                               813 808                                                                             g                                812 12 807                                                                             ;                                809 13 800                                                                                                              808 14                                                                                                       30 gg                       813                                                                              3;                               809 16 817 CLSTRUCEONS 1
gjq g
On this form:t. list the svens: daily unit power !cvelin MWe Net for each d:y in the reporting month., Compute to                                                                                     l
3 812 812 4
        , the neare:t whole tre;2 wast.                                                                                                                                                                       'i l
;g 5.
811 21 Rio 812-813 6
n 7
813 23 810 812 811 g
24 9,
810 g-814 812 815
~~
10 3
11 811 27 813 808 812 12 g
13 809 807 808 14 800 30 813 809 gg 3;
16 817 CLSTRUCEONS 1
On this form:t. list the svens: daily unit power !cvelin MWe Net for each d:y in the reporting month., Compute to l
, the neare:t whole tre;2 wast.
'i l
I (9/77) l
I (9/77) l
                                                                                                                !J?)'   .>  .
!J?)'
                                                                                                                                      ,  , ,3     ,-
,,3 I
I i
i


Mdling Adfr:so l         ,      Alabama Power Company
Mdling Adfr:so l
!                600 f Jorth 18th Street Post Offe.e Box 2641 Birmingh!im, Alabama 35291 T elephone 205 783-6090 H. P. Mcdonald Senior Vice President M
Alabama Power Company 600 f Jorth 18th Street Post Offe.e Box 2641 Birmingh!im, Alabama 35291 T elephone 205 783-6090 H. P. Mcdonald M
rnninoge Building                                                       /\llll)llilla Power August 13, 1987 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Senior Vice President rnninoge Building
/\\llll)llilla Power August 13, 1987 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Sir:==
==Dear Sir:==
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the July 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the July 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
If you have any questions, please advise.
Yours very trtily, Y ,;. p/
Yours very trtily, Y,;.
p/
R. P. Mcdonald RPM /BCE:mab/F-2 Enclosures xt: Director, IE (10 copies)
R. P. Mcdonald RPM /BCE:mab/F-2 Enclosures xt: Director, IE (10 copies)
Director, RII         (1 copy) d y-fp 1,
Director, RII (1 copy) d y-fp 1,
                                                                                                        --      -- --______.J}}
--______.J}}

Latest revision as of 07:19, 2 December 2024

Monthly Operating Rept for Jul 1987
ML20237H276
Person / Time
Site: Farley 
Issue date: 07/31/1987
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC
References
NUDOCS 8709030191
Download: ML20237H276 (10)


Text

'

JOSETil M. FARLEY NUCLEAR PLAlff UNIT 2 NARRATIVE SltNARY OF OPERATIONS July, 1987 4

i There were no unit shutdowns or significant power reductions during the j

month of July.

1 The following major safety-related maintenance was performed in the month of July:

3

/

l 1.

Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-tenninated in accortlance with newly approved EQ terminations on a priority basis. This is still in progress.

2.

The 2B battery charger was taken out of service and the spare was placed in use.

The 2B battery charger was repasred.

3.

Miscellaneous corrective and preventive maintenance was performed on the riiesel generators.

)

~

8709030191 870 n

PDR ADOCK OSO 64 R

PDR

l.

OPERATING D E REPORT L

DOCKET No. 50-348 i

DATE 8/4/87

(.:

COMPLETED BY J. D. Woodard

[

TELEPHONE (205)899-5156 l.-

L OPERATING STATUS l<

Notes L

1. Unit Name:

~

Joseph N. Farley - Unit 1 l

2. Reporting Period's July,. 1967
1) Cumulative data since
3. Licenced Thermal Power (MWt):

2,652 12-1-77, date of

4. t%meplate Rating'(Gross MWe):

860 comnercial operation

5. Design Electrical Rating (Net NWe): 829
6. Maximum Dependable Capacity (Gross MWe):

856.0

7. Maximum Dependable capacity (Net Ne):

825.1

'8, If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net M e):

N/A l

10. Reasons For Restrictions, If Any:

N/A l.

This Month Yr-to-Date Cumalative L

11. Hours In Reporting Period 744 5,087 84,719
12. Number Of hours Reactor Was Critical 744.0 4,836.3 61,745.8 13.-Reactor. Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 744.0 4,774.3 50,396.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross sitermal Energy Generated (MWH) 1,973,035 12,480,288 153,807,956
17. Gross Electrical Energy Generated (MWH) 630,744 4,046,964 49,410,008
18. Net Electrical Energy Generated (MWH) 599,826 3,836,924 46,561,258
19. Unit Service Factor 100.0 93.9 71.3
20. Unit Availability Factor 100.0 93.9 71.3
31. Unit Capacity Factor (Using MDC Net) 97.7 91.4 68.3
22. Unit Capacity Factor (Using DER Net) 97.3 91.0 66.3
23. Unit Forced Outage Rate 0.0 1.6 9.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 L

Form 2/34 I

i

-_.w

DOCKIT NO.

50-364 j,

2 UNIT DATI August 5, 1987 J. D.~Woodard COMPLETED BY T(O N

~

1TLEPHONE (205) 899-5156 MONTil.

July DAY AVERACE DAILY POWER LEVEL DAY

  • AVERACE DAILY POWER LEVEL (hlWe-Net)

(5tWe Net)-

g, 37 816 809 783 1g 813 2

g-g_,

g,q g

3 812 4'

812 20 3-A13 21 Rin 812 813

.6 n

7 813 23 810 812 811 g.

24

/

.9,.

810L 25-814 812 815

~~

.j 10 3

-!!c 811 27 813 808 012 12 3

809 807 3

33 0

14 809 30 813 809 i

gg 33 16 817 1

l INSTRUCTIONS l

On this form:. list the average daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to.

, the neare:t whole me;2 watt.

(997)

O 3

5 o9 r

o8 0at W'

e s

e 5 F.

)

s s

u a

't 5

ns nF g

0 oae D. 2 c

u i Di t

JA J(

e c fL i

,c Y

ur v

u r

o t

t O.EEYE c

L s af i

U n

o,,

e N MTBN hs s

I J

g C w. g,c tae t

D O n

F Gahe A A i

e a

T N D s

l Ei E

O i

K T T P pS

&t t

E E c,

ie h r yt I

C N L L e A,,

H dP t s

T O U P E u

i r

D M T a

N x o O

EfEE0 C

p M

OC E

4 HT G

N IRUD 3

S 3

N O

O I

T H

,Qj u

C l

m E

5g D

,a U

a M

r E

c IE R

S l l R

aa y

l d uu R

l E

o nnt E

u v,TG W

haau J

O eMM t

W

[E&

P O

M123 O

P T

l D

1 i

N T

A 3

C A

N I

O S

e F

N M

c I

t a

s n

N W

T n

w G

e e

v p I

O R

c Ee D

O i

S L

R T

P U

E R

R O

l iS s

T N

"L E "ygg6 W

IN a

O U

sE_g@

D

)n T

Ygaj U

ia l

H p

E x

E e5ge T

(t s

r I

e e rT N

u if T

l ao O

F e

_C$$

N t c nn c$e$

E eae R

mn c

E pt el J

nin o uif s qa e E

aEMR g"

R e - -

~

~

E RABC l

i 2

e taD O

l de d u ed c e roli t

o.

FS N

FS l

.I

,,r~"~~,

9 r

O

_.P, f.

e v 7,-:.,

  • \\

L% B y

g na a

s uvC-p

'a.;1 nAf0N

/j Ar

{, :,

9 O

lt

+ ~

JOSEPil M. FARLEY NUCLEAR PLANT UNIT'2 NARRATIVE SlftiARY OF OPERATIONS July, 1987 p.

There were no unit shutdowns or significant power reductions during the month of July.

1 The following major safety-related maintenance was performed in the month of July:

1.

Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.

2.

The 2B battery charger was taken out of service and the-spare was placed in use. The 2B battery charger was repaired.

3. -Miscellaneous corrective and presentive maintenance was performed on the diesel generators.

l -

l l

1

_ ___a

OPERATING DATA REPORT 4

DOCKET NO.

50-364 DATE 8/4/87

~

C MPLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

July, 1987

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation

5. Design Electrical Rating (Net MWe): 829

' 6. Maximum Dependable Capacity (Gross MWe):

864.9

7. Maximum Dependable Capacity (Net MWe):

824.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 5,087 52,632
12. Number Of Hours Reactor Was Critical 744 4,729.6 51,085.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 4,712.7 45,563.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,970,667 11,972,772 115,290,762
17. Gross Electrical Energy Generated (MWH) 634,066 3,903,624 37,912,894
18. Net Electrical Energy Generated (MWH) 603,190 3,704,984 35,954,096
19. Unit Service Factor 100.0 92.6 86.6
20. Unit Availability Factor 100.0 92.6 86.6
21. Unit Capacity Factor (Using MDC Net) 98.4 88.4 83.9
22. Unit Capacity Factor (Using DER Net) 97.8 87.9 82.4
23. Unit Forced Outage Rate 0.0 7.4 4.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 l

INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 l

Form 2/30 l

3 5

o9 r

o8 0at e

W s

e

'5 F.

)

s s

a u

5 nt nF M. u D. 2 io4 g

0 c

Di t

JA e

c fL J(

u v

or i

,c Y

e r

o t

L nf(

m s

O.EEyE c

o,,,

U e

I is N MTgN s

s J

t s t A A D 0 any

- a ee T N D Ei Co, F

Gah f

r K T T P i g O

E pS

&t ti e E

c, E

br yt I

CN L L eA, H

ipr n1 s

T h

t O U P E u

N x r D

M T a

o O

EfEE0 C

p M

O C

E 4

HT GN I

RUD 3

S 3

N O

O I

I T

4Eu C

T m

U a

C 5cEj

)

D r

M E

c I

St E

R

l l R

a a y

l d uu R

l E

o nn t?0 W

h a a u E

u teMM J

O W

E u#

P O

M123 P

T D

H

}

N T

A 3

C A

N I

O S

e a

F N

M e

I s

at N

W T

n ic o G

i e

v p I

O R

c E e S

D O

L R

i 1

P 0

E R

R O

l i

S i

T N

"i:'jeg6 W

IN O

.5g5 D

)

U g

T in U

a 37,j I

lp I

5 n

E (t

s

.8;5 T

r I

e e N

r luT i i a >

O F<e i

t c

.egE N

nn e2. g$

E ea R

mn g

el E

ninu pt el o uif s qa e E

aEM

.g~'

ER e -

i RAiCD n

l 1

2 e

i a

D d

d le u

ed t e nh i

tS l

N FS t

l

~'

UNIT 2

DATI August 5, 1987 e

J. D. W dard COMPLETED BY TELEPHONE (205) 899-5156 310NTil '

J"IY

/

i DAY AVERACE DAILY F0WER LEVEL DAY' AVERACE DAILY POWER LEVEL l

(5tWe-Net)

(MWe-Net) 809 17 816 783

}g.

813 2

~~

ig-

=. _. _ _..... -. g 9 _.

gjq g

3 812 812 4

g 5.

811 21 Rio 812-813 6

n 7

813 23 810 812 811 g

24 9,

810 g-814 812 815

~~

10 3

11 811 27 813 808 812 12 g

13 809 807 808 14 800 30 813 809 gg 3;

16 817 CLSTRUCEONS 1

On this form:t. list the svens: daily unit power !cvelin MWe Net for each d:y in the reporting month., Compute to l

, the neare:t whole tre;2 wast.

'i l

I (9/77) l

!J?)'

,,3 I

i

Mdling Adfr:so l

Alabama Power Company 600 f Jorth 18th Street Post Offe.e Box 2641 Birmingh!im, Alabama 35291 T elephone 205 783-6090 H. P. Mcdonald M

Senior Vice President rnninoge Building

/\\llll)llilla Power August 13, 1987 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the July 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very trtily, Y,;.

p/

R. P. Mcdonald RPM /BCE:mab/F-2 Enclosures xt: Director, IE (10 copies)

Director, RII (1 copy) d y-fp 1,

--______.J