ML20237H276
| ML20237H276 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/31/1987 |
| From: | Mcdonald R, Woodard J ALABAMA POWER CO. |
| To: | NRC |
| References | |
| NUDOCS 8709030191 | |
| Download: ML20237H276 (10) | |
Text
'
JOSETil M. FARLEY NUCLEAR PLAlff UNIT 2 NARRATIVE SltNARY OF OPERATIONS July, 1987 4
i There were no unit shutdowns or significant power reductions during the j
month of July.
1 The following major safety-related maintenance was performed in the month of July:
3
/
l 1.
Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-tenninated in accortlance with newly approved EQ terminations on a priority basis. This is still in progress.
2.
The 2B battery charger was taken out of service and the spare was placed in use.
The 2B battery charger was repasred.
3.
Miscellaneous corrective and preventive maintenance was performed on the riiesel generators.
)
~
8709030191 870 n
PDR ADOCK OSO 64 R
l.
OPERATING D E REPORT L
DOCKET No. 50-348 i
DATE 8/4/87
(.:
COMPLETED BY J. D. Woodard
[
TELEPHONE (205)899-5156 l.-
L OPERATING STATUS l<
Notes L
- 1. Unit Name:
~
Joseph N. Farley - Unit 1 l
- 2. Reporting Period's July,. 1967
- 1) Cumulative data since
- 3. Licenced Thermal Power (MWt):
2,652 12-1-77, date of
- 4. t%meplate Rating'(Gross MWe):
860 comnercial operation
- 5. Design Electrical Rating (Net NWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
856.0
- 7. Maximum Dependable capacity (Net Ne):
825.1
'8, If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net M e):
N/A l
- 10. Reasons For Restrictions, If Any:
N/A l.
This Month Yr-to-Date Cumalative L
- 11. Hours In Reporting Period 744 5,087 84,719
- 12. Number Of hours Reactor Was Critical 744.0 4,836.3 61,745.8 13.-Reactor. Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 744.0 4,774.3 50,396.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross sitermal Energy Generated (MWH) 1,973,035 12,480,288 153,807,956
- 17. Gross Electrical Energy Generated (MWH) 630,744 4,046,964 49,410,008
- 18. Net Electrical Energy Generated (MWH) 599,826 3,836,924 46,561,258
- 19. Unit Service Factor 100.0 93.9 71.3
- 20. Unit Availability Factor 100.0 93.9 71.3
- 31. Unit Capacity Factor (Using MDC Net) 97.7 91.4 68.3
- 22. Unit Capacity Factor (Using DER Net) 97.3 91.0 66.3
- 23. Unit Forced Outage Rate 0.0 1.6 9.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 L
Form 2/34 I
i
-_.w
DOCKIT NO.
50-364 j,
2 UNIT DATI August 5, 1987 J. D.~Woodard COMPLETED BY T(O N
~
1TLEPHONE (205) 899-5156 MONTil.
July DAY AVERACE DAILY POWER LEVEL DAY
- AVERACE DAILY POWER LEVEL (hlWe-Net)
(5tWe Net)-
g, 37 816 809 783 1g 813 2
g-g_,
g,q g
3 812 4'
812 20 3-A13 21 Rin 812 813
.6 n
7 813 23 810 812 811 g.
24
/
.9,.
810L 25-814 812 815
~~
.j 10 3
-!!c 811 27 813 808 012 12 3
809 807 3
33 0
14 809 30 813 809 i
gg 33 16 817 1
l INSTRUCTIONS l
On this form:. list the average daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to.
, the neare:t whole me;2 watt.
(997)
O 3
5 o9 r
o8 0at W'
e s
e 5 F.
)
s s
u a
't 5
ns nF g
0 oae D. 2 c
u i Di t
JA J(
e c fL i
,c Y
ur v
u r
o t
t O.EEYE c
L s af i
U n
o,,
e N MTBN hs s
I J
g C w. g,c tae t
D O n
F Gahe A A i
e a
T N D s
l Ei E
O i
K T T P pS
&t t
E E c,
ie h r yt I
C N L L e A,,
H dP t s
T O U P E u
i r
D M T a
N x o O
EfEE0 C
p M
OC E
4 HT G
N IRUD 3
S 3
N O
O I
T H
,Qj u
C l
m E
5g D
,a U
a M
r E
c IE R
S l l R
- aa y
l d uu R
l E
o nnt E
u v,TG W
haau J
O eMM t
W
[E&
P O
M123 O
P T
l D
1 i
N T
A 3
C A
N I
O S
e F
N M
c I
t a
s n
N W
T n
w G
e e
v p I
O R
c Ee D
O i
S L
R T
P U
E R
R O
l iS s
T N
"L E "ygg6 W
IN a
O U
sE_g@
D
)n T
Ygaj U
ia l
H p
E x
E e5ge T
(t s
r I
e e rT N
u if T
l ao O
F e
_C$$
N t c nn c$e$
E eae R
mn c
E pt el J
- nin o uif s qa e E
aEMR g"
R e - -
~
~
E RABC l
i 2
e taD O
l de d u ed c e roli t
o.
FS N
FS l
.I
,,r~"~~,
9 r
O
_.P, f.
e v 7,-:.,
- \\
L% B y
g na a
s uvC-p
'a.;1 nAf0N
/j Ar
{, :,
9 O
lt
+ ~
JOSEPil M. FARLEY NUCLEAR PLANT UNIT'2 NARRATIVE SlftiARY OF OPERATIONS July, 1987 p.
There were no unit shutdowns or significant power reductions during the month of July.
1 The following major safety-related maintenance was performed in the month of July:
1.
Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.
2.
The 2B battery charger was taken out of service and the-spare was placed in use. The 2B battery charger was repaired.
- 3. -Miscellaneous corrective and presentive maintenance was performed on the diesel generators.
l -
l l
1
_ ___a
OPERATING DATA REPORT 4
DOCKET NO.
50-364 DATE 8/4/87
~
C MPLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STATUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
July, 1987
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation
- 5. Design Electrical Rating (Net MWe): 829
' 6. Maximum Dependable Capacity (Gross MWe):
864.9
- 7. Maximum Dependable Capacity (Net MWe):
824.1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
'Ihis Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 5,087 52,632
- 12. Number Of Hours Reactor Was Critical 744 4,729.6 51,085.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 744.0 4,712.7 45,563.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,970,667 11,972,772 115,290,762
- 17. Gross Electrical Energy Generated (MWH) 634,066 3,903,624 37,912,894
- 18. Net Electrical Energy Generated (MWH) 603,190 3,704,984 35,954,096
- 19. Unit Service Factor 100.0 92.6 86.6
- 20. Unit Availability Factor 100.0 92.6 86.6
- 21. Unit Capacity Factor (Using MDC Net) 98.4 88.4 83.9
- 22. Unit Capacity Factor (Using DER Net) 97.8 87.9 82.4
- 23. Unit Forced Outage Rate 0.0 7.4 4.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance outage, 10/2/87, approximately eight weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 l
INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 l
Form 2/30 l
3 5
o9 r
o8 0at e
W s
e
'5 F.
)
s s
a u
5 nt nF M. u D. 2 io4 g
0 c
Di t
JA e
c fL J(
u v
or i
,c Y
e r
o t
L nf(
m s
O.EEyE c
o,,,
U e
I is N MTgN s
s J
t s t A A D 0 any
- a ee T N D Ei Co, F
Gah f
r K T T P i g O
E pS
&t ti e E
c, E
br yt I
CN L L eA, H
ipr n1 s
T h
t O U P E u
N x r D
M T a
o O
EfEE0 C
p M
O C
E 4
HT GN I
RUD 3
S 3
N O
O I
I T
4Eu C
T m
U a
C 5cEj
)
D r
M E
c I
St E
R
- l l R
a a y
l d uu R
l E
o nn t?0 W
h a a u E
u teMM J
O W
E u#
P O
M123 P
T D
H
}
N T
A 3
C A
N I
O S
e a
F N
M e
I s
at N
W T
n ic o G
i e
v p I
O R
c E e S
D O
L R
i 1
P 0
E R
R O
l i
S i
T N
"i:'jeg6 W
IN O
.5g5 D
)
U g
T in U
a 37,j I
lp I
5 n
E (t
s
.8;5 T
r I
e e N
r luT i i a >
O F<e i
t c
.egE N
nn e2. g$
E ea R
mn g
el E
- ninu pt el o uif s qa e E
aEM
.g~'
ER e -
i RAiCD n
l 1
2 e
i a
D d
d le u
ed t e nh i
tS l
N FS t
l
~'
UNIT 2
DATI August 5, 1987 e
J. D. W dard COMPLETED BY TELEPHONE (205) 899-5156 310NTil '
J"IY
/
i DAY AVERACE DAILY F0WER LEVEL DAY' AVERACE DAILY POWER LEVEL l
(5tWe-Net)
(MWe-Net) 809 17 816 783
}g.
813 2
~~
ig-
=. _. _ _..... -. g 9 _.
gjq g
3 812 812 4
- g 5.
811 21 Rio 812-813 6
n 7
813 23 810 812 811 g
24 9,
810 g-814 812 815
~~
10 3
11 811 27 813 808 812 12 g
13 809 807 808 14 800 30 813 809 gg 3;
16 817 CLSTRUCEONS 1
On this form:t. list the svens: daily unit power !cvelin MWe Net for each d:y in the reporting month., Compute to l
, the neare:t whole tre;2 wast.
'i l
I (9/77) l
!J?)'
,,3 I
i
Mdling Adfr:so l
Alabama Power Company 600 f Jorth 18th Street Post Offe.e Box 2641 Birmingh!im, Alabama 35291 T elephone 205 783-6090 H. P. Mcdonald M
Senior Vice President rnninoge Building
/\\llll)llilla Power August 13, 1987 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the July 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very trtily, Y,;.
p/
R. P. Mcdonald RPM /BCE:mab/F-2 Enclosures xt: Director, IE (10 copies)
Director, RII (1 copy) d y-fp 1,
--______.J