                  .              OPERATING DATA REPORT s
OPERATING DATA REPORT s
Docket No. 50-286 Date     10-01-86 Completed By     L. Kelly Telephone 914-739-8200 OPERATING STATUS
Docket No.
: 1. Unit Name:   Indian Point No. 3 Nuclear Power Plant       Notes
50-286 Date 10-01-86 Completed By L. Kelly Telephone 914-739-8200 OPERATING STATUS 1.
: 2. R; porting Period:         September 1986
Unit Name:
: 3. Licensed Thermal Power (MWt):       3025
Indian Point No. 3 Nuclear Power Plant Notes 2.
: 4. N;meplate Rating (Gross MWe):         1013
R; porting Period:
: 5. D; sign Electrical Rating (Net MWe):       965
September 1986 3.
: 6. M ximum Dependable Capacity (Gross MWe): 965
Licensed Thermal Power (MWt):
: 7. M:ximum Dependable Capacity (Net MWe):         930
3025 4.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
N;meplate Rating (Gross MWe):
1013 5.
D; sign Electrical Rating (Net MWe):
965 6.
M ximum Dependable Capacity (Gross MWe):
965 7.
M:ximum Dependable Capacity (Net MWe):
930 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe.
Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe.
: 9. Power Level to Which Restricted, If Any (Net MWe):         930 Net MWe
9.
: 10. Reasons-for Restrictions, If Any:     # 33 Low pressure turbine was modified by replacing two rows of blades with baffle assemblies.
Power Level to Which Restricted, If Any (Net MWe):
This Month     Yr. to Date     Cumulative
930 Net MWe 10.
: 11. Hours In Reporting Period                           720               6,551         88,416
Reasons-for Restrictions, If Any:
: 12. Number of Hours Reactor Was Critical                 600.34             4,388.98       51,656.36
# 33 Low pressure turbine was modified by replacing two rows of blades with baffle assemblies.
: 13. Reactor Reserve Shutdown Hours                       0                   0             0
This Month Yr. to Date Cumulative 11.
: 14. Hours Generator On-Line                             548.05             4,244.64       49,877.61
Hours In Reporting Period 720 6,551 88,416 12.
: 15. Unit Reserve Shutdown Hours                           0                   0             0
Number of Hours Reactor Was Critical 600.34 4,388.98 51,656.36 13.
: 16. Cross Thermal Energy Generated (MWH)             1,469,788.55     11,319,895       132,097,670
Reactor Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (MWH)             471,680         3,683,990     41,248,525
0 0
: 18. Net Electrical Generated (MWH)                     452,338         3,543,871     39,558,510
14.
: 19. Unit Service Factor                                 76.1             64.8             56.4
Hours Generator On-Line 548.05 4,244.64 49,877.61 15.
: 20. Unit Availability Factor                             76.1             64.8             56.4
Unit Reserve Shutdown Hours 0
: 21. Unit Capacity Factor (Using MDC Net)                 67.6             58.2             48.29 *
0 0
: 22. Unit Capacity Factor (Using DER Net)                 67.6             58.2             46.4
16.
: 23. Unit Forced Outage Rate                             23.9             28.9             20.6 24     Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
Cross Thermal Energy Generated (MWH) 1,469,788.55 11,319,895 132,097,670 17.
* Weighted Average
Gross Electrical Energy Generated (MWH) 471,680 3,683,990 41,248,525 18.
: 25. If Shut Down at End of Report Period. Estimated Date of Startup:
Net Electrical Generated (MWH) 452,338 3,543,871 39,558,510 19.
: 26. Units In Test Status (Prior to Commercial Operation):         Forecast         Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Oohhgs PDR                                                           /
Unit Service Factor 76.1 64.8 56.4 20.
                                                                                                      /
Unit Availability Factor 76.1 64.8 56.4 21.
Unit Capacity Factor (Using MDC Net) 67.6 58.2 48.29
* 22.
Unit Capacity Factor (Using DER Net) 67.6 58.2 46.4 23.
Unit Forced Outage Rate 23.9 28.9 20.6 24 Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
* Weighted Average 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Oohhgs PDR
/
/


    ~,
~,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 UNIT   IP-3 DATE   10-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH       September 1986 DAY     AVERAGE DAILY POWER LEVEL         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                             (MWe-Net) 1                 0                     17             931 5                   C                     18             930 3                   0                     19             928 4                 39                     20             929 5               194                     21             931 6                   0                     22             932 7                   0                     23             929 8               365                     24             932 9               341                     25             932 10               110                     26             931 11               414                     27             932 12               667                     28             932 13               892                     29             933 14               932                     30             931 15               931                     31             -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
16               929 INSTRUCTIONS:
50-286 UNIT IP-3 DATE 10-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH September 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 931 5
C 18 930 3
0 19 928 4
39 20 929 5
194 21 931 6
0 22 932 7
0 23 929 8
365 24 932 9
341 25 932 10 110 26 931 11 414 27 932 12 667 28 932 13 892 29 933 14 932 30 931 15 931 31 16 929 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.


IMKKE 6 'Hb'              '''~2""
'''~2""
UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "-         3 DAll         10-1-86 Mll'OR I MONill September, 1986                   COMPLliI LD HY L hl1" I     PHOR '81 'l-7 39-H*>00 "t                                 -
IMKKE 6 'Hb' UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "-
                                      }         h         C
3 DAll 10-1-86 COMPLliI LD HY L hl1" Mll'OR I MONill September, 1986 I
* Li6e:since     (* ,           Q                 ('Jinse & C.H act'llbe si.           iuse e
PHOR '81 'l-7 39-H*>00 "t
: e.      3g f3            m a     2ga jg e-in, i .por: #
}
g id U p'                          Am.sissi ,ii Paesens Recumence 6
h Li6e:since
09           860705   F     88.78         A       1           N/A           N/A           N/A     Turbine Maintenance Outage.
(*,
10           860905   F     57.15           A     3         86-010-00         EA       CKTBRK F     Unit trip due to control circuit ground fault on motor operated disconnect (F1-3) 11           860909   F     26.02           A     3         86-011-00       HH       PUMPXX H   Unit trip due to low level in 34 Steam Generator caused by a trip of 31 Main Boiler Feedpump.
Q
I                     2                                                         3                                 4 i   l'used         Rea>.ni:                                                   Melliod;                             I slohis i.' Insisu is.wis N S.I ed uled         A ligungunen I ailuie llaplain)                           i M.inual                           1.is Picpas an.ni .is Dana h Maintenance or Te>                                       2-Manual Ses am.                     I usig Slicens los 1.s.casee C Reluelung                                                 3 Autom.ilie Sesam.                 hen, Rep.ul ti i R l I ile iNLIRI G-D Regulasiu > Resisittiini                                 4-Oslice Ilimplanil                 untill l Opes.stais li.amingi 1.s ciise l uniunatiosi 12 Adisianastsaitse                                                                       i G Op:s.insiusal La sus ll;apl.ineel                                                             I sintuill- S.une Sousic
('Jinse & C.H act'llbe C
(*8/ D i                 11 Oilies ll!xplain t
* si.
iuse e.
3g a
2ga e-in, g
p' Am.sissi,ii f3 m
jg i.por: #
id U Paesens Recumence e
6 09 860705 F
88.78 A
1 N/A N/A N/A Turbine Maintenance Outage.
10 860905 F
57.15 A
3 86-010-00 EA CKTBRK F Unit trip due to control circuit ground fault on motor operated disconnect (F1-3) 11 860909 F
26.02 A
3 86-011-00 HH PUMPXX H Unit trip due to low level in 34 Steam Generator caused by a trip of 31 Main Boiler Feedpump.
I 2
3 4
i l'used Rea>.ni:
Melliod; I slohis i.' Insisu is.wis N S.I ed uled A ligungunen I ailuie llaplain) i M.inual 1.is Picpas an.ni.is Dana h Maintenance or Te>
2-Manual Ses am.
I usig Slicens los 1.s.casee C Reluelung 3 Autom.ilie Sesam.
hen, Rep.ul ti i R l I ile iNLIRI G-D Regulasiu > Resisittiini 4-Oslice Ilimplanil untill l Opes.stais li.amingi 1.s ciise l uniunatiosi 12 Adisianastsaitse i
G Op:s.insiusal La sus ll;apl.ineel I sintuill-S.une Sousic
(*8/ D i 11 Oilies ll!xplain t


MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR#   DATE       EQUIPMENT                       MALFUNCTION                 CORRECTIVE ACTION 8960 9/03/86 No. 32 Component Cooling     High vibrations.             Replaced inboard and Pump                                                       outboard bearings.
MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR#
8986 9/03/86 Containment Building         Door seal misaligned.         Re-adjusted door seal.
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8960 9/03/86 No. 32 Component Cooling High vibrations.
Replaced inboard and Pump outboard bearings.
8986 9/03/86 Containment Building Door seal misaligned.
Re-adjusted door seal.
Air Lock at 80 ft.
Air Lock at 80 ft.
Elevation 8987 9/03/86 Containment Building Air     Door seal misaligned.         Re-adjusted door seal.
Elevation 8987 9/03/86 Containment Building Air Door seal misaligned.
Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam           Relay coil malfunctioning. Replaced coil.
Re-adjusted door seal.
Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air       Unloader diaphragm has an air Replaced diaphragm.
Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam Relay coil malfunctioning.
Compressor                   leak.
Replaced coil.
5953 9/11/86 Steam Generator 33           Junction box corroded.       Replaced local indicator Auxiliary Feed Flow                                             assembly.
Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air Unloader diaphragm has an air Replaced diaphragm.
Transmitter FT-1202 5954 9/11/86 Steam Generator 32           Junction box corroded.       Replaced local indicator Auxiliary Feed Flow                                       assembly.
Compressor leak.
Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator     Compressor trips on thermal   Replaced compressor.
5953 9/11/86 Steam Generator 33 Junction box corroded.
Starting Air Compressor     overload.
Replaced local indicator Auxiliary Feed Flow assembly.
8695 9/19/86 No. 35 Service Water Pump   Packing leak on pump shaft. Installed new packing.
Transmitter FT-1202 5954 9/11/86 Steam Generator 32 Junction box corroded.
9008 9/24/86 No. 31 Charging Pump         Seal leaks.                   Replaced fluid cylinder stuffing box seals.
Replaced local indicator Auxiliary Feed Flow assembly.
  .8700 9/28/86 Iodine Monitor R-28         No power to pump.             Repaired wiring to pump.
Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator Compressor trips on thermal Replaced compressor.
Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building       Switch to energize panel from Replaced switch.
Starting Air Compressor overload.
Transfer Control Panel       outside of panel inoperable.
8695 9/19/86 No. 35 Service Water Pump Packing leak on pump shaft.
9015 9/30/86 Iodine Monitor R-28         Pump seized.                 Installed new pump and Ch. III - Main Station                                     motor.
Installed new packing.
Vent                                       y,
9008 9/24/86 No. 31 Charging Pump Seal leaks.
Replaced fluid cylinder stuffing box seals.
.8700 9/28/86 Iodine Monitor R-28 No power to pump.
Repaired wiring to pump.
Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building Switch to energize panel from Replaced switch.
Transfer Control Panel outside of panel inoperable.
9015 9/30/86 Iodine Monitor R-28 Pump seized.
Installed new pump and Ch. III - Main Station motor.
Vent y,


                                                                  . MONTHLY I & C CATEGORY I REPORT
. MONTHLY I & C CATEGORY I REPORT September 1986-MONTH WR$
;                                                                                                                        September 1986-MONTH
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5982 9/03/86 No.132 Source Range.
;                WR$     DATE               EQUIPMENT                       MALFUNCTION                     CORRECTIVE ACTION
Neutron counts go full scale.
!                5982     9/03/86         No.132 Source Range.         Neutron counts go full scale. Replaced level amplifier.
Replaced level amplifier.
Nuclear Instrumentation 6015     9/09/86         Rod Control Step             Position demand counter would Adjusted transformer.
Nuclear Instrumentation 6015 9/09/86 Rod Control Step Position demand counter would Adjusted transformer.
Counter                       not reset.
Counter not reset.
:                5857     9/11/86         Isolation Amplifiers         Electronic degradation.         Rebuilt and calibrated.
5857 9/11/86 Isolation Amplifiers Electronic degradation.
]                                         3FM-418D, 3FM-418C 3FM-419G, 3FM-419F l                                         3FM-419K, 3PM-419A i                                         3FM-429K, 3PM-429A
Rebuilt and calibrated.
]                                         3FM-429G, 3FM-429F
]
;                                        3FM-428D, 3FM-428C 5887     9/11/86         Isolation Amplifiers         Electronic degradation.       ' Rebuilt and calibrated.
3FM-418D, 3FM-418C 3FM-419G, 3FM-419F l
;                                        3LM-437E, 3LM-437F 3LM-447E, 3LM-447F i               5888     9/11/86         Isolation Amplifiers         Electronic degradation.         Rebuilt and calibrated.
3FM-419K, 3PM-419A i
!                                        3LM-417E, 3LM-417F I
3FM-429K, 3PM-429A
]
3FM-429G, 3FM-429F 3FM-428D, 3FM-428C 5887 9/11/86 Isolation Amplifiers Electronic degradation.
' Rebuilt and calibrated.
3LM-437E, 3LM-437F 3LM-447E, 3LM-447F i
5888 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3LM-417E, 3LM-417F I
3LM-427E, 3LM-427F j
3LM-427E, 3LM-427F j
i               5889     9/11/86         Isolation Amplifiers         Electronic degradation.         Rebuilt and calibrated.
i 5889 9/11/86 Isolation Amplifiers Electronic degradation.
4                                        3PM-455L, 3LM-459B
Rebuilt and calibrated.
;                                        3PM-457L, 3LM-461B i
3PM-455L, 3LM-459B 4
5890     9/11/86         Isolation Amplifiers         Electronic degradation.         Rebuilt and calibrated.
3PM-457L, 3LM-461B i
3QM-412D, 3QM-412F j                                       3PM-412E                                                                                       ,
5890 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3QM-412D, 3QM-412F j
3PM-412E
{
{
                .5987     9/11/86         Pressurizer Level             Indicator does not function     Recalibrated level indicator.
.5987 9/11/86 Pressurizer Level Indicator does not function Recalibrated level indicator.
Indicator LI-460             properly at low end of scale.
Indicator LI-460 properly at low end of scale.
I l             5884     9/15/86         Isolation Amplifiers         Electronic degradation.         Rebuilt and calibrated..
I l
1                                       3PM-958B, 3PM-949B
5884 9/15/86 Isolation Amplifiers Electronic degradation.
{                                       3FM-416, 3FM-426 j                                       3FM-436, 3FM-446 i
Rebuilt and calibrated..
1 3PM-958B, 3PM-949B
{
3FM-416, 3FM-426 i
j 3FM-436, 3FM-446 i


    . . _ . _ _ . . . . _ _ _ _ . _ . - __ _      __ .    .__ _        _. - _ - ~ . - . . _           . . . - _ _ . _ . _ _ _ ~ . . . . - _      __-  m -      __      - . ,
_. - _ - ~. -.. _
a l                                                                                           MONTHLY I & C CATEGORY I REPORT i
... - _ _. _. _ _ _ ~....
j                                                                                                                                                               - September 1986~
m a
l MONTHLY I & C CATEGORY I REPORT i
j
- September 1986~
MONTH i
MONTH i
1                           WR#           DATE               EQUIPMENT                                 MALFUNCTION                             CORRECTIVE ACTION 4
1 WR#
1 j                           5891           9/15/86     Isolation Amplifiers                     Electronic degradation.                   -Rebuilt and calibrated.
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4
1 3TM-411S, 3TM-411R l                                                       3TM-411T I
1 j
j                             5893           9/15/86     Isolation Amplifiers                     Electronic-degradation.                   . Rebuilt and calibr'ated.
5891 9/15/86 Isolation Amplifiers Electronic degradation.
;                                                        3TM-442L, 3TM-442F
-Rebuilt and calibrated.
;                                                        3TM-442G, 3PM-474A l                             5892           9/15/86     Isolation Amplifiers                     Electronic degradation.                   Rebuilt and calibrated.
1 3TM-411S, 3TM-411R l
3FM-448A, 3PM-949D l                                                       3LM-417A, 3PM-449C 3LM-427A, 3LM-437A 3LM-447A, 3PM-419C 6027           9/18/86     No.'31 Charging Pump                     Pump will not go to minimum               Replaced regulator.
3TM-411T I
j                                                                                                 speed.
j 5893 9/15/86 Isolation Amplifiers Electronic-degradation.
. Rebuilt and calibr'ated.
3TM-442L, 3TM-442F 3TM-442G, 3PM-474A l
5892 9/15/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3FM-448A, 3PM-949D l
3LM-417A, 3PM-449C 3LM-427A, 3LM-437A 3LM-447A, 3PM-419C 6027 9/18/86 No.'31 Charging Pump Pump will not go to minimum Replaced regulator.
j speed.
I
I
}                             6059           9/23/86     Pressurizer Surge Line                   Indicator spiking.                         Resistance to current converter
}
.                                                      Temperature Indicator                                                               calibrated.
6059 9/23/86 Pressurizer Surge Line Indicator spiking.
Resistance to current converter Temperature Indicator calibrated.
TI-450.
TI-450.
2 5963           9/26/86     Containment Prescure                     Indicators pegged low.                     Recalibrated indicators.
2 5963 9/26/86 Containment Prescure Indicators pegged low.
Indicators PI-948A and PI-949A
Recalibrated indicators.
!                            6057           9/26/86     Administrative Building                   Spurious spiking.                         Replaced detector.
Indicators PI-948A and PI-949A 6057 9/26/86 Administrative Building Spurious spiking.
Replaced detector.
Gas Monitor R-46 4
Gas Monitor R-46 4
6084           9/30/86     No. 34 Accumulator                       Failed low.                               Replaced transmitter amplifier
6084 9/30/86 No. 34 Accumulator Failed low.
;                                                        Pressure Indicator                                                                   assembly.
Replaced transmitter amplifier Pressure Indicator assembly.
l                                                       PI-936D i
l PI-936D i
l i
l i
i i
i i
Line 138: Line 227:
h.
h.
a
a
                                  ~
~


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours, producing a gross generation of 471,680 Mwe.
OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours, producing a gross generation of 471,680 Mwe.
On September 05 at 1558 hours, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically.
On September 05 at 1558 hours, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically.
          . An investigation determined that the grounds resulted from moisture that had entered underground conduit. To prevent recurrence, new conduit and wiring wer,e                                                           '
. An investigation determined that the grounds resulted from moisture that had entered underground conduit. To prevent recurrence, new conduit and wiring wer,e installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours.
installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours.
On September 09, 1986 at 1000 hours, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to
On September 09, 1986 at 1000 hours, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to
          ' trip. The oil system was cleaned and a mispositioned Boiler Feed Pump seal was monitored to verify that it would perform as designed by automatically self-seating during pump operation.
' trip. The oil system was cleaned and a mispositioned Boiler Feed Pump seal was monitored to verify that it would perform as designed by automatically self-seating during pump operation.
The unit was returned to service on September 10th at 1201 hours and continued to produce electricity for the remainder of the reporting period.
The unit was returned to service on September 10th at 1201 hours and continued to produce electricity for the remainder of the reporting period.
m m_______.______________._        . _ . _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ . _ _ _ _ _ _ _                  _ _ _ _ __ _ _ _ _
m m_______.______________._


indien Point 3 Nucleet Power Plant RO. Box 215
indien Point 3 Nucleet Power Plant RO. Box 215
    .              , New Wrk 10511 914 739.8200
, New Wrk 10511 914 739.8200
    #> NewWrkPbwer 1# Authority October 1, 1986 IP3-WAJ-054Z IP3-LMK-233H Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.         20555 Attention: Document Control Desk
#> NewWrkPbwer 1# Authority October 1, 1986 IP3-WAJ-054Z IP3-LMK-233H Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk


==Dear Sir:==
==Dear Sir:==
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986.
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986.
Very truly yours, AWW c''
Very truly yours, AWW c''
liam . J siger Residen M ager LK/a . 3 rd3 c.nc osures (12 copies) cc:     Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania     19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WP0 S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339
liam. J siger Residen M ager LK/a. 3 rd3 c.nc osures (12 copies) cc:
[     M Ut}}
Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WP0 S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339
[
M Ut}}

Latest revision as of 20:57, 7 December 2024

Monthly Operating Rept for Sept 1986
ML20203P108
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/30/1986
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP3-LMR-233H, IP3-WAJ-054Z, IP3-WAJ-54Z, NUDOCS 8610200272
Download: ML20203P108 (8)


Text

,

OPERATING DATA REPORT s

Docket No.

50-286 Date 10-01-86 Completed By L. Kelly Telephone 914-739-8200 OPERATING STATUS 1.

Unit Name:

Indian Point No. 3 Nuclear Power Plant Notes 2.

R; porting Period:

September 1986 3.

Licensed Thermal Power (MWt):

3025 4.

N;meplate Rating (Gross MWe):

1013 5.

D; sign Electrical Rating (Net MWe):

965 6.

M ximum Dependable Capacity (Gross MWe):

965 7.

M:ximum Dependable Capacity (Net MWe):

930 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.

Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe.

9.

Power Level to Which Restricted, If Any (Net MWe):

930 Net MWe 10.

Reasons-for Restrictions, If Any:

  1. 33 Low pressure turbine was modified by replacing two rows of blades with baffle assemblies.

This Month Yr. to Date Cumulative 11.

Hours In Reporting Period 720 6,551 88,416 12.

Number of Hours Reactor Was Critical 600.34 4,388.98 51,656.36 13.

Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 548.05 4,244.64 49,877.61 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Cross Thermal Energy Generated (MWH) 1,469,788.55 11,319,895 132,097,670 17.

Gross Electrical Energy Generated (MWH) 471,680 3,683,990 41,248,525 18.

Net Electrical Generated (MWH) 452,338 3,543,871 39,558,510 19.

Unit Service Factor 76.1 64.8 56.4 20.

Unit Availability Factor 76.1 64.8 56.4 21.

Unit Capacity Factor (Using MDC Net) 67.6 58.2 48.29

  • 22.

Unit Capacity Factor (Using DER Net) 67.6 58.2 46.4 23.

Unit Forced Outage Rate 23.9 28.9 20.6 24 Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):

  • Weighted Average 25.

If Shut Down at End of Report Period. Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Oohhgs PDR

/

/

~,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 UNIT IP-3 DATE 10-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH September 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 931 5

C 18 930 3

0 19 928 4

39 20 929 5

194 21 931 6

0 22 932 7

0 23 929 8

365 24 932 9

341 25 932 10 110 26 931 11 414 27 932 12 667 28 932 13 892 29 933 14 932 30 931 15 931 31 16 929 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

~2""

IMKKE 6 'Hb' UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "-

3 DAll 10-1-86 COMPLliI LD HY L hl1" Mll'OR I MONill September, 1986 I

PHOR '81 'l-7 39-H*>00 "t

}

h Li6e:since

(*,

Q

('Jinse & C.H act'llbe C

  • si.

iuse e.

3g a

2ga e-in, g

p' Am.sissi,ii f3 m

jg i.por: #

id U Paesens Recumence e

6 09 860705 F

88.78 A

1 N/A N/A N/A Turbine Maintenance Outage.

10 860905 F

57.15 A

3 86-010-00 EA CKTBRK F Unit trip due to control circuit ground fault on motor operated disconnect (F1-3) 11 860909 F

26.02 A

3 86-011-00 HH PUMPXX H Unit trip due to low level in 34 Steam Generator caused by a trip of 31 Main Boiler Feedpump.

I 2

3 4

i l'used Rea>.ni:

Melliod; I slohis i.' Insisu is.wis N S.I ed uled A ligungunen I ailuie llaplain) i M.inual 1.is Picpas an.ni.is Dana h Maintenance or Te>

2-Manual Ses am.

I usig Slicens los 1.s.casee C Reluelung 3 Autom.ilie Sesam.

hen, Rep.ul ti i R l I ile iNLIRI G-D Regulasiu > Resisittiini 4-Oslice Ilimplanil untill l Opes.stais li.amingi 1.s ciise l uniunatiosi 12 Adisianastsaitse i

G Op:s.insiusal La sus ll;apl.ineel I sintuill-S.une Sousic

(*8/ D i 11 Oilies ll!xplain t

MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8960 9/03/86 No. 32 Component Cooling High vibrations.

Replaced inboard and Pump outboard bearings.

8986 9/03/86 Containment Building Door seal misaligned.

Re-adjusted door seal.

Air Lock at 80 ft.

Elevation 8987 9/03/86 Containment Building Air Door seal misaligned.

Re-adjusted door seal.

Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam Relay coil malfunctioning.

Replaced coil.

Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air Unloader diaphragm has an air Replaced diaphragm.

Compressor leak.

5953 9/11/86 Steam Generator 33 Junction box corroded.

Replaced local indicator Auxiliary Feed Flow assembly.

Transmitter FT-1202 5954 9/11/86 Steam Generator 32 Junction box corroded.

Replaced local indicator Auxiliary Feed Flow assembly.

Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator Compressor trips on thermal Replaced compressor.

Starting Air Compressor overload.

8695 9/19/86 No. 35 Service Water Pump Packing leak on pump shaft.

Installed new packing.

9008 9/24/86 No. 31 Charging Pump Seal leaks.

Replaced fluid cylinder stuffing box seals.

.8700 9/28/86 Iodine Monitor R-28 No power to pump.

Repaired wiring to pump.

Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building Switch to energize panel from Replaced switch.

Transfer Control Panel outside of panel inoperable.

9015 9/30/86 Iodine Monitor R-28 Pump seized.

Installed new pump and Ch. III - Main Station motor.

Vent y,

. MONTHLY I & C CATEGORY I REPORT September 1986-MONTH WR$

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5982 9/03/86 No.132 Source Range.

Neutron counts go full scale.

Replaced level amplifier.

Nuclear Instrumentation 6015 9/09/86 Rod Control Step Position demand counter would Adjusted transformer.

Counter not reset.

5857 9/11/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated.

]

3FM-418D, 3FM-418C 3FM-419G, 3FM-419F l

3FM-419K, 3PM-419A i

3FM-429K, 3PM-429A

]

3FM-429G, 3FM-429F 3FM-428D, 3FM-428C 5887 9/11/86 Isolation Amplifiers Electronic degradation.

' Rebuilt and calibrated.

3LM-437E, 3LM-437F 3LM-447E, 3LM-447F i

5888 9/11/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated.

3LM-417E, 3LM-417F I

3LM-427E, 3LM-427F j

i 5889 9/11/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated.

3PM-455L, 3LM-459B 4

3PM-457L, 3LM-461B i

5890 9/11/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated.

3QM-412D, 3QM-412F j

3PM-412E

{

.5987 9/11/86 Pressurizer Level Indicator does not function Recalibrated level indicator.

Indicator LI-460 properly at low end of scale.

I l

5884 9/15/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated..

1 3PM-958B, 3PM-949B

{

3FM-416, 3FM-426 i

j 3FM-436, 3FM-446 i

_. - _ - ~. -.. _

... - _ _. _. _ _ _ ~....

m a

l MONTHLY I & C CATEGORY I REPORT i

j

- September 1986~

MONTH i

1 WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4

1 j

5891 9/15/86 Isolation Amplifiers Electronic degradation.

-Rebuilt and calibrated.

1 3TM-411S, 3TM-411R l

3TM-411T I

j 5893 9/15/86 Isolation Amplifiers Electronic-degradation.

. Rebuilt and calibr'ated.

3TM-442L, 3TM-442F 3TM-442G, 3PM-474A l

5892 9/15/86 Isolation Amplifiers Electronic degradation.

Rebuilt and calibrated.

3FM-448A, 3PM-949D l

3LM-417A, 3PM-449C 3LM-427A, 3LM-437A 3LM-447A, 3PM-419C 6027 9/18/86 No.'31 Charging Pump Pump will not go to minimum Replaced regulator.

j speed.

I

}

6059 9/23/86 Pressurizer Surge Line Indicator spiking.

Resistance to current converter Temperature Indicator calibrated.

TI-450.

2 5963 9/26/86 Containment Prescure Indicators pegged low.

Recalibrated indicators.

Indicators PI-948A and PI-949A 6057 9/26/86 Administrative Building Spurious spiking.

Replaced detector.

Gas Monitor R-46 4

6084 9/30/86 No. 34 Accumulator Failed low.

Replaced transmitter amplifier Pressure Indicator assembly.

l PI-936D i

l i

i i

e s

h.

a

~

SUMMARY

OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br /> following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, producing a gross generation of 471,680 Mwe.

On September 05 at 1558 hours0.018 days <br />0.433 hours <br />0.00258 weeks <br />5.92819e-4 months <br />, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically.

. An investigation determined that the grounds resulted from moisture that had entered underground conduit. To prevent recurrence, new conduit and wiring wer,e installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />.

On September 09, 1986 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to

' trip. The oil system was cleaned and a mispositioned Boiler Feed Pump seal was monitored to verify that it would perform as designed by automatically self-seating during pump operation.

The unit was returned to service on September 10th at 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br /> and continued to produce electricity for the remainder of the reporting period.

m m_______.______________._

indien Point 3 Nucleet Power Plant RO. Box 215

, New Wrk 10511 914 739.8200

  1. > NewWrkPbwer 1# Authority October 1, 1986 IP3-WAJ-054Z IP3-LMK-233H Docket No.

50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986.

Very truly yours, AWW c

liam. J siger Residen M ager LK/a. 3 rd3 c.nc osures (12 copies) cc:

Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WP0 S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339

[

M Ut