OPERATING DATA REPORT s | |||
Docket No. 50-286 Date | Docket No. | ||
50-286 Date 10-01-86 Completed By L. Kelly Telephone 914-739-8200 OPERATING STATUS 1. | |||
Unit Name: | |||
Indian Point No. 3 Nuclear Power Plant Notes 2. | |||
R; porting Period: | |||
September 1986 3. | |||
Licensed Thermal Power (MWt): | |||
3025 4. | |||
N;meplate Rating (Gross MWe): | |||
1013 5. | |||
D; sign Electrical Rating (Net MWe): | |||
965 6. | |||
M ximum Dependable Capacity (Gross MWe): | |||
965 7. | |||
M:ximum Dependable Capacity (Net MWe): | |||
930 8. | |||
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report. | |||
Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe. | Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe. | ||
9. | |||
Power Level to Which Restricted, If Any (Net MWe): | |||
This Month | 930 Net MWe 10. | ||
Reasons-for Restrictions, If Any: | |||
# 33 Low pressure turbine was modified by replacing two rows of blades with baffle assemblies. | |||
This Month Yr. to Date Cumulative 11. | |||
Hours In Reporting Period 720 6,551 88,416 12. | |||
Number of Hours Reactor Was Critical 600.34 4,388.98 51,656.36 13. | |||
Reactor Reserve Shutdown Hours 0 | |||
0 0 | |||
14. | |||
Hours Generator On-Line 548.05 4,244.64 49,877.61 15. | |||
Unit Reserve Shutdown Hours 0 | |||
0 0 | |||
16. | |||
Cross Thermal Energy Generated (MWH) 1,469,788.55 11,319,895 132,097,670 17. | |||
* Weighted Average | Gross Electrical Energy Generated (MWH) 471,680 3,683,990 41,248,525 18. | ||
Net Electrical Generated (MWH) 452,338 3,543,871 39,558,510 19. | |||
Unit Service Factor 76.1 64.8 56.4 20. | |||
Unit Availability Factor 76.1 64.8 56.4 21. | |||
Unit Capacity Factor (Using MDC Net) 67.6 58.2 48.29 | |||
* 22. | |||
Unit Capacity Factor (Using DER Net) 67.6 58.2 46.4 23. | |||
Unit Forced Outage Rate 23.9 28.9 20.6 24 Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each): | |||
* Weighted Average 25. | |||
If Shut Down at End of Report Period. Estimated Date of Startup: | |||
26. | |||
Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Oohhgs PDR | |||
/ | |||
/ | |||
~, | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 UNIT | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
16 | 50-286 UNIT IP-3 DATE 10-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH September 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
(MWe-Net) 1 0 | |||
17 931 5 | |||
C 18 930 3 | |||
0 19 928 4 | |||
39 20 929 5 | |||
194 21 931 6 | |||
0 22 932 7 | |||
0 23 929 8 | |||
365 24 932 9 | |||
341 25 932 10 110 26 931 11 414 27 932 12 667 28 932 13 892 29 933 14 932 30 931 15 931 31 16 929 INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
'''~2"" | |||
UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "- | IMKKE 6 'Hb' UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "- | ||
3 DAll 10-1-86 COMPLliI LD HY L hl1" Mll'OR I MONill September, 1986 I | |||
PHOR '81 'l-7 39-H*>00 "t | |||
} | |||
h Li6e:since | |||
09 | (*, | ||
10 | Q | ||
I | ('Jinse & C.H act'llbe C | ||
(*8/ D i | * si. | ||
iuse e. | |||
3g a | |||
2ga e-in, g | |||
p' Am.sissi,ii f3 m | |||
jg i.por: # | |||
id U Paesens Recumence e | |||
6 09 860705 F | |||
88.78 A | |||
1 N/A N/A N/A Turbine Maintenance Outage. | |||
10 860905 F | |||
57.15 A | |||
3 86-010-00 EA CKTBRK F Unit trip due to control circuit ground fault on motor operated disconnect (F1-3) 11 860909 F | |||
26.02 A | |||
3 86-011-00 HH PUMPXX H Unit trip due to low level in 34 Steam Generator caused by a trip of 31 Main Boiler Feedpump. | |||
I 2 | |||
3 4 | |||
i l'used Rea>.ni: | |||
Melliod; I slohis i.' Insisu is.wis N S.I ed uled A ligungunen I ailuie llaplain) i M.inual 1.is Picpas an.ni.is Dana h Maintenance or Te> | |||
2-Manual Ses am. | |||
I usig Slicens los 1.s.casee C Reluelung 3 Autom.ilie Sesam. | |||
hen, Rep.ul ti i R l I ile iNLIRI G-D Regulasiu > Resisittiini 4-Oslice Ilimplanil untill l Opes.stais li.amingi 1.s ciise l uniunatiosi 12 Adisianastsaitse i | |||
G Op:s.insiusal La sus ll;apl.ineel I sintuill-S.une Sousic | |||
(*8/ D i 11 Oilies ll!xplain t | |||
MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR# | MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR# | ||
8986 9/03/86 Containment Building | DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8960 9/03/86 No. 32 Component Cooling High vibrations. | ||
Replaced inboard and Pump outboard bearings. | |||
8986 9/03/86 Containment Building Door seal misaligned. | |||
Re-adjusted door seal. | |||
Air Lock at 80 ft. | Air Lock at 80 ft. | ||
Elevation 8987 9/03/86 Containment Building Air | Elevation 8987 9/03/86 Containment Building Air Door seal misaligned. | ||
Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam | Re-adjusted door seal. | ||
Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air | Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam Relay coil malfunctioning. | ||
Compressor | Replaced coil. | ||
5953 9/11/86 Steam Generator 33 | Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air Unloader diaphragm has an air Replaced diaphragm. | ||
Transmitter FT-1202 5954 9/11/86 Steam Generator 32 | Compressor leak. | ||
Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator | 5953 9/11/86 Steam Generator 33 Junction box corroded. | ||
Starting Air Compressor | Replaced local indicator Auxiliary Feed Flow assembly. | ||
8695 9/19/86 No. 35 Service Water Pump | Transmitter FT-1202 5954 9/11/86 Steam Generator 32 Junction box corroded. | ||
9008 9/24/86 No. 31 Charging Pump | Replaced local indicator Auxiliary Feed Flow assembly. | ||
Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator Compressor trips on thermal Replaced compressor. | |||
Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building | Starting Air Compressor overload. | ||
Transfer Control Panel | 8695 9/19/86 No. 35 Service Water Pump Packing leak on pump shaft. | ||
9015 9/30/86 Iodine Monitor R-28 | Installed new packing. | ||
Vent | 9008 9/24/86 No. 31 Charging Pump Seal leaks. | ||
Replaced fluid cylinder stuffing box seals. | |||
.8700 9/28/86 Iodine Monitor R-28 No power to pump. | |||
Repaired wiring to pump. | |||
Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building Switch to energize panel from Replaced switch. | |||
Transfer Control Panel outside of panel inoperable. | |||
9015 9/30/86 Iodine Monitor R-28 Pump seized. | |||
Installed new pump and Ch. III - Main Station motor. | |||
Vent y, | |||
. MONTHLY I & C CATEGORY I REPORT September 1986-MONTH WR$ | |||
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5982 9/03/86 No.132 Source Range. | |||
Neutron counts go full scale. | |||
Replaced level amplifier. | |||
Nuclear Instrumentation 6015 | Nuclear Instrumentation 6015 9/09/86 Rod Control Step Position demand counter would Adjusted transformer. | ||
Counter | Counter not reset. | ||
5857 9/11/86 Isolation Amplifiers Electronic degradation. | |||
] | Rebuilt and calibrated. | ||
] | ] | ||
3FM-418D, 3FM-418C 3FM-419G, 3FM-419F l | |||
3FM-419K, 3PM-419A i | |||
3FM-429K, 3PM-429A | |||
] | |||
3FM-429G, 3FM-429F 3FM-428D, 3FM-428C 5887 9/11/86 Isolation Amplifiers Electronic degradation. | |||
' Rebuilt and calibrated. | |||
3LM-437E, 3LM-437F 3LM-447E, 3LM-447F i | |||
5888 9/11/86 Isolation Amplifiers Electronic degradation. | |||
Rebuilt and calibrated. | |||
3LM-417E, 3LM-417F I | |||
3LM-427E, 3LM-427F j | 3LM-427E, 3LM-427F j | ||
i | i 5889 9/11/86 Isolation Amplifiers Electronic degradation. | ||
Rebuilt and calibrated. | |||
3PM-455L, 3LM-459B 4 | |||
5890 | 3PM-457L, 3LM-461B i | ||
3QM-412D, 3QM-412F j | 5890 9/11/86 Isolation Amplifiers Electronic degradation. | ||
Rebuilt and calibrated. | |||
3QM-412D, 3QM-412F j | |||
3PM-412E | |||
{ | { | ||
.5987 9/11/86 Pressurizer Level Indicator does not function Recalibrated level indicator. | |||
Indicator LI-460 | Indicator LI-460 properly at low end of scale. | ||
I l | I l | ||
1 | 5884 9/15/86 Isolation Amplifiers Electronic degradation. | ||
{ | Rebuilt and calibrated.. | ||
1 3PM-958B, 3PM-949B | |||
{ | |||
3FM-416, 3FM-426 i | |||
j 3FM-436, 3FM-446 i | |||
_. - _ - ~. -.. _ | |||
... - _ _. _. _ _ _ ~.... | |||
j | m a | ||
l MONTHLY I & C CATEGORY I REPORT i | |||
j | |||
- September 1986~ | |||
MONTH i | MONTH i | ||
1 | 1 WR# | ||
1 j | DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4 | ||
1 3TM-411S, 3TM-411R l | 1 j | ||
j | 5891 9/15/86 Isolation Amplifiers Electronic degradation. | ||
-Rebuilt and calibrated. | |||
1 3TM-411S, 3TM-411R l | |||
3FM-448A, 3PM-949D l | 3TM-411T I | ||
j | j 5893 9/15/86 Isolation Amplifiers Electronic-degradation. | ||
. Rebuilt and calibr'ated. | |||
3TM-442L, 3TM-442F 3TM-442G, 3PM-474A l | |||
5892 9/15/86 Isolation Amplifiers Electronic degradation. | |||
Rebuilt and calibrated. | |||
3FM-448A, 3PM-949D l | |||
3LM-417A, 3PM-449C 3LM-427A, 3LM-437A 3LM-447A, 3PM-419C 6027 9/18/86 No.'31 Charging Pump Pump will not go to minimum Replaced regulator. | |||
j speed. | |||
I | I | ||
} | } | ||
6059 9/23/86 Pressurizer Surge Line Indicator spiking. | |||
Resistance to current converter Temperature Indicator calibrated. | |||
TI-450. | TI-450. | ||
2 5963 | 2 5963 9/26/86 Containment Prescure Indicators pegged low. | ||
Indicators PI-948A and PI-949A | Recalibrated indicators. | ||
Indicators PI-948A and PI-949A 6057 9/26/86 Administrative Building Spurious spiking. | |||
Replaced detector. | |||
Gas Monitor R-46 4 | Gas Monitor R-46 4 | ||
6084 | 6084 9/30/86 No. 34 Accumulator Failed low. | ||
Replaced transmitter amplifier Pressure Indicator assembly. | |||
l | l PI-936D i | ||
l i | l i | ||
i i | i i | ||
| Line 138: | Line 227: | ||
h. | h. | ||
a | a | ||
~ | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours, producing a gross generation of 471,680 Mwe. | OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours, producing a gross generation of 471,680 Mwe. | ||
On September 05 at 1558 hours, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically. | On September 05 at 1558 hours, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically. | ||
. An investigation determined that the grounds resulted from moisture that had entered underground conduit. To prevent recurrence, new conduit and wiring wer,e installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours. | |||
installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours. | |||
On September 09, 1986 at 1000 hours, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to | On September 09, 1986 at 1000 hours, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to | ||
' trip. The oil system was cleaned and a mispositioned Boiler Feed Pump seal was monitored to verify that it would perform as designed by automatically self-seating during pump operation. | |||
The unit was returned to service on September 10th at 1201 hours and continued to produce electricity for the remainder of the reporting period. | The unit was returned to service on September 10th at 1201 hours and continued to produce electricity for the remainder of the reporting period. | ||
m m_______.______________. | m m_______.______________._ | ||
indien Point 3 Nucleet Power Plant RO. Box 215 | indien Point 3 Nucleet Power Plant RO. Box 215 | ||
, New Wrk 10511 914 739.8200 | |||
#> NewWrkPbwer 1# Authority October 1, 1986 IP3-WAJ-054Z IP3-LMK-233H Docket No. | |||
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 Attention: Document Control Desk | |||
==Dear Sir:== | ==Dear Sir:== | ||
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986. | Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986. | ||
Very truly yours, AWW c'' | Very truly yours, AWW c'' | ||
liam . J siger Residen M ager LK/a . 3 rd3 c.nc osures (12 copies) cc: | liam. J siger Residen M ager LK/a. 3 rd3 c.nc osures (12 copies) cc: | ||
[ | Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WP0 S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 | ||
[ | |||
M Ut}} | |||
Latest revision as of 20:57, 7 December 2024
| ML20203P108 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/30/1986 |
| From: | Josiger W, Kelly L POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| IP3-LMR-233H, IP3-WAJ-054Z, IP3-WAJ-54Z, NUDOCS 8610200272 | |
| Download: ML20203P108 (8) | |
Text
,
OPERATING DATA REPORT s
Docket No.
50-286 Date 10-01-86 Completed By L. Kelly Telephone 914-739-8200 OPERATING STATUS 1.
Unit Name:
Indian Point No. 3 Nuclear Power Plant Notes 2.
R; porting Period:
September 1986 3.
Licensed Thermal Power (MWt):
3025 4.
N;meplate Rating (Gross MWe):
1013 5.
D; sign Electrical Rating (Net MWe):
965 6.
M ximum Dependable Capacity (Gross MWe):
965 7.
M:ximum Dependable Capacity (Net MWe):
930 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
Give Reasons: #33 Low pressure turbine was modified by replacing two rows of blades with b,ffla assemblies. This modificaiton reduced the MDC (Gross) from 1000 Mwe to 965 Mwe and r~duced the MDC (net) from 965 Mwe to 930 Mwe.
9.
Power Level to Which Restricted, If Any (Net MWe):
930 Net MWe 10.
Reasons-for Restrictions, If Any:
- 33 Low pressure turbine was modified by replacing two rows of blades with baffle assemblies.
This Month Yr. to Date Cumulative 11.
Hours In Reporting Period 720 6,551 88,416 12.
Number of Hours Reactor Was Critical 600.34 4,388.98 51,656.36 13.
Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 548.05 4,244.64 49,877.61 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Cross Thermal Energy Generated (MWH) 1,469,788.55 11,319,895 132,097,670 17.
Gross Electrical Energy Generated (MWH) 471,680 3,683,990 41,248,525 18.
Net Electrical Generated (MWH) 452,338 3,543,871 39,558,510 19.
Unit Service Factor 76.1 64.8 56.4 20.
Unit Availability Factor 76.1 64.8 56.4 21.
Unit Capacity Factor (Using MDC Net) 67.6 58.2 48.29
- 22.
Unit Capacity Factor (Using DER Net) 67.6 58.2 46.4 23.
Unit Forced Outage Rate 23.9 28.9 20.6 24 Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
- Weighted Average 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Oohhgs PDR
/
/
~,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT IP-3 DATE 10-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH September 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 931 5
C 18 930 3
0 19 928 4
39 20 929 5
194 21 931 6
0 22 932 7
0 23 929 8
365 24 932 9
341 25 932 10 110 26 931 11 414 27 932 12 667 28 932 13 892 29 933 14 932 30 931 15 931 31 16 929 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
~2""
IMKKE 6 'Hb' UNil SilulDOWNS, t.ND POWER RLDUCilONS UNil NAME i'"li " i " n ' '" "-
3 DAll 10-1-86 COMPLliI LD HY L hl1" Mll'OR I MONill September, 1986 I
PHOR '81 'l-7 39-H*>00 "t
}
h Li6e:since
(*,
Q
('Jinse & C.H act'llbe C
- si.
iuse e.
3g a
2ga e-in, g
p' Am.sissi,ii f3 m
jg i.por: #
id U Paesens Recumence e
6 09 860705 F
88.78 A
1 N/A N/A N/A Turbine Maintenance Outage.
10 860905 F
57.15 A
3 86-010-00 EA CKTBRK F Unit trip due to control circuit ground fault on motor operated disconnect (F1-3) 11 860909 F
26.02 A
3 86-011-00 HH PUMPXX H Unit trip due to low level in 34 Steam Generator caused by a trip of 31 Main Boiler Feedpump.
I 2
3 4
i l'used Rea>.ni:
Melliod; I slohis i.' Insisu is.wis N S.I ed uled A ligungunen I ailuie llaplain) i M.inual 1.is Picpas an.ni.is Dana h Maintenance or Te>
2-Manual Ses am.
I usig Slicens los 1.s.casee C Reluelung 3 Autom.ilie Sesam.
hen, Rep.ul ti i R l I ile iNLIRI G-D Regulasiu > Resisittiini 4-Oslice Ilimplanil untill l Opes.stais li.amingi 1.s ciise l uniunatiosi 12 Adisianastsaitse i
G Op:s.insiusal La sus ll;apl.ineel I sintuill-S.une Sousic
(*8/ D i 11 Oilies ll!xplain t
MONTHLY MAINTENANCE CATEGORY I REPORT September 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8960 9/03/86 No. 32 Component Cooling High vibrations.
Replaced inboard and Pump outboard bearings.
8986 9/03/86 Containment Building Door seal misaligned.
Re-adjusted door seal.
Air Lock at 80 ft.
Elevation 8987 9/03/86 Containment Building Air Door seal misaligned.
Re-adjusted door seal.
Lock at 95 ft. Elevation 5929 9/05/86 No. 31 Main Steam Relay coil malfunctioning.
Replaced coil.
Isolation Valve Lock-Out-Relay 8733 9/10/86 No. 31 Instrument Air Unloader diaphragm has an air Replaced diaphragm.
Compressor leak.
5953 9/11/86 Steam Generator 33 Junction box corroded.
Replaced local indicator Auxiliary Feed Flow assembly.
Transmitter FT-1202 5954 9/11/86 Steam Generator 32 Junction box corroded.
Replaced local indicator Auxiliary Feed Flow assembly.
Transmitter FT-1201 9029 9/17/86 No. 31 Diesel Generator Compressor trips on thermal Replaced compressor.
Starting Air Compressor overload.
8695 9/19/86 No. 35 Service Water Pump Packing leak on pump shaft.
Installed new packing.
9008 9/24/86 No. 31 Charging Pump Seal leaks.
Replaced fluid cylinder stuffing box seals.
.8700 9/28/86 Iodine Monitor R-28 No power to pump.
Repaired wiring to pump.
Ch. I - Main Station Vent 7505 9/30/86 Fuel Storage Building Switch to energize panel from Replaced switch.
Transfer Control Panel outside of panel inoperable.
9015 9/30/86 Iodine Monitor R-28 Pump seized.
Installed new pump and Ch. III - Main Station motor.
Vent y,
. MONTHLY I & C CATEGORY I REPORT September 1986-MONTH WR$
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5982 9/03/86 No.132 Source Range.
Neutron counts go full scale.
Replaced level amplifier.
Nuclear Instrumentation 6015 9/09/86 Rod Control Step Position demand counter would Adjusted transformer.
Counter not reset.
5857 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
]
3FM-418D, 3FM-418C 3FM-419G, 3FM-419F l
]
3FM-429G, 3FM-429F 3FM-428D, 3FM-428C 5887 9/11/86 Isolation Amplifiers Electronic degradation.
' Rebuilt and calibrated.
3LM-437E, 3LM-437F 3LM-447E, 3LM-447F i
5888 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
i 5889 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
5890 9/11/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
{
.5987 9/11/86 Pressurizer Level Indicator does not function Recalibrated level indicator.
Indicator LI-460 properly at low end of scale.
I l
5884 9/15/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated..
{
_. - _ - ~. -.. _
... - _ _. _. _ _ _ ~....
m a
l MONTHLY I & C CATEGORY I REPORT i
j
- September 1986~
MONTH i
1 WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4
1 j
5891 9/15/86 Isolation Amplifiers Electronic degradation.
-Rebuilt and calibrated.
3TM-411T I
j 5893 9/15/86 Isolation Amplifiers Electronic-degradation.
. Rebuilt and calibr'ated.
3TM-442L, 3TM-442F 3TM-442G, 3PM-474A l
5892 9/15/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3LM-417A, 3PM-449C 3LM-427A, 3LM-437A 3LM-447A, 3PM-419C 6027 9/18/86 No.'31 Charging Pump Pump will not go to minimum Replaced regulator.
j speed.
I
}
6059 9/23/86 Pressurizer Surge Line Indicator spiking.
Resistance to current converter Temperature Indicator calibrated.
TI-450.
2 5963 9/26/86 Containment Prescure Indicators pegged low.
Recalibrated indicators.
Indicators PI-948A and PI-949A 6057 9/26/86 Administrative Building Spurious spiking.
Replaced detector.
Gas Monitor R-46 4
6084 9/30/86 No. 34 Accumulator Failed low.
Replaced transmitter amplifier Pressure Indicator assembly.
l PI-936D i
l i
i i
e s
h.
a
~
SUMMARY
OF OPERATING EXPERIENCE SEPTEMBER 1986 Indian Point Unit #3 returned to service on September 10, 1986 at 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br /> following a 61 day turbine maintenance outage. For the remainder of the reporting period Indian Point Unit # 3 was synchronized to the bus for a total of 548.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, producing a gross generation of 471,680 Mwe.
On September 05 at 1558 hours0.018 days <br />0.433 hours <br />0.00258 weeks <br />5.92819e-4 months <br />, a control circuit ground fault on a motor operated disconnect switch of a generator transmission line in the Buchanan switchyard opened while the unit was operating at 56 percent power. A main turbine generator trip and a subsequent reactor trip occurred automatically.
. An investigation determined that the grounds resulted from moisture that had entered underground conduit. To prevent recurrence, new conduit and wiring wer,e installed for the control circuitry and maintenance was performed on the junction boxes. The unit returned to service on. September 8, 1986 at 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />.
On September 09, 1986 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, an automatic unit trip was initiated by low steam generator water level which was caused by the tripping of f 31 Main Boiler Feed Pump. Water entering the Main Boiler Feed Pump control oil system caused imbalances in the hydraulic' controls and caused #31 Main Boiler Feed Pump to
' trip. The oil system was cleaned and a mispositioned Boiler Feed Pump seal was monitored to verify that it would perform as designed by automatically self-seating during pump operation.
The unit was returned to service on September 10th at 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br /> and continued to produce electricity for the remainder of the reporting period.
m m_______.______________._
indien Point 3 Nucleet Power Plant RO. Box 215
, New Wrk 10511 914 739.8200
- > NewWrkPbwer 1# Authority October 1, 1986 IP3-WAJ-054Z IP3-LMK-233H Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1986.
Very truly yours, AWW c
liam. J siger Residen M ager LK/a. 3 rd3 c.nc osures (12 copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WP0 S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339
[
M Ut