{{#Wiki_filter:r   ,
{{#Wiki_filter:r s.
s.
o 00T I 31988 In Reply Refer To:
  ' o                                                 00T I 31988 In Reply Refer To:
Docket:
Docket:   50-285 Omaha Public Power District ATTN:   Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
50-285 Omaha Public Power District ATTN:
This is to advise you of an inspection initiative that has been implemented NRC wide for all operating reactors. Periodically, one or more subject areas (e.g., plant configuration control, maintenance, emergency operating procedures) will be selected for specific team inspection emphasis in the fundamental inspection program. Maintenance has been selected as an area of emphasis by the Director of Nuclear Reactor Regulation, after consultation with the Regional Administrators, and with input from various NRC offices.
Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
This is to advise you of an inspection initiative that has been implemented NRC wide for all operating reactors.
Periodically, one or more subject areas (e.g., plant configuration control, maintenance, emergency operating procedures) will be selected for specific team inspection emphasis in the fundamental inspection program. Maintenance has been selected as an area of emphasis by the Director of Nuclear Reactor Regulation, after consultation with the Regional Administrators, and with input from various NRC offices.
Maintenance team inspections will ce scheduled at each of the Region IV facilities within the next two years.
Maintenance team inspections will ce scheduled at each of the Region IV facilities within the next two years.
The purpose of the inspection is to evaluate each licensee's maintenance performance, both safety related and balance of plant, against existing regulations, industry standards, and accepted good industry practices. The inspection will address all aspects of maintenance performance including preventive and corrective, its scheduling, planning, perfonnance, parts acquisition, and engineering support.
The purpose of the inspection is to evaluate each licensee's maintenance performance, both safety related and balance of plant, against existing regulations, industry standards, and accepted good industry practices.
The inspection will address all aspects of maintenance performance including preventive and corrective, its scheduling, planning, perfonnance, parts acquisition, and engineering support.
To accomplish this task, Region IV has selected two team leaders and formed a seven man inspection team. The team leaders are Dennis L. Kelley and Raymond P. Mullikin. The teams engineering discipline areas are: mechanical, electrical, instrument / control, health physics, and management evaluation.
To accomplish this task, Region IV has selected two team leaders and formed a seven man inspection team. The team leaders are Dennis L. Kelley and Raymond P. Mullikin. The teams engineering discipline areas are: mechanical, electrical, instrument / control, health physics, and management evaluation.
The inspections will consist of two on-site inspection weeks separated by a week of off-site inspection.     Sever 11 weeks prior to the inspection you will receive a letter identifying the team members, specifying the schedule dates of the inspection, a request for specific information, and identifying a one or two day site visit by the team leader to discuss in detail the scope of the inspection.
The inspections will consist of two on-site inspection weeks separated by a week of off-site inspection.
RIV:C:Q           0:0RS           D:DRP JEGaglf     o     JLMilhoan       LJCallan 9 /3a/8             / /88         / /88 8G10240283 881013 PDR Q
Sever 11 weeks prior to the inspection you will receive a letter identifying the team members, specifying the schedule dates of the inspection, a request for specific information, and identifying a one or two day site visit by the team leader to discuss in detail the scope of the inspection.
ADOCK 050002S5 PDC
RIV:C:Q 0:0RS D:DRP JEGaglf o
(\
JLMilhoan LJCallan 9 /3a/8
/ /88
/ /88 8G10240283 881013 PDR ADOCK 050002S5
( \\
Q PDC


1 M           'D Omaha Public Power District                                                                                         If you have questions regardi.ng this inspection, the Region IV team leader designated for your site (Dennis Kelley. 817-860-8289) will be pleased to answer your questions.
M
P                                                                                                                       Sincerely.
'D 1
Omaha Public Power District If you have questions regardi.ng this inspection, the Region IV team leader designated for your site (Dennis Kelley. 817-860-8289) will be pleased to answer your questions.
P Sincerely.
04;ual signca ny' 6% B.Deach
04;ual signca ny' 6% B.Deach
                                                                                                                        'L'. J. Callan, Director Division of Reactor Projects cc:
'L'. J. Callan, Director Division of Reactor Projects cc:
Fort Calhoun Station ATTN:                 W. G. Gates, Manaoer P.O. Box 399 Fort Calhoun, Nebraska 68023 4
Fort Calhoun Station ATTN:
Harry H. Voigt Esq.
W. G. Gates, Manaoer P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt Esq.
LeBoeuf. Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW i                         Washington, D. C.                           20036 hebraska Radiation Control Program Director bec tu DMB (IE01) bec distrib. by RIV:
4 LeBoeuf. Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW i
R.D. Martin, RA                                                                         RPB-DRSS SectionChief(DRP/B)                                                                     MIS System RIY File                                                                               DRP RSTS Operator                                                                           Project Engineer, DRP/B Lisa Shea, RM/ALF                                                                       P. Milano NRR Project Manager DRS                                                                                     RRI J. E. Gagliardo                                                                         D. Kelley R. Mullikin                                                                             J. Roe, NRR A..Gody, NRR}}
Washington, D. C.
20036 hebraska Radiation Control Program Director bec tu DMB (IE01) bec distrib. by RIV:
R.D. Martin, RA RPB-DRSS SectionChief(DRP/B)
MIS System RIY File DRP RSTS Operator Project Engineer, DRP/B Lisa Shea, RM/ALF P. Milano NRR Project Manager DRS RRI J. E. Gagliardo D. Kelley R. Mullikin J. Roe, NRR A..Gody, NRR}}

Latest revision as of 19:57, 7 December 2024

Advises That Insp Initiative Implemented by NRC for All Operating Reactors to Evaluate Maint Performance,Both Safety -related & Balance of Plant,Against Existing Regulations, Industry Stds & Accepted Good Industry Practices
ML20204G976
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/13/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8810240283
Download: ML20204G976 (2)


Text

r s.

o 00T I 31988 In Reply Refer To:

Docket:

50-285 Omaha Public Power District ATTN:

Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:

This is to advise you of an inspection initiative that has been implemented NRC wide for all operating reactors.

Periodically, one or more subject areas (e.g., plant configuration control, maintenance, emergency operating procedures) will be selected for specific team inspection emphasis in the fundamental inspection program. Maintenance has been selected as an area of emphasis by the Director of Nuclear Reactor Regulation, after consultation with the Regional Administrators, and with input from various NRC offices.

Maintenance team inspections will ce scheduled at each of the Region IV facilities within the next two years.

The purpose of the inspection is to evaluate each licensee's maintenance performance, both safety related and balance of plant, against existing regulations, industry standards, and accepted good industry practices.

The inspection will address all aspects of maintenance performance including preventive and corrective, its scheduling, planning, perfonnance, parts acquisition, and engineering support.

To accomplish this task, Region IV has selected two team leaders and formed a seven man inspection team. The team leaders are Dennis L. Kelley and Raymond P. Mullikin. The teams engineering discipline areas are: mechanical, electrical, instrument / control, health physics, and management evaluation.

The inspections will consist of two on-site inspection weeks separated by a week of off-site inspection.

Sever 11 weeks prior to the inspection you will receive a letter identifying the team members, specifying the schedule dates of the inspection, a request for specific information, and identifying a one or two day site visit by the team leader to discuss in detail the scope of the inspection.

RIV:C:Q 0:0RS D:DRP JEGaglf o

JLMilhoan LJCallan 9 /3a/8

/ /88

/ /88 8G10240283 881013 PDR ADOCK 050002S5

( \\

Q PDC

M

'D 1

Omaha Public Power District If you have questions regardi.ng this inspection, the Region IV team leader designated for your site (Dennis Kelley. 817-860-8289) will be pleased to answer your questions.

P Sincerely.

04;ual signca ny' 6% B.Deach

'L'. J. Callan, Director Division of Reactor Projects cc:

Fort Calhoun Station ATTN:

W. G. Gates, Manaoer P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt Esq.

4 LeBoeuf. Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW i

Washington, D. C.

20036 hebraska Radiation Control Program Director bec tu DMB (IE01) bec distrib. by RIV:

R.D. Martin, RA RPB-DRSS SectionChief(DRP/B)

MIS System RIY File DRP RSTS Operator Project Engineer, DRP/B Lisa Shea, RM/ALF P. Milano NRR Project Manager DRS RRI J. E. Gagliardo D. Kelley R. Mullikin J. Roe, NRR A..Gody, NRR