                                            OCT 0 6 1988
..
        Docket No. 50-424
OCT 0 6 1988
        License No. NPF-68
Docket No. 50-424
      feorgiaPowerCompany
License No. NPF-68
        ATTH: Mr. W. G. Hairston, III
feorgiaPowerCompany
                    Senior Vice President -
ATTH: Mr. W. G. Hairston, III
                    Nuclear Operations
Senior Vice President -
        P. O. Box 4545
Nuclear Operations
        Atlanta, GA 30302
P. O. Box 4545
        Gentlemen:
Atlanta, GA 30302
        SUBJECT:   INSPECTION REPORT N0. 50-424/88-43
Gentlemen:
        This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT:
        J. F. Rogge on September 7 - September 30 1988. The inspection included a
INSPECTION REPORT N0. 50-424/88-43
        review of activities authorized for your Vogtle faciliti. At the conclusion of
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
        the inspection, the findings were discussed with those members of your staff
J. F. Rogge on September 7 - September 30 1988.
        identified in the enclosed inspection report.
The inspection included a
        Areas examined during the inspection are identified in the report. Within
review of activities authorized for your Vogtle faciliti. At the conclusion of
        these areas, the inspection consisted of selective examinations of procedures
the inspection, the findings were discussed with those members of your staff
        and representative records, interviews with personnel, and observation of
identified in the enclosed inspection report.
        activities in progress.
Areas examined during the inspection are identified in the report.
        Within the scope of the inspection, no violations or deviations were
Within
        identified.
these areas, the inspection consisted of selective examinations of procedures
        In accordance with Section 2.790 of the NRC's "Rules cf Practice," Part 2,
and representative records, interviews with personnel, and observation of
        Title 10, Code of Federal Regulations, a copy of '.his letter ar.d the enclosure
activities in progress.
        will be placed in the NRC Public Cecument Roca.
Within the scope of the inspection, no violations or deviations were
        Should you have any question's concerriing this letter, please contact us.
identified.
                                                  Sincerely,
In accordance with Section 2.790 of the NRC's "Rules cf Practice," Part 2,
                                                    CRIGINAL SIGNED DY
Title 10, Code of Federal Regulations, a copy of '.his letter ar.d the enclosure
                                                    VIRGlL L. BROWNLEE
will be placed in the NRC Public Cecument Roca.
                                                  Virgil L. Brownlee, Chief
Should you have any question's concerriing this letter, please contact us.
                                                  Reactor Projects Branch 3
Sincerely,
                                                  Division of Reactor Projects
CRIGINAL SIGNED DY
        Enclosure:
VIRGlL L. BROWNLEE
        HRC Inspection Report
Virgil L. Brownlee, Chief
        cc w/ encl:   (See page 2)
Reactor Projects Branch 3
            8810260153 881006                                                               g\
Division of Reactor Projects
          PDR     ADOCK 05000424
Enclosure:
            0                 PDC                                                       .
HRC Inspection Report
cc w/ encl:
(See page 2)
8810260153 881006
g\\
PDR
ADOCK 05000424
0
PDC
.


    _
_
  -
-
        o
o
-* , ,
-*
            * ..     .
*
..
.
, ,
4
4
            Georgia Power Company               2
Georgia Power Company
                                                            OCT 0 6 1988
2
                                                                        ,
OCT 0 6 1988
          fcw/
fcw/ encl:
            R. P.encl:
,
                    Mcdonald, Executive Vice
R. P. Mcdonald, Executive Vice
                President, Nuclear Operations                           r
President, Nuclear Operations
        /P.D. Rice,VicePresident, Project                               .
r
                Director                                               !
/P.D. Rice,VicePresident, Project
        f..W. Hayes,VogtleQuality
.
                Assurance Manager
Director
          /G. Bockhold, Jr., General Manager,
!
                Nuclear Operations
f..W. Hayes,VogtleQuality
          /J.P.Xane, Manager,NuclearLicensingand
Assurance Manager
              . Engineering - Vogtle
/G. Bockhold, Jr., General Manager,
          /J. A. Bailey, Project Licensing
Nuclear Operations
                Manager
/J.P.Xane, Manager,NuclearLicensingand
          /B. W. Churchill, Esq. , Shaw,
. Engineering - Vogtle
                Pittman, Potts and Trowbridge
/J. A. Bailey, Project Licensing
          A.Kirkland,III, Counsel,
Manager
                Office of the Consumer's Utility
/B. W. Churchill, Esq. , Shaw,
                Council
Pittman, Potts and Trowbridge
          /:D.-Feig,GeorgiansAgainst
A.Kirkland,III, Counsel,
                        .
Office of the Consumer's Utility
                Nuclear Energy
Council
            be
/:D.-Feig,GeorgiansAgainst
          d E.cReis,
.
                  w/ encl:
Nuclear Energy
                      OGC
d .c w/ encl:
            vd. Hopkins, NRR
be
            M. Sinkule, RII
E Reis, OGC
                                                                        *
vd. Hopkins, NRR
M. Sinkule, RII
PRS Technical Assistant
*
,
,
            PRS Technical Assistant
2
2
          JNRC Resident Inspector
JNRC Resident Inspector
            Document Cor'uol Desk                                       L
Document Cor'uol Desk
i           State of Georgia                                           l
L
                                                                        k
i
                                                                        !
State of Georgia
l
k
}
}
!
.
.
4
4
?
?
1
1
            RIl                   RII           Ril
RIl
RII
Ril
th
Gb
th
CPatterson:dd
MSinkule
VBrownlee
*
*
                  th
10/5'/88
            CPatterson:dd
10/f/88
                                        Gb
10/f /88
                                    MSinkule
                                                      th
                                                  VBrownlee
'
'
              10/5'/88              10/f/88        10/f /88
}}
}}

Latest revision as of 19:19, 7 December 2024

Forwards Insp Rept 50-424/88-43 on 880907-30.No Violations or Deviations Noted
ML20205A974
Person / Time
Site: Vogtle 
Issue date: 10/06/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20205A980 List:
References
NUDOCS 8810260153
Download: ML20205A974 (2)


See also: IR 05000424/1988043

Text

'

pp

..

.

.

.

..

OCT 0 6 1988

Docket No. 50-424

License No. NPF-68

feorgiaPowerCompany

ATTH: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

INSPECTION REPORT N0. 50-424/88-43

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. F. Rogge on September 7 - September 30 1988.

The inspection included a

review of activities authorized for your Vogtle faciliti. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules cf Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of '.his letter ar.d the enclosure

will be placed in the NRC Public Cecument Roca.

Should you have any question's concerriing this letter, please contact us.

Sincerely,

CRIGINAL SIGNED DY

VIRGlL L. BROWNLEE

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

HRC Inspection Report

cc w/ encl:

(See page 2)

8810260153 881006

g\\

PDR

ADOCK 05000424

0

PDC

.

_

-

o

-*

..

.

, ,

4

Georgia Power Company

2

OCT 0 6 1988

fcw/ encl:

,

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

r

/P.D. Rice,VicePresident, Project

.

Director

!

f..W. Hayes,VogtleQuality

Assurance Manager

/G. Bockhold, Jr., General Manager,

Nuclear Operations

/J.P.Xane, Manager,NuclearLicensingand

. Engineering - Vogtle

/J. A. Bailey, Project Licensing

Manager

/B. W. Churchill, Esq. , Shaw,

Pittman, Potts and Trowbridge

A.Kirkland,III, Counsel,

Office of the Consumer's Utility

Council

/:D.-Feig,GeorgiansAgainst

.

Nuclear Energy

d .c w/ encl:

be

E Reis, OGC

vd. Hopkins, NRR

M. Sinkule, RII

PRS Technical Assistant

,

2

JNRC Resident Inspector

Document Cor'uol Desk

L

i

State of Georgia

l

k

}

!

.

4

?

1

RIl

RII

Ril

th

Gb

th

CPatterson:dd

MSinkule

VBrownlee

10/5'/88

10/f/88

10/f /88

'