ML20205B814: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.   .                                                                                       ;
{{#Wiki_filter:.
                                                  .
;
                                        AUG       5 1986
.
      Docket No. 50-295
.
      Docket No. 50-304
AUG
      Commonwealth Edison Cc'npany
5 1986
      ATTN:   Mr. Cordell Reea
Docket No. 50-295
              Vice President
Docket No. 50-304
      Post Office Box 767
Commonwealth Edison Cc'npany
      Chicago, IL 60690
ATTN:
      Gentlemen:
Mr. Cordell Reea
      This refers to the routine safety inspection conducted by A. G. Januska
Vice President
      of this office on July 21-25, 1986, of activities at Zion Nuclear Generating
Post Office Box 767
      Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and
Chicago, IL 60690
      No. DPR-48 and to the discussion of our findings with E. Fuerst and others
Gentlemen:
      of your staff at the conclusion of the inspection.
This refers to the routine safety inspection conducted by A. G. Januska
      The enclosed copy of our inspection report identifies areas examined during
of this office on July 21-25, 1986, of activities at Zion Nuclear Generating
      the inspection. Within these areas, the inspection consisted of a selective
Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and
      examination of procedures and representative records, observations, and
No. DPR-48 and to the discussion of our findings with E. Fuerst and others
      interviews with personnel. In addition, our Mobile Laboratory was at the
of your staff at the conclusion of the inspection.
      site during the inspection to perform independent measurements of radioactivity.
The enclosed copy of our inspection report identifies areas examined during
      No violations of NRC requirements were identified during the course of this
the inspection.
      inspection.
Within these areas, the inspection consisted of a selective
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
examination of procedures and representative records, observations, and
      of this letter and the enclosed inspection report will be placed in the
interviews with personnel.
      NRC Public Document Room.
In addition, our Mobile Laboratory was at the
      We will gladly discuss any questions you have concerning this inspection.
site during the inspection to perform independent measurements of radioactivity.
                                                Sincerely,
No violations of NRC requirements were identified during the course of this
                                                                      _
inspection.
                                                                            . _ .
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
                                              " Original signed h7
of this letter and the enclosed inspection report will be placed in the
                                                                    T U UF8f"7"
NRC Public Document Room.
  8608120165
We will gladly discuss any questions you have concerning this inspection.
  PDR               860805ADOCK
Sincerely,
                      PDP                 05000295
_
                                                W. D. Shafer, Chief
. _ .
  O
T U UF8f"7"
                                                  Emergency Preparedness and
" Original signed h7
                                                    Radiological Protection Branch
8608120165 860805ADOCK 05000295
      Enclosure: Inspection Reports
PDR
        No. 50-295/86018(DRSS); and
PDP
        No. 50-304/86017(DRSS)
W. D. Shafer, Chief
      See Attached Distribution
O
                                                            {
Emergency Preparedness and
                                                                                    G)
Radiological Protection Branch
      RIII             RIII   '
Enclosure:
                                      RII , f           RI                           g\
Inspection Reports
      Januska/1s       S     akher     Burgess         @,
No. 50-295/86018(DRSS); and
                                        u.
No. 50-304/86017(DRSS)
                                                            7
See Attached Distribution
                        . .               .             ..                   .- .       .
{
G)
RIII
RIII
RII , f
RI
g\\
'
Januska/1s
S
akher
Burgess
@,
u.
7
. .
.
..
.- .
.


  .
.
      .
.
        Comonwealth Edi:,on Company       2
Comonwealth Edi:,on Company
                                            M 5E
2
        Distribution
M
        cc w/ enclosure:
5E
        D. L. Farrar, Director
Distribution
          of Nuclear Licensing
cc w/ enclosure:
        G. J. Plim1, Station Manager
D. L. Farrar, Director
        JanNorris,ProjectManager,NRR
of Nuclear Licensing
        DCS/RSB (RIDS)
G. J. Plim1, Station Manager
        Licensing Fee Management Branch
JanNorris,ProjectManager,NRR
        Resident Inspector, RIII
DCS/RSB (RIDS)
        Phyllis Dunton, Attorney
Licensing Fee Management Branch
          General's Office, Environmental
Resident Inspector, RIII
          Control Division
Phyllis Dunton, Attorney
        Mayor, City of Zion
General's Office, Environmental
    .
Control Division
Mayor, City of Zion
.
i
i
}}
}}

Latest revision as of 19:13, 7 December 2024

Forwards Safety Insp Repts 50-295/86-18 & 50-304/86-17 on 860721-25.No Violations Noted
ML20205B814
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/05/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20205B820 List:
References
NUDOCS 8608120165
Download: ML20205B814 (2)


See also: IR 05000295/1986018

Text

.

.

.

AUG

5 1986

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Cc'npany

ATTN:

Mr. Cordell Reea

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by A. G. Januska

of this office on July 21-25, 1986, of activities at Zion Nuclear Generating

Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and

No. DPR-48 and to the discussion of our findings with E. Fuerst and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

In addition, our Mobile Laboratory was at the

site during the inspection to perform independent measurements of radioactivity.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

_

. _ .

T U UF8f"7"

" Original signed h7

8608120165 860805ADOCK 05000295

PDR

PDP

W. D. Shafer, Chief

O

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

No. 50-295/86018(DRSS); and

No. 50-304/86017(DRSS)

See Attached Distribution

{

G)

RIII

RIII

RII , f

RI

g\\

'

Januska/1s

S

akher

Burgess

@,

u.

7

. .

.

..

.- .

.

.

.

Comonwealth Edi:,on Company

2

M

5E

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Plim1, Station Manager

JanNorris,ProjectManager,NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

.

i