| number = ML20207F541
| issue date = 09/30/1986
| title = Monthly Operating Rept for Sept 1986
| author name = Edelman M, Farmer T, Stead F
| author affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
| addressee name = Hiller L
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000440
| license number =
| contact person =
| document report number = PY-CEI-NRR-0544, PY-CEI-NRR-544, NUDOCS 8701060118
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 7
}}
 
=Text=
{{#Wiki_filter:__  ,m      v.
  . V m
CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT September I - September 30, 1986 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER:      50-440 LICENSE' NLS1BER: NPF-4 5 Submitted By: I Plant        h ical Mana er a  'n PlantOperationspanager 8701060118 860930 PDR  ADOCK 05000440 R                      PDR                                                              4,{o vi Q
                  . -    -.    ._  - _ . .      _  __    ~ . . _ . . _ _ _ - _ _ _ _ _ _ . .          . .-_  ___._  . _ , - .
 
Table of Contents Operations Summary .  . . . .. . . . . . . . . . . , , , , , , , , , ,            3 Average Daily Unit Power Level .          . . . . . . . . . . . . . . . . . .  .2 Operating Data Report    . . .. . . . . . . , , , , , , , , , , , , ,          ,3 Unit Shutdown and Power Reductions          . . . . . . . . . . . , , . . . , .4
 
c                    -      -
: 9.      3
    ".['          .
        - +
b b
September Operations Summary Nuclear Heatup continued this month. Safety relief valve '(SRV) testing and low pressure testing of RCIC for Test' Condition HEATUP were completed, as'was the constant heatup rate calibration for the power range nuclear instrumentation. HVAC flow verification (M99) preoperational testing is expected to be completed by mid October.
Perry experienced its first scram while critical this month on September 2, 1986. The reactor scram occurred due to an upscale trip on the Intermediate Range Neutron Monitors (IRM) during initial nuclear.heatup testing. A sudden increase in sensed steam pressure caused the steam bypass valves to fully open resulting in a reactor pressure decrease.      Subsequent operator action to reshut the bypass valves combined with an isolated pressure transmitter caused all the steam bypass valves to shut resulting in a void collapse and. neutron flux spike. Following corrective maintenance on the Steam Bypass System'and other maintenance activities, the reactor returned to operation on September 7.
c._____________.___________
 
{s.            1,
.~
t Average Daily Unit Power Level DOCKET No. 50-440 UNIT Perry - One DATE 10/02/86 COMPLETED BY T. Farmer.
TELEPHONE 216/259-3737
'!.            MONTH- September, 1986 DAY    AVER /GE DAILY POWER LEVEL        DAY    AVERAGE DAILY POWER LEVEL
                              -(MWe-Net)                                (MWe-Net) 1                0                        17              0 2                -0                        18              0 3                0                        19              0 4'                O                      20              0            -
5                0                      21              0 6-                0                      22              0 7                0                      23              0 8                0                      24              0 9                0                      25              0                    ,
10                0                      26              0 11                0                      27-              0 12                0                      28 -            0 13                0-                      29              0 14                0                      30              0 15~                0                      31              N/A 16                0 INSTRUCTIONS-On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
  .e-Oparating Data Rzport
        .                    .  .                                                                    q DOCKET NO. 50-440 DATE 10/02/86 COMPLETED BY  T. Farmer TELEPHONE 216/259-3737 OPERATING STATUS
: 1. Unit Name: Perry-One
: 2. -Reporting Period: September, 1986
: 3. ' Licensed Thermal Power (MWt):      178
: 4. Nameplate Rating (Gross MWe): 1250
: 5. Design Electrical Rating (Net MWe):        1205
: 6. Maximum Dependable Capacity (Gross MWe): N/A
: 7. Maximum Dependable Capacity (Net MWe): N/A
: 8. If Changes: Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report. Give Reasons:
N/A
              .9. Power Level To Which Restricted. If Any (Net MWe): 0
: 10. Reasons for Restrictions. If Any: NRC Restriction to    5% Reactor Power This Month  Yr-to-Date    Cumulative
: 11. Hours In Reporting Period                  720        4727          4727
: 12. Number of Hours Reactor Was              602.9      604.03        604.03 Critical
: 13. Reactor Reserve Shutdown Hours              0          0              0 14 . Hours Generator On-Line                        0          0              0
: 15. Unit Reserve Shutdown Hours                    0          0              0
: 16. Gross Thermal Energy Generated              18.244-      18,244        18,244-m                    (MWH)
            -17. Gross Electrical Energy Generated            0          0              0 (MWH)
: 18.      Net Electrical Energy Generated            0          0              0 (MWH)-
: 19. Unit Service Factor                          0          0              0
: 20. Unit Availability. Factor                    0          0              0
: 21. Unit Capacity Factor (Using-                0          0              0 MDC Net)
: 22. Unit Capacity Factor (Using                  0          0              0 DER Net)
: 23. U, pit Forced Outage Rate                    0          0              0
: 24. Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):
None
: 25.      If Shut Down At End of Report Period. Estimated Date of Startup:
N/A
: 26.      Units In Test Status (Prior to Commercial Operation):
Forecast                      Achieved INITIAL CRITICALITY                                                  06/06/86
* INITIAL ELECTRICITY                  07/28/86
                  ** COMMERCIAL OPERATION                  ll/13/86
* Generator Syncronization
              **End Power Ascension (100 Hour Warranty Run)
N/A - Not applicable due to 5% Power Restriction
 
l, I
SF                    N
: :                  o SF co hr                  D ec                  a de                  t ud                  e l
e d
HR, -    -
HGF              EDCBAR                      og u,oC
  - - -          - - - - - e                  vjyq OOA LORRMEa t p d ip eeaq s hemceg fiuo er ier uunin r an nal et p                      :
y agN t is t al em
( i s eot i ne                                : ujy o*
i Eot            ronan xnr E              rg nt                    mjy',CD C p aa xTy                  c                o c g y' g u c 2."
l l t ar                eF a      imaR                    a iEviie                    oi nr e nns                r l                    R        L
) r      ait                  u              eEi o    t nr          Tr                    p vc r    ig i          ee                    oee o      c      s                      rnn
(    n&t            t (                    t t s                            U E            i            E                        e                      N x            o            x              #        e                      I p              n          p                                                T l                        l a                          a                                                S i                        i
                                                  >ug                      R      H n                          n                .
E    U
    )                          )                                          P      T g g. ,                    O      D R      O T      W 3                                          N 4321 M                    vgggCw                      M      S
                    - - - - e                                            O OAMMt t uaah ugg                      N      A ht nno T      N H      D eouud rmaa:
al l                                                S      P e      O
( t EiS p      W E
t xcc                                                    e      R p      r l Sa                                                  m R
acm i r b
e      E D
na                                                    ,r      U
                  ) m                                                            C 1    T 9    I 8    O 6      N S
P        C r        a e        u v        s eAe nc t t &
i roc 4        eno c
5    1 EEf E                              r E        0vnox                        ut r x        2et r h                      roe r        c h        2nr              i i      ) ty Pb                      e        t b                    r i              n        i i            RSet                    c        v t          e hp                      e        e          C p eaG                                        O I
oer                                          M          D
            -        r t a -                                  TP            UO S          t s t                        ,          EL            NC a                    iI                              LE            I K m          ( fon                                    ET            TE e          Lons                                    PE              T Er            t                          HDDN S          R        or                              O        AAN o          ) Lfu                                    NBTM u              i          c                          E Y E E .O r          Fc Dt                                  2  T          P 5 c          ieai 1
0e      0 e                                                  1  .
l nt o                                  6        /r      -
es an                                  /  F 0r          4 e          s                        2  a 3 ~v 4
( e                                    5  r /        - 0 N                                      9  m 8O U                                        - e 6 n R                                      3  r          e E                                      7 G                                      3                      .
7
 
7  -
f THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN SR. VICE PRESCENT NUCLEAR October 14, 1986 PY-CEI/NRR-0544 L Mr. Lee Ililler Of fice of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.        20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report
 
==Dear Mr. Hiller:==
 
Attached is the September, 1986 monthly operating report for Perry Unit 1. This report is submitted in accordance with Technical Specification 6.9.1.8.
Please feel free to contact me if you have any questions.
Very truly yours, Murray R. Edelman Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.