ML20203H359: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:-_          _
          +*,                                                                              TDEo%
                                                    UNITED STATES
        !                c              NUCLEAR REGULATORY COMMISSION
        $                                        WASHINGTON, D. C. 20655
          % , , , , , +#                            April 9, 1986
                        Ms. Billie Pirner Garde Director
                        Environmental Whistleblower Clinic
                        Government Accountability Project
                        Suite 202
                        1555 Connecticut Avenue, NW                                IN RESPONSE REFER
                        Washington, DC      20036                                  TO F01A-86-36
                        Dear Ms. Garde:
                        This is in partial response to your letter dated January 14, 1986, in
                        which you requested, pursuant to the Freedom of Information Act (F0IA),
                        all records regarding Inspection Report 50-445/85-13 and 50-446/85-09,
                        dated December 24, 1985.
                        The 77 records identified on the enclosed Appendix A are now available
                        for public inspection and copying at the NRC Public Document Room in
                        file folder F01A-86-36 under your name.
                        Additional documents subject to your F0IA request are undergoing
                        further review. We will communicate with you in the future when
                        this review is complete.
                                                                                          '
W                                                                      Donni'e H. Grimsley, Director
                                                                        Division of Rules and Records
                                                                        Office of Administration
                        Enclosure: As stated
                8604290400 860409
                PDR FOIA
                GARDEs6-36              PDR
  ..
 
m-s_ &t;:acces                        r-    m~    ,:a .m:ae= r , m,. cs=              xc n . .
        ';
        '
                  'T
          <..      ..
                                                                        R2: F01A-86-36
                                                    APPENDIX A
                                          RECORDS IN PDR FILE F01A-86-36
      1.    Undated      CPRT Objectivity Questionnaire (form only)    (1p3
    2.      Undated      Comanche Peak SSER 10 procedures, out of context. N-99
                          through 112 (14pgs)
f-
      .
    3.., Undated        Comanche Peak SSER 8 procedures, out of context, K-16
                          and K-52    (2pgs)
                                                                                                  .
m
    -4.    Undated      ERC Procedures and Instructions, handwritten notes (4pgs)
    5. Undated          CPSES/FSAR procedures, out of context, 10.3-1 through 4, with
                          two dated amendments included    (4pgs)
    6. 3/31/80          Amendment 10 to iia design pressures procedure, 6.2-14k (1pg)
                          w/att, CPSES/FSAR Table 6.2.1-23 (1pg)
l
    7.      1/85        NuReg-0797 Safety Evaluation Report related to the operation
4          -
                          of Comanche Peak Steam Electric Station, Units 1 and 2 (10pgs)
                        (not complete) SER
    8. 4/25/85          Comanche Peak Response Team Action Plan Item Number II.a.
                          Title: Rdinforcing Steel in the Reactor Cavity (8pgs)
    -9. 4/25/85          Comanche P,eak Response Team Action Plan Item Number II.e,
                          Title: Rebar in the Fuel Handling Building (8pgs)
    10. 4/25/85          Comanche Peak Response Team Action Plan Item' Number II.d,
                          Title: Seismic Design of Control Room Ceiling Elements (19pgs)
    11, '6/21/85          Comanche Peak Response Team Action Plan Item Number VII.b.2,
                          Title: Valve Disassembly    (10pgs)
  -12. 8/14/85          Valve Reinspection Checklists, Issue VII.b.2, different item
                          numbers (7pgs) w/ attached cover sheet for Comanche Peak
                          Response Team Quality Instruction For Issue Specific Action
                          Plan VII.B.2    (1pg)
                      '
                                                                            . ........ - .  _
                                                                                                    --
 
m;_2:::ELMR.5?rT:::~t*: .                  "'tz:itzenuw::.:ac ^=.:.. cMt;tqy              ,
      -;  ..-
        c.  ..
                                                                  Re: F01A-86-36
                                                                  .
                                              APPENDIX A
                                              (Continued)
    13. 8/16/85    Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CATY-004
                    (1pg)
    14. 8/19/85    Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-045
                    (3pgs)
    15. 8/19/85    Facsimile Transmittal form, Poslusny to Westerman w/att,
                  copies of hearing transcripts out of context (18pgs)
    16. 8/21/85    Handwritten note from Streeter to John Honekamp 8 site              *
    -
                  w/ cover (2pgs)-
    17. 8/30/85    Inspection witness sheet,' package no. I-S-SBPS-019  (1pg)
    18. 8/30      Witnessed Inspections, Small Bore Pipe Supports VII.c (1pg)
    19. 9/85      QI-008, Rev. 1 closeout in Activity Rpt for Sept 1985 (1pg)
    20. 9/3/85    NRC Witness Inspection sheets, various dates from 9/3/85
                  through 9/27/85 (21pgs)
k
' 21. '9/5/85
  -
                  Handwritten note re I-E-CABL-004    (1pg)
.  22. 9/5/85    Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-004
                    (1pg)    "
    23. 9/6/85.    Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-007
                    (2pgs)
    24. 9/6/85    Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-030
                    (1pg)
    25. 9/10/85    Witness inspection Pkg No. I-S-SBPS-038    (1pg)
    26. 9/11/85    Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CATY-129
                    (3pgs)
    27. 9/11/85    Reinspection shee't, ISAP No. VII.c Verif Pkg I-E-EEIN-1
                    (2pgs)
    28. 9/11/85    Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-005
                    (2pgs)
                                                                                --- . . , .
 
  n_              ~                  w        ~ ~ n      ,  m,  ~    ,
                                                                          e sn.x.u.u z.;;; a .x;;,. m m x , u ,
                    *
                    .
        .,            ..
                                                                          RE: F0!A-86-36
                                                    APPENDIX A
                                                    (Continued)
  29.- 9/11/85          Reinspection sheet. ISAP VII.c Verif~Pkg I-E-EEIN-052
                          (1pg)
  30. 9/12/85            Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-035
        .                (I PS)
  31'.    9/12/85      Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-016
                          (2pgs)
  .32.      9/12/85      Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-060
                          (2pgs)
                          witness inspection sheet 'Pkg No. CC-1-SB-043-009-3        (1pg)
  33. 9/12/85-
  34.      9/13/85      Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-45
                          (1pg only)
  35.      9/13/85      Reinspection sheet. ISAP'No. VII.c Verif Pkg I-E-EEIN-24
                          (3pgs)
                          Ob.servations Log - Input    ISAP No. V.a Verif Pkg CC-2-028-414-S33R
436.        9/16/85
                              8. . ;
                                ,
  - 37. '9/16/85
          -
                          Observations Log - Followup      (ipg)
    38.      8/8/85      Drawing, CC-2-028-414-S33R (1pg)
    39.-      9/16/85      Observations Log - Input ISAP No. V.d Verif Pkg CT-2-004-407-S32A
                          (1pg)
    40.      9/16/85      Observations Log - Followup (1pg)
    41.-      9/16/85      Observations Log - Input ISAP No. V.d    Verif Pkg FSE-00159,
                          sheet 10403, Rev. 2 (1pg)
    42.      9'/16/85    Observations Log - Followup (1pg)
    43.      9/16/85      Observations Log - Input ISAP No. V.d Verif Pkg FSE-159-10471
                          Rev. 1      (1pg)
'
    44. - 9/16/85          Observations Log - Followup (1pg)
  .C3.      9/17/85      Observations Log - Input ISAP No. V.d Verif Pkg FSE-00159-2630
                            (1pg)
    C3.      9/17/85      Observations Log - Followup (2pgs)
    47.      9/17/85      Observations Log - Input ISAP NO. V.d Verif Pkg FSE-00159-4023/
                            -4039      (1p'g)
        (                . att, observation log - follow up (not completed) (ipg
                                                                                                                *
,
h
 
,__~._.n.~,.                        ,~g.,_..-..---~              ~~  -n- _ .,_ m.m
                .
                                                                      Ra: FOIA-86-36
  .-                                                                  .
                                                    APPENDIX A
                                                    (Continued)
  C. 9/6/85          Independent-inspection sheet, R.W. Bonnenberg, Cable Spread
                    Roon (1pg)
  49.: 9/17/85      Observations Log - Input ISAP No. VII.c Verif Pkg None
                    (1pg) Observations 1,og - Followup (not completed) '(1pg)
  50. .9/13/85    -CPRT - Issue Specific Action Plans, V.a. V.d. V.e, VI.b
                    (1pg)
  51. 9/16/85      . Observations Log - Input ISAP No. V.d' Verif Pkg CV-1-008-716-  '
      .            A45C (1pg)                                                ,
  52. 9/16/85      Observations Log - Followup (1pg) w/ drawing (1pg)'
  53. 9/20/85      Observations Log - Input liiAP No. V.d      Verif Pkg SF-X-055-
                    003-F45R (1pg)
  54. 9/20/85      Observations Log - Fo110wup (1pg)
  55.    9/16/85    Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-012
                    (1pg)
  56. -9/16/85      Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-003
P          .        (1pg)
  57.    9/16/85    Reinspection sheet. ISAP No. VII.c Verif Pkg'I-E-EEIN-039
                    (Ipg)
  58.z 9/16/85      Reinspectio'ti sheet, ISAP No. VII.c Verif Pkg I-E-CNT-077
                    (1pg)
                                ~
  59.    9/16/85    Witnessfinspectionsheet, Pkg No. I-S-CONC-12        (1pg)
  60.. 9/16/85      witness'; Inspection sheet, Pkg No. I-S-CONC-08    (1pg)
  61..  9/17/85    Witness %nspectionsheet, Pkg No. I-S-CONC-47 (1pg)
  62.    9/17/85    Witnessinspectionsheet, ISAP No. VII.c Verif Pkg I-E-EEIN-29
                      (2pgs)
  63.    9/17/85~    Witness reinspection sheet, ISAP No. VII.c Verif Pkg
                    I-E-EEIN-42    (2pgs).
  64. < 9/18/85      Witness reinspection sheet, Pkg No. I-S-CONC-06      (1pg)
  65.    9/18/85    Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-076
                      (1pg)
                              .
                                                    M
 
v              -
                            ,
                  '
              ,;,.  *
                                                                            R2: F0!A-86-36
'                                                                            *
          ..
                                                        APPEN9IX A                        ,
                                                        (Continued)
                          -
,
      66.      9/18/85        Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-027
                              (?pgs).
    . 67.-    9/18/85        Reinspection sheet, ISAP NO. VII.'c .Verif Pkg I-E-CDUT-044
                              (1pg)
      68. ~9/20/85            Witness inspection sheet, Pkg No. I-S-CONC-41    (1pg)
      69.. 9/23/85'          Witness inspection sheet, Pkg No. I-S-CONC-52    (1pg)
      70.' 9/23/85'          Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-080
                              (1pg)
      7 '. .  9/26/85        Witness inspection sheet, Pkg No. I-S-LINR-51    (1pg)
                                                                                              1
      72.      9/26/85        Witness inspection sheet, Pkg No. I-S-LINR-06    (1pg)
    -- 73.    9/27/85'      Witness inspection sheet, Pkg No. I-S-LINR-55    (1pg)
    .74.      9/27/85        Witness inspection sheet..Pkg No. I-S-LINR-21    (1pg)
      75 - 9/77/85            Witness inspection sheet, Pkg No. I-S-LINR-13    (1pg)
      76. undated            ~SSER, IIe,' Allegation category: Civil and Structural 15,
  f)                            Rebar Improperly Drilled (5 pages).
      77. 8/15/85-            PlugWelds, units 1and2,Pipesupports(12pages).
-
,
                                                                                  t
                                            a
                        h
                                                                                            t
                                                          f
..
}}
}}

Revision as of 15:41, 31 December 2020

Partial Response to FOIA Request Re 851224 Insp Repts 50-445/85-13 & 50-446/85-09.Forwards App a Documents. Documents Also Available in Pdr.Addl Documents Subj to Request Undergoing Further Review
ML20203H359
Person / Time
Site: Comanche Peak  
Issue date: 04/09/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20203H364 List:
References
FOIA-86-36 NUDOCS 8604290480
Download: ML20203H359 (6)


See also: IR 05000445/1985013

Text

-_ _

+*, TDEo%

UNITED STATES

! c NUCLEAR REGULATORY COMMISSION

$ WASHINGTON, D. C. 20655

% , , , , , +# April 9, 1986

Ms. Billie Pirner Garde Director

Environmental Whistleblower Clinic

Government Accountability Project

Suite 202

1555 Connecticut Avenue, NW IN RESPONSE REFER

Washington, DC 20036 TO F01A-86-36

Dear Ms. Garde:

This is in partial response to your letter dated January 14, 1986, in

which you requested, pursuant to the Freedom of Information Act (F0IA),

all records regarding Inspection Report 50-445/85-13 and 50-446/85-09,

dated December 24, 1985.

The 77 records identified on the enclosed Appendix A are now available

for public inspection and copying at the NRC Public Document Room in

file folder F01A-86-36 under your name.

Additional documents subject to your F0IA request are undergoing

further review. We will communicate with you in the future when

this review is complete.

'

W Donni'e H. Grimsley, Director

Division of Rules and Records

Office of Administration

Enclosure: As stated

8604290400 860409

PDR FOIA

GARDEs6-36 PDR

..

m-s_ &t;:acces r- m~ ,:a .m:ae= r , m,. cs= xc n . .

';

'

'T

<.. ..

R2: F01A-86-36

APPENDIX A

RECORDS IN PDR FILE F01A-86-36

1. Undated CPRT Objectivity Questionnaire (form only) (1p3

2. Undated Comanche Peak SSER 10 procedures, out of context. N-99

through 112 (14pgs)

f-

.

3.., Undated Comanche Peak SSER 8 procedures, out of context, K-16

and K-52 (2pgs)

.

m

-4. Undated ERC Procedures and Instructions, handwritten notes (4pgs)

5. Undated CPSES/FSAR procedures, out of context, 10.3-1 through 4, with

two dated amendments included (4pgs)

6. 3/31/80 Amendment 10 to iia design pressures procedure, 6.2-14k (1pg)

w/att, CPSES/FSAR Table 6.2.1-23 (1pg)

l

7. 1/85 NuReg-0797 Safety Evaluation Report related to the operation

4 -

of Comanche Peak Steam Electric Station, Units 1 and 2 (10pgs)

(not complete) SER

8. 4/25/85 Comanche Peak Response Team Action Plan Item Number II.a.

Title: Rdinforcing Steel in the Reactor Cavity (8pgs)

-9. 4/25/85 Comanche P,eak Response Team Action Plan Item Number II.e,

Title: Rebar in the Fuel Handling Building (8pgs)

10. 4/25/85 Comanche Peak Response Team Action Plan Item' Number II.d,

Title: Seismic Design of Control Room Ceiling Elements (19pgs)

11, '6/21/85 Comanche Peak Response Team Action Plan Item Number VII.b.2,

Title: Valve Disassembly (10pgs)

-12. 8/14/85 Valve Reinspection Checklists, Issue VII.b.2, different item

numbers (7pgs) w/ attached cover sheet for Comanche Peak

Response Team Quality Instruction For Issue Specific Action

Plan VII.B.2 (1pg)

'

. ........ - . _

--

m;_2:::ELMR.5?rT:::~t*: . "'tz:itzenuw::.:ac ^=.:.. cMt;tqy ,

-; ..-

c. ..

Re: F01A-86-36

.

APPENDIX A

(Continued)

13. 8/16/85 Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CATY-004

(1pg)

14. 8/19/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-045

(3pgs)

15. 8/19/85 Facsimile Transmittal form, Poslusny to Westerman w/att,

copies of hearing transcripts out of context (18pgs)

16. 8/21/85 Handwritten note from Streeter to John Honekamp 8 site *

-

w/ cover (2pgs)-

17. 8/30/85 Inspection witness sheet,' package no. I-S-SBPS-019 (1pg)

18. 8/30 Witnessed Inspections, Small Bore Pipe Supports VII.c (1pg)

19. 9/85 QI-008, Rev. 1 closeout in Activity Rpt for Sept 1985 (1pg)

20. 9/3/85 NRC Witness Inspection sheets, various dates from 9/3/85

through 9/27/85 (21pgs)

k

' 21. '9/5/85

-

Handwritten note re I-E-CABL-004 (1pg)

. 22. 9/5/85 Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-004

(1pg) "

23. 9/6/85. Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-007

(2pgs)

24. 9/6/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-030

(1pg)

25. 9/10/85 Witness inspection Pkg No. I-S-SBPS-038 (1pg)

26. 9/11/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CATY-129

(3pgs)

27. 9/11/85 Reinspection shee't, ISAP No. VII.c Verif Pkg I-E-EEIN-1

(2pgs)

28. 9/11/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-005

(2pgs)

--- . . , .

n_ ~ w ~ ~ n , m, ~ ,

e sn.x.u.u z.;;; a .x;;,. m m x , u ,

.

., ..

RE: F0!A-86-36

APPENDIX A

(Continued)

29.- 9/11/85 Reinspection sheet. ISAP VII.c Verif~Pkg I-E-EEIN-052

(1pg)

30. 9/12/85 Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-035

. (I PS)

31'. 9/12/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-016

(2pgs)

.32. 9/12/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-060

(2pgs)

witness inspection sheet 'Pkg No. CC-1-SB-043-009-3 (1pg)

33. 9/12/85-

34. 9/13/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-45

(1pg only)

35. 9/13/85 Reinspection sheet. ISAP'No. VII.c Verif Pkg I-E-EEIN-24

(3pgs)

Ob.servations Log - Input ISAP No. V.a Verif Pkg CC-2-028-414-S33R

436. 9/16/85

8. . ;

,

- 37. '9/16/85

-

Observations Log - Followup (ipg)

38. 8/8/85 Drawing, CC-2-028-414-S33R (1pg)

39.- 9/16/85 Observations Log - Input ISAP No. V.d Verif Pkg CT-2-004-407-S32A

(1pg)

40. 9/16/85 Observations Log - Followup (1pg)

41.- 9/16/85 Observations Log - Input ISAP No. V.d Verif Pkg FSE-00159,

sheet 10403, Rev. 2 (1pg)

42. 9'/16/85 Observations Log - Followup (1pg)

43. 9/16/85 Observations Log - Input ISAP No. V.d Verif Pkg FSE-159-10471

Rev. 1 (1pg)

'

44. - 9/16/85 Observations Log - Followup (1pg)

.C3. 9/17/85 Observations Log - Input ISAP No. V.d Verif Pkg FSE-00159-2630

(1pg)

C3. 9/17/85 Observations Log - Followup (2pgs)

47. 9/17/85 Observations Log - Input ISAP NO. V.d Verif Pkg FSE-00159-4023/

-4039 (1p'g)

( . att, observation log - follow up (not completed) (ipg

,

h

,__~._.n.~,. ,~g.,_..-..---~ ~~ -n- _ .,_ m.m

.

Ra: FOIA-86-36

.- .

APPENDIX A

(Continued)

C. 9/6/85 Independent-inspection sheet, R.W. Bonnenberg, Cable Spread

Roon (1pg)

49.: 9/17/85 Observations Log - Input ISAP No. VII.c Verif Pkg None

(1pg) Observations 1,og - Followup (not completed) '(1pg)

50. .9/13/85 -CPRT - Issue Specific Action Plans, V.a. V.d. V.e, VI.b

(1pg)

51. 9/16/85 . Observations Log - Input ISAP No. V.d' Verif Pkg CV-1-008-716- '

. A45C (1pg) ,

52. 9/16/85 Observations Log - Followup (1pg) w/ drawing (1pg)'

53. 9/20/85 Observations Log - Input liiAP No. V.d Verif Pkg SF-X-055-

003-F45R (1pg)

54. 9/20/85 Observations Log - Fo110wup (1pg)

55. 9/16/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-012

(1pg)

56. -9/16/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-003

P . (1pg)

57. 9/16/85 Reinspection sheet. ISAP No. VII.c Verif Pkg'I-E-EEIN-039

(Ipg)

58.z 9/16/85 Reinspectio'ti sheet, ISAP No. VII.c Verif Pkg I-E-CNT-077

(1pg)

~

59. 9/16/85 Witnessfinspectionsheet, Pkg No. I-S-CONC-12 (1pg)

60.. 9/16/85 witness'; Inspection sheet, Pkg No. I-S-CONC-08 (1pg)

61.. 9/17/85 Witness %nspectionsheet, Pkg No. I-S-CONC-47 (1pg)

62. 9/17/85 Witnessinspectionsheet, ISAP No. VII.c Verif Pkg I-E-EEIN-29

(2pgs)

63. 9/17/85~ Witness reinspection sheet, ISAP No. VII.c Verif Pkg

I-E-EEIN-42 (2pgs).

64. < 9/18/85 Witness reinspection sheet, Pkg No. I-S-CONC-06 (1pg)

65. 9/18/85 Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-076

(1pg)

.

M

v -

,

'

,;,. *

R2: F0!A-86-36

' *

..

APPEN9IX A ,

(Continued)

-

,

66. 9/18/85 Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-027

(?pgs).

. 67.- 9/18/85 Reinspection sheet, ISAP NO. VII.'c .Verif Pkg I-E-CDUT-044

(1pg)

68. ~9/20/85 Witness inspection sheet, Pkg No. I-S-CONC-41 (1pg)

69.. 9/23/85' Witness inspection sheet, Pkg No. I-S-CONC-52 (1pg)

70.' 9/23/85' Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-080

(1pg)

7 '. . 9/26/85 Witness inspection sheet, Pkg No. I-S-LINR-51 (1pg)

1

72. 9/26/85 Witness inspection sheet, Pkg No. I-S-LINR-06 (1pg)

-- 73. 9/27/85' Witness inspection sheet, Pkg No. I-S-LINR-55 (1pg)

.74. 9/27/85 Witness inspection sheet..Pkg No. I-S-LINR-21 (1pg)

75 - 9/77/85 Witness inspection sheet, Pkg No. I-S-LINR-13 (1pg)

76. undated ~SSER, IIe,' Allegation category: Civil and Structural 15,

f) Rebar Improperly Drilled (5 pages).

77. 8/15/85- PlugWelds, units 1and2,Pipesupports(12pages).

-

,

t

a

h

t

f

..