Partial Response to FOIA Request Re 851224 Insp Repts 50-445/85-13 & 50-446/85-09.Forwards App a Documents. Documents Also Available in Pdr.Addl Documents Subj to Request Undergoing Further Review
ML20203H359
Person / Time
Site: Comanche Peak  
Issue date: 04/09/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20203H364 List:
References
FOIA-86-36 NUDOCS 8604290480
Download: ML20203H359 (6)


See also: IR 05000445/1985013

Text

-_

_

TDEo%

+*,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

c

$

WASHINGTON, D. C. 20655

% , , , , , +#

April 9, 1986

Ms. Billie Pirner Garde Director

Environmental Whistleblower Clinic

Government Accountability Project

Suite 202

1555 Connecticut Avenue, NW

IN RESPONSE REFER

Washington, DC

20036

TO F01A-86-36

Dear Ms. Garde:

This is in partial response to your letter dated January 14, 1986, in

which you requested, pursuant to the Freedom of Information Act (F0IA),

all records regarding Inspection Report 50-445/85-13 and 50-446/85-09,

dated December 24, 1985.

The 77 records identified on the enclosed Appendix A are now available

for public inspection and copying at the NRC Public Document Room in

file folder F01A-86-36 under your name.

Additional documents subject to your F0IA request are undergoing

further review. We will communicate with you in the future when

this review is complete.

'

W

Donni'e H. Grimsley, Director

Division of Rules and Records

Office of Administration

Enclosure: As stated

8604290400 860409

PDR

FOIA

GARDEs6-36

PDR

..

m-s_ &t;:acces

r-

m~

,:a .m:ae= r , m,. cs=

xc n . .

';

'T

'

<..

..

R2: F01A-86-36

APPENDIX A

RECORDS IN PDR FILE F01A-86-36

1.

Undated

CPRT Objectivity Questionnaire (form only)

(1p3

2.

Undated

Comanche Peak SSER 10 procedures, out of context. N-99

through 112 (14pgs)

f-

.

3.., Undated

Comanche Peak SSER 8 procedures, out of context, K-16

and K-52

(2pgs)

.

m

-4.

Undated

ERC Procedures and Instructions, handwritten notes (4pgs)

5. Undated

CPSES/FSAR procedures, out of context, 10.3-1 through 4, with

two dated amendments included

(4pgs)

6. 3/31/80

Amendment 10 to iia design pressures procedure, 6.2-14k (1pg)

w/att, CPSES/FSAR Table 6.2.1-23 (1pg)

l

7.

1/85

NuReg-0797 Safety Evaluation Report related to the operation

4

of Comanche Peak Steam Electric Station, Units 1 and 2 (10pgs)

-

(not complete) SER

8.

4/25/85

Comanche Peak Response Team Action Plan Item Number II.a.

Title: Rdinforcing Steel in the Reactor Cavity (8pgs)

-9.

4/25/85

Comanche P,eak Response Team Action Plan Item Number II.e,

Title: Rebar in the Fuel Handling Building (8pgs)

10. 4/25/85

Comanche Peak Response Team Action Plan Item' Number II.d,

Title: Seismic Design of Control Room Ceiling Elements (19pgs)

11, '6/21/85

Comanche Peak Response Team Action Plan Item Number VII.b.2,

Title: Valve Disassembly

(10pgs)

-12. 8/14/85

Valve Reinspection Checklists, Issue VII.b.2, different item

numbers (7pgs) w/ attached cover sheet for Comanche Peak

Response Team Quality Instruction For Issue Specific Action

Plan VII.B.2

(1pg)

--

'

. ........ - .

_

m;_2:::ELMR.5?rT:::~t*: .

"'tz:itzenuw::.:ac ^=.:.. cMt;tqy

,

-;

. . -

c.

..

Re:

F01A-86-36

.

APPENDIX A

(Continued)

13. 8/16/85

Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CATY-004

(1pg)

14. 8/19/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-045

(3pgs)

15. 8/19/85

Facsimile Transmittal form, Poslusny to Westerman w/att,

copies of hearing transcripts out of context (18pgs)

16. 8/21/85

Handwritten note from Streeter to John Honekamp 8 site

w/ cover (2pgs)-

-

17. 8/30/85

Inspection witness sheet,' package no. I-S-SBPS-019

(1pg)

18. 8/30

Witnessed Inspections, Small Bore Pipe Supports VII.c (1pg)

19. 9/85

QI-008, Rev. 1 closeout in Activity Rpt for Sept 1985 (1pg)

20. 9/3/85

NRC Witness Inspection sheets, various dates from 9/3/85

through 9/27/85 (21pgs)

k' 21. '9/5/85

Handwritten note re I-E-CABL-004

(1pg)

-

22. 9/5/85

Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-004

.

(1pg)

"

23. 9/6/85.

Reinspection sheet, ISAP No. VII.c, Verif Pkg I-E-CABL-007

(2pgs)

24. 9/6/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CABL-030

(1pg)

25. 9/10/85

Witness inspection Pkg No. I-S-SBPS-038

(1pg)

26. 9/11/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CATY-129

(3pgs)

27. 9/11/85

Reinspection shee't, ISAP No. VII.c Verif Pkg I-E-EEIN-1

(2pgs)

28. 9/11/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-005

(2pgs)

---

. . , .

n_

~

w

~ ~ n

m,

~

,

e sn.x.u.u z.;;; a .x;;,. m m x , u ,

,

.

.,

..

RE: F0!A-86-36

APPENDIX A

(Continued)

29.- 9/11/85

Reinspection sheet. ISAP VII.c Verif~Pkg I-E-EEIN-052

(1pg)

30. 9/12/85

Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-035

(I S)

P

.

31'

9/12/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-016

.

(2pgs)

.32.

9/12/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-ININ-060

(2pgs)

33. 9/12/85-

witness inspection sheet 'Pkg No. CC-1-SB-043-009-3

(1pg)

34.

9/13/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-45

(1pg only)

35.

9/13/85

Reinspection sheet. ISAP'No. VII.c Verif Pkg I-E-EEIN-24

(3pgs)

436.

9/16/85

Ob.servations Log - Input

ISAP No. V.a Verif Pkg CC-2-028-414-S33R

8. . ;

,

- 37. '9/16/85

Observations Log - Followup

(ipg)

-

38.

8/8/85

Drawing, CC-2-028-414-S33R (1pg)

39.-

9/16/85

Observations Log - Input ISAP No. V.d

Verif Pkg CT-2-004-407-S32A

(1pg)

40.

9/16/85

Observations Log - Followup (1pg)

41.-

9/16/85

Observations Log - Input ISAP No. V.d

Verif Pkg FSE-00159,

sheet 10403, Rev. 2 (1pg)

42.

9'/16/85

Observations Log - Followup (1pg)

43.

9/16/85

Observations Log - Input ISAP No. V.d

Verif Pkg FSE-159-10471

Rev. 1

(1pg)

44. - 9/16/85

Observations Log - Followup (1pg)

'

.C3.

9/17/85

Observations Log - Input ISAP No. V.d Verif Pkg FSE-00159-2630

(1pg)

C3.

9/17/85

Observations Log - Followup (2pgs)

47.

9/17/85

Observations Log - Input ISAP NO. V.d Verif Pkg FSE-00159-4023/

-4039

(1p'g)

(

. att, observation log - follow up (not completed) (ipg

,

h

,__~._.n.~,.

,~g.,_..-..---~

~~

-n- _ .,_ m.m

.

Ra: FOIA-86-36

.-

.

APPENDIX A

(Continued)

C.

9/6/85

Independent-inspection sheet, R.W. Bonnenberg, Cable Spread

Roon (1pg)

49.: 9/17/85

Observations Log - Input ISAP No. VII.c Verif Pkg None

(1pg) Observations 1,og - Followup (not completed) '(1pg)

50. .9/13/85

-CPRT - Issue Specific Action Plans, V.a. V.d. V.e, VI.b

(1pg)

51. 9/16/85

. Observations Log - Input ISAP No. V.d' Verif Pkg CV-1-008-716-

'

A45C (1pg)

.

,

52. 9/16/85

Observations Log - Followup (1pg) w/ drawing (1pg)'

53. 9/20/85

Observations Log - Input liiAP No. V.d

Verif Pkg SF-X-055-

003-F45R (1pg)

54. 9/20/85

Observations Log - Fo110wup (1pg)

55.

9/16/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-012

(1pg)

56. -9/16/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-EEIN-003

P

(1pg)

.

57.

9/16/85

Reinspection sheet. ISAP No. VII.c Verif Pkg'I-E-EEIN-039

(Ipg)

58.z 9/16/85

Reinspectio'ti sheet, ISAP No. VII.c Verif Pkg I-E-CNT-077

(1pg)

59.

9/16/85

Witnessfinspectionsheet, Pkg No. I-S-CONC-12

(1pg)

~

60.. 9/16/85

witness'; Inspection sheet, Pkg No. I-S-CONC-08

(1pg)

61..

9/17/85

Witness %nspectionsheet, Pkg No. I-S-CONC-47 (1pg)

62.

9/17/85

Witnessinspectionsheet, ISAP No. VII.c Verif Pkg I-E-EEIN-29

(2pgs)

63.

9/17/85~

Witness reinspection sheet, ISAP No. VII.c Verif Pkg

I-E-EEIN-42

(2pgs).

64. < 9/18/85

Witness reinspection sheet, Pkg No. I-S-CONC-06

(1pg)

65.

9/18/85

Reinspection sheet. ISAP No. VII.c Verif Pkg I-E-CDUT-076

(1pg)

.

M

v

-

,

'

,;,.

R2: F0!A-86-36

'

..

APPEN9IX A

,

(Continued)

-

,

66.

9/18/85

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-027

(?pgs).

. 67.-

9/18/85

Reinspection sheet, ISAP NO. VII.'c .Verif Pkg I-E-CDUT-044

(1pg)

68. ~9/20/85

Witness inspection sheet, Pkg No. I-S-CONC-41

(1pg)

69..

9/23/85'

Witness inspection sheet, Pkg No. I-S-CONC-52

(1pg)

70.'

9/23/85'

Reinspection sheet, ISAP No. VII.c Verif Pkg I-E-CDUT-080

(1pg)

7 '. .

9/26/85

Witness inspection sheet, Pkg No. I-S-LINR-51

(1pg)

1

72.

9/26/85

Witness inspection sheet, Pkg No. I-S-LINR-06

(1pg)

-- 73.

9/27/85'

Witness inspection sheet, Pkg No. I-S-LINR-55

(1pg)

.74.

9/27/85

Witness inspection sheet..Pkg No. I-S-LINR-21

(1pg)

75 - 9/77/85

Witness inspection sheet, Pkg No. I-S-LINR-13

(1pg)

76. undated

~SSER, IIe,' Allegation category: Civil and Structural 15,

f)

Rebar Improperly Drilled (5 pages).

77. 8/15/85-

PlugWelds, units 1and2,Pipesupports(12pages).

-,

t

a

h

t