{{#Wiki_filter:-
{{#Wiki_filter:ID DOCKET NUMBER N I@_
                                                                                                      ~
~
ID i                                    DOCKET PROPOSED RULENUMBER N I@_
i PROPOSED RULE (63 FK ll95)
(63 FK ll95)                       .
May 3f,cw c.
May 3f,cw ';
c.
18 Lorenzo Circle Methuen, MA 01844
18 Lorenzo Circle Methuen, MA 01844
                                                                '88 JM -3 P2 :19 0FFICL <
'88 JM -3 P2 :19 0FFICL <
* S a. tan r 00CKEllNG & HHVlCC Secretary of the Commission                                     BR ANCH Attn Docketing and Service Branch U.S Nuclear Regulatory Commission Washington, D.C. 20555
* S a. tan r 00CKEllNG & HHVlCC Secretary of the Commission BR ANCH Attn Docketing and Service Branch U.S Nuclear Regulatory Commission Washington, D.C. 20555


==Dear Sirs:==
==Dear Sirs:==
The U.S Nuclear Regulatory Commission (NRC) is proposing a change to the licensing requirements for a new nuclear plant. This change in policy states that off-site emergency sirens need not be in place when a plant is being tested for a short time by operating at less than 5 percent capacity.
The U.S Nuclear Regulatory Commission (NRC) is proposing a change to the licensing requirements for a new nuclear plant. This change in policy states that off-site emergency sirens need not be in place when a plant is being tested for a short time by operating at less than 5 percent capacity.
This is a sensible change in policy and I believe it is important to New England's energy supply picture. Low-power testing is the next step in realizing the Seabrook Station's full potential. New England needs all the power it can generate. Seabrook is built and ready to begin to add a critical boost to the area's reliable power supply.
This is a sensible change in policy and I believe it is important to New England's energy supply picture.
Low-power testing is the next step in realizing the Seabrook Station's full potential.
New England needs all the power it can generate.
Seabrook is built and ready to begin to add a critical boost to the area's reliable power supply.
Please approve this policy change.
Please approve this policy change.
Respectfully, 3 -
Respectfully, 3 -
ANTHONY V. DI PIETRO 4
ANTHONY V. DI PIETRO 4
e               E  q
e
_s f e pq o pc-* , ;d eb' 20'''
_s f e E
8806140171 880531                                             }'     _ _ _ _ . _ _ _ . -
q pq pc-*, ;d eb' 20'''
enn                                             _-                                              .
o 8806140171 880531
enagg13433                                                                                              -
}'
                                                  -}}
enagg13433 enn
-}}

Latest revision as of 23:10, 10 December 2024

Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations.Low Power Testing Next Step in Realizing Seabrook Full Potential
ML20155C355
Person / Time
Site: Seabrook  
Issue date: 05/31/1988
From: Di Pietro A
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-00118, 53FR16435-118, NUDOCS 8806140171
Download: ML20155C355 (1)


Text

ID DOCKET NUMBER N I@_

~

i PROPOSED RULE (63 FK ll95)

May 3f,cw c.

18 Lorenzo Circle Methuen, MA 01844

'88 JM -3 P2 :19 0FFICL <

  • S a. tan r 00CKEllNG & HHVlCC Secretary of the Commission BR ANCH Attn Docketing and Service Branch U.S Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sirs:

The U.S Nuclear Regulatory Commission (NRC) is proposing a change to the licensing requirements for a new nuclear plant. This change in policy states that off-site emergency sirens need not be in place when a plant is being tested for a short time by operating at less than 5 percent capacity.

This is a sensible change in policy and I believe it is important to New England's energy supply picture.

Low-power testing is the next step in realizing the Seabrook Station's full potential.

New England needs all the power it can generate.

Seabrook is built and ready to begin to add a critical boost to the area's reliable power supply.

Please approve this policy change.

Respectfully, 3 -

ANTHONY V. DI PIETRO 4

e

_s f e E

q pq pc-*, ;d eb' 20

o 8806140171 880531

}'

enagg13433 enn

-