ENS 54986: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = GE-6 | | utype = GE-6 | ||
| cfr = 10 CFR 50.72(b)(2)(iv)(B) | | cfr = 10 CFR 50.72(b)(2)(iv)(B) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 11/06/2020 05:00 | | notification date = 11/06/2020 05:00 | ||
| notification by = Jason Overcash | | notification by = Jason Overcash | ||
Line 18: | Line 18: | ||
| title = Automatic Reactor Scram Due to Turbine/Generator Trip | | title = Automatic Reactor Scram Due to Turbine/Generator Trip | ||
| event text = On November 6, 2020, at 0239 CST, Grand Gulf Nuclear Station (GGNS) experienced an Automatic Reactor Scram from 84 percent Reactor Power after a Main Turbine and Generator Trip. | | event text = On November 6, 2020, at 0239 CST, Grand Gulf Nuclear Station (GGNS) experienced an Automatic Reactor Scram from 84 percent Reactor Power after a Main Turbine and Generator Trip. | ||
All control rods fully inserted and there were no complications. All systems responded as designed. | All control rods fully inserted and there were no complications. All systems responded as designed. | ||
Reactor pressure is being maintained with Main Turbine Bypass Valves. Reactor water level is being maintained in normal band with the condensate system. | Reactor pressure is being maintained with Main Turbine Bypass Valves. Reactor water level is being maintained in normal band with the condensate system. | ||
Line 25: | Line 24: | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201109en.html#en54986 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201109en.html#en54986 | ||
}}{{unit info | }}{{unit info | ||
| Unit = | | Unit = 1 | ||
| type = | | type = GE-6 | ||
| Scram code = | | Scram code = A/R | ||
| Reactor critical = | | Reactor critical = Y | ||
| Initial power = | | Initial power = 84 | ||
| Initial reactor mode = | | Initial reactor mode = Power Operation | ||
| Current power = | | Current power = 0 | ||
| Current reactor mode = | | Current reactor mode = Hot Shutdown | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Revision as of 11:03, 15 January 2021
Where | |
---|---|
Grand Gulf Mississippi (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-3.65 h-0.152 days <br />-0.0217 weeks <br />-0.005 months <br />) | |
Opened: | Jason Overcash 05:00 Nov 6, 2020 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Nov 6, 2020 |
54986 - NRC Website
| |