  - CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCGUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meetinC conducted at your request in the NRC Region !! office on August 10, 1988. This was a management meeting to discuss your plant performance and improvement programs. A list of attendees, a brief suntiary and a copy of your handout are enclosed.
  - CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCGUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meetinC conducted at your request in the NRC Region !! office on August 10, 1988.
This was a management meeting to discuss your plant performance and improvement programs. A list of attendees, a brief suntiary and a copy of your handout are enclosed.
It is our opinion that this meeting was beneficial, and provided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire, in accordance with Section 2.790 of de NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
It is our opinion that this meeting was beneficial, and provided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire, in accordance with Section 2.790 of de NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, Q,uc>,   dU    L W
Sincerely, dU Q,uc>,
W L
Luis A. Reyes, Director Division of Reactor Projects
Luis A. Reyes, Director Division of Reactor Projects


==Enclosures:==
==Enclosures:==
    @*^ I' s-     E ^" b
@*^ I' s-E ^" b 1.
: 1. Meeting Summary
Meeting Summary 2.
: 2. Meeting Attendees -
Meeting Attendees -
: 3. Duke Power Company Handout - McGuira Nuclear Station 4     Duke Power Company Handout - Cetawba Nuclear Station cc w/encis:     (See page 2) h 91901 m 800 06                                                                       i hp     ADOCK O5000369                                                               I   I PNu                                                             _    ,
3.
3 L- Y >
Duke Power Company Handout - McGuira Nuclear Station 4
Duke Power Company Handout - Cetawba Nuclear Station cc w/encis:
(See page 2) h 91901 m 800 06 hp ADOCK O5000369 I I i
PNu 3 L-Y >


Duke Power Company                       2 0 48 cc w/encis:
0 48 Duke Power Company 2
cc w/encis:
T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire bec w/encls:
T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire bec w/encls:
NRC Resident Inspectors DRS, Technical Assistant D. Hood, NRR K. Jabbour, NRR Document Control Desk State of South Carolina Ri!    e        R!l         RII ser      h     es    VBr   lee
NRC Resident Inspectors DRS, Technical Assistant D. Hood, NRR K. Jabbour, NRR Document Control Desk State of South Carolina R!l RII Ri!
                ."p/A/88            4
e h
                                        /1./88   j/ g/88
VBr lee es ser
/1./88 j/ g/88
."p/A/88 4


ENCLOSURE 1 MEETING  
ENCLOSURE 1 MEETING  


==SUMMARY==
==SUMMARY==
 
Licensee: Duke Power Company Facilities: Catawba and McGuire Docket Nos.:
Licensee: Duke Power Company Facilities: Catawba and McGuire Docket Nos.:   50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region 11 office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.
50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region 11 office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.
J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.
J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.
H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.
H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.
T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness, security,   engineer-ing/ technical support, and operator training and safety assessment /qualitj                                         ,
T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness,
verification,                                                                                                       t T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the arcas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness, security, engineerir.9/ technical support and safety assessment / quality                                           .
: security, engineer-ing/ technical support, and operator training and safety assessment /qualitj t
veiif, cation.
verification, T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the arcas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness, security, engineerir.9/ technical support and safety assessment / quality veiif, cation.
The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements. The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.                                         ,
The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements.
The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.
I I
I I
l
l
Line 61: Line 70:
H. B. Tucker, Vice president Nuclear Production, DPC T. McConnell, McGuire, Station Mar.ager, DPC
H. B. Tucker, Vice president Nuclear Production, DPC T. McConnell, McGuire, Station Mar.ager, DPC


          '      6 o                             UNITED STATES
6 o
*        [p2 Clo ,#'o,*                 NUCLEAR REGULATORY COMMISSION
UNITED STATES
      $'                                            R EGl*N 11 a' *      #f. o                   101 MARIETTA STREET N.W.
[p2 Clo,#'o,*
* ATL ANTA. GEORGI A 30323 t,;*s.s
NUCLEAR REGULATORY COMMISSION a' *
                      ,/
#f.
R EGl*N 11 o
101 MARIETTA STREET N.W.
ATL ANTA. GEORGI A 30323 t,;*s.s,/
SEP 00 8)a8 Docket Nos. 50-369, 50-370 50-413, 50-414 License Nos. NPF-9, NPF-17 NPF-35, NPF-52 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SEP 00 8)a8 Docket Nos. 50-369, 50-370 50-413, 50-414 License Nos. NPF-9, NPF-17 NPF-35, NPF-52 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:


Line 72: Line 84:


==SUMMARY==
==SUMMARY==
  < CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCOUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meeting conducted at your request in the NRC Region !! Office on August 10, 1988. This was a management meeting to discuss your plant performance and improvement programs. A list of attendees, a brief summary and a copy of your handout are enclosed.
  < CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCOUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meeting conducted at your request in the NRC Region !! Office on August 10, 1988.
This was a management meeting to discuss your plant performance and improvement programs.
A list of attendees, a brief summary and a copy of your handout are enclosed.
it is our opinion that this meeting was beneficial, and piovided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire.
it is our opinion that this meeting was beneficial, and piovided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10. Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the MC Public Document Room.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10. Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the MC Public Document Room.
Should ycu have any questions concerning this matter, we will be pleased to discuss them.
Should ycu have any questions concerning this matter, we will be pleased to discuss them.
Sincerely,
Sincerely,
                                                                      / SG Luis A. Reyes, Director Division of Reactor Projects
/
SG Luis A. Reyes, Director Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1.     Meeting Sumary
1.
: 2.     Meeting Attendees -
Meeting Sumary 2.
: 3.     Duke Power Company Handout - McGuire Nuclear Station 4       Duke Power Company Handout - Catawba Nuclear Station cc w/encis:     (See page 2)
Meeting Attendees -
3.
Duke Power Company Handout - McGuire Nuclear Station 4
Duke Power Company Handout - Catawba Nuclear Station cc w/encis:
(See page 2)
V
V


            ,      6 O
6 O
Duke Power Company                     2 SEP v 9 ..
Duke Power Company 2
SEP v 9..
cc w/encls:
cc w/encls:
T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire r
T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire
!r


O.
O.
Line 94: Line 115:


==SUMMARY==
==SUMMARY==
 
Licensee: Duke Power Company Facilities:
Licensee: Duke Power Company Facilities: Catawba and McGuire Docket Nos.: 50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region !! office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.
Catawba and McGuire Docket Nos.:
50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region !! office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.
J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.
J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.
H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.
H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.
T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency   preparedness, security, engineer-ing/ technical support, and operator training and safety assessment / quality verification.
T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness,
: security, engineer-ing/ technical support, and operator training and safety assessment / quality verification.
T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, m rgency preperedness, security, engineering / technical support and safety assessment / quality verification.
T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, m rgency preperedness, security, engineering / technical support and safety assessment / quality verification.
The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements. The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.
The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements.
The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.


ENCLOSURE 2 MEETING ATTENDEES l       W. T. Orders, Nuclear Regulatory Commission (NRC), Senior Resident, McGuire P. K. VanDoorn, NRC, Senior Resident Inspector, Catawba M. S. Lesser, NRC, Resident Inspector, Catawba T. A. Peebles, NRC, Section Chief V. L. Brownlee, Branch Chief DRP, RII                                                                                         l C. W. Hehl Deputy Director Division of Reactor Projects J. Nelson Grace, Regional Aduinistrator G. C. Lainas, NRC/NRR, DRP E. W. Merschoff, Director, Division of Reactor Safety D. B. Matthews, Director, PDII-3, NRR D. Hood, Project Manager, PDII-3, NRR K. N. Jabbour, Catawba Project Manager, NRR J. P. Stohr, Director, Division of Reactor Safety and Safeguards (DRSS)
ENCLOSURE 2 MEETING ATTENDEES l
F. Jape. Technical Support Staf, DRS T. Owen, Catawba, Station Manager Duke Power Company (DPC) 1        H. B. Tucker, Vice president Nuclear Production, DPC T. McConnell, McGuire, Station Manager, DPC
W. T. Orders, Nuclear Regulatory Commission (NRC), Senior Resident, McGuire P. K. VanDoorn, NRC, Senior Resident Inspector, Catawba M. S. Lesser, NRC, Resident Inspector, Catawba T. A. Peebles, NRC, Section Chief V. L. Brownlee, Branch Chief DRP, RII l
>                                                                                                                                      i i
C. W. Hehl Deputy Director Division of Reactor Projects J. Nelson Grace, Regional Aduinistrator G. C. Lainas, NRC/NRR, DRP E. W. Merschoff, Director, Division of Reactor Safety D. B. Matthews, Director, PDII-3, NRR D. Hood, Project Manager, PDII-3, NRR K. N. Jabbour, Catawba Project Manager, NRR J. P. Stohr, Director, Division of Reactor Safety and Safeguards (DRSS)
t I
F. Jape. Technical Support Staf, DRS T. Owen, Catawba, Station Manager Duke Power Company (DPC)
H. B. Tucker, Vice president Nuclear Production, DPC 1
T. McConnell, McGuire, Station Manager, DPC i
i t
I l
I i
l I
l I
i l
i i
I i
f
i f


ENCLOSURE 3 DUKE POWER COMPANY HANDOUT MCGUIRE NUCLEAR STATION 1
ENCLOSURE 3 DUKE POWER COMPANY HANDOUT MCGUIRE NUCLEAR STATION 1
l
l


  ,.                      ,a                                           ,
,a McGUlRE NUCLEAR STATION 1.
McGUlRE NUCLEAR STATION
PLANT OPERATIONS STRENGTHS:
: 1.                                       PLANT OPERATIONS STRENGTHS:
Longer runs and improved capacity factors Use of SRO in integrated Scheduling to minimize operability conflicts improved daily operating schedules e
* Longer runs and improved capacity factors
Daily management plant status meetir.2s Decreased number of violations from 9 Level 4 in previous SALP period to 1 Level 3 and 1 Level 4 in most recent SALP period No operator error induced reactor trips in 3 years implemented tagging / labeling program for equipment and e
* Use of SRO in integrated Scheduling to minimize operability conflicts e    improved daily operating schedules
components - noticeable absence of wrong unit / wrong train events in 1988 Improved housekeeping / cleanliness in all areas Control room upgrade in progress - will improve working conJitions and standardize control room indications Control of materials / loose objects in containment l
* Daily management plant status meetir.2s                                                                     ;
Use of plant deficiency tags to identify deficiencies and follow up actions Developed McGuire Management Council Developing international interface (Russia / Cuba / France)
* Decreased number of violations from 9 Level 4 in previous                                                   ,
SALP period to 1 Level 3 and 1 Level 4 in most recent SALP period
* No operator error induced reactor trips in 3 years e    implemented tagging / labeling program for equipment and components - noticeable absence of wrong unit / wrong train                                                 ,
events in 1988                                                                                             (
* Improved housekeeping / cleanliness in all areas
* Control room upgrade in progress - will improve working conJitions and standardize control room indications                                                         ;
* Control of materials / loose objects in containment                                                         l
* Use of plant deficiency tags to identify deficiencies and follow up actions
* Developed McGuire Management Council                                                                       ;
* Developing international interface (Russia / Cuba / France)                                                 !
FIRE PROTECTION:
FIRE PROTECTION:
* Reliability enhancements to fire protection procedures i
Reliability enhancements to fire protection procedures Ongol:tg review / upgrade of fire protection equipment pts i
* Ongol:tg review / upgrade of fire protection equipment pts l
l Improved organization / training of plant fire brigade
* Improved organization / training of plant fire brigade


O e
O e
* Thorough, technical Duka Power QA fire protection audits have been performed and Identified items for improvement that have been completed CONCERNS /lNITIATIVES:
Thorough, technical Duka Power QA fire protection audits have been performed and Identified items for improvement that have been completed CONCERNS /lNITIATIVES:
x Operations / Maintenance work control practices and plant status knowledge needs improvement Project /2 schedule improvement allows every work activity to be updated daily.                                                                     It produces individual crew schedules to allow better planning and prioritization of work. This provides a more accurate status of work completion and ensures controlled entry into various T. S. modes.
x Operations / Maintenance work control practices and plant status knowledge needs improvement Project /2 schedule improvement allows every work activity to be updated daily.
Plant management emphasis on improving root cause analysis of all plant events should improve our performance here. We are pressing accountability for this analysis to lower levels in the organizational and to less significant events.
It produces individual crew schedules to allow better planning and prioritization of work.
X   Unplanned reactor trips and associated ESF actuations are trending upward.
This provides a more accurate status of work completion and ensures controlled entry into various T. S. modes.
Two-thirds of all recent reactor trips are caused by equipment failures. When a piece of equipment falls when tested, it is trended and analyzed under the new Test Failure Analysis Program.                                                                           This program includes an equipment history review and a root cause analysis.
Plant management emphasis on improving root cause analysis of all plant events should improve our performance here.
System Experts are begl~nning to analyze equipment failures not associated with test failures,                                                                           in addition a PM-2 program for predictive maintenance is being                                                                                 i utilized more extensively now.
We are pressing accountability for this analysis to lower levels in the organizational and to less significant events.
X Unplanned reactor trips and associated ESF actuations are trending upward.
Two-thirds of all recent reactor trips are caused by equipment failures.
When a piece of equipment falls when tested, it is trended and analyzed under the new Test Failure Analysis Program.
This program includes an equipment history review and a root cause analysis.
System Experts are begl~nning to analyze equipment failures not associated with test failures, in addition a PM-2 program for predictive maintenance is being i
utilized more extensively now.
4 f
4 f
* Increased number of violations due to procedural non-compliance Violations are occurring due to inadequate procedures and a lack of strict adherence to procedures. Measures which have been taken which should improve our performance here:
 
(A)     Clarified Independent Verification procedure and covered it in requal training.
Increased number of violations due to procedural non-compliance Violations are occurring due to inadequate procedures and a lack of strict adherence to procedures.
(B)     Clarified Tagout/ Removal and Restoration procedure and covered it in requal training.
Measures which have been taken which should improve our performance here:
(C)     All sections are pursuing procedure upgrade programs.
(A)
(D)     Line/ staff communications were held with station personnel to emphasize procedural adherence / procedural adequacy.
Clarified Independent Verification procedure and covered it in requal training.
(E)     Superintendents stress procedural adherence through section head meetings to maintain a heightened awareness.
(B)
(F)   A station newsletter article, "Procedures are not Suggestions or Guidelines" by the Station Manage. was recently issued to employees (Refer to Attachment A).
Clarified Tagout/ Removal and Restoration procedure and covered it in requal training.
(G)   G.O. Licensing Group reviewed all incidents dealing with personnel error for trends,     it was recommended that supervisors need to follow up on personnel errors to determine contributing factors or extenuating circumstances, if any, for the error.
(C)
* i l
All sections are pursuing procedure upgrade programs.
1 l
(D)
Emphasis on better root cause analysis should help resolve thin (Refer to Attachment B). l (H) The Operating Excerience Management and Analysis (OEMA) function in our General Office was recently requested to review incidents from the past two years dealing with procedural adherence to determine any underlying causes for deviation. It was determined that corrective actions for past incidents may have been too confined to a specific work group and that administrative deficiencies associated with procedural adherence should be better identified in the investigations. The report is currently under review (Refer to Attachment C).
Line/ staff communications were held with station personnel to emphasize procedural adherence / procedural adequacy.
(1) McGuire Operations personnel recently participated in the development of an Operations' "Commitment to Excellence" which is a professional code of conduct (Refer to Attachment 0).
(E)
Superintendents stress procedural adherence through section head meetings to maintain a heightened awareness.
(F)
A station newsletter article, "Procedures are not Suggestions or Guidelines" by the Station Manage. was recently issued to employees (Refer to Attachment A).
(G)
G.O.
Licensing Group reviewed all incidents dealing with personnel error for trends, it was recommended that supervisors need to follow up on personnel errors to determine contributing factors or extenuating circumstances, if any, for the error.
i l
Emphasis on better root cause analysis should help resolve thin (Refer to Attachment B).
(H)
The Operating Excerience Management and Analysis (OEMA) function in our General Office was recently requested to review incidents from the past two years dealing with procedural adherence to determine any underlying causes for deviation.
It was determined that corrective actions for past incidents may have been too confined to a specific work group and that administrative deficiencies associated with procedural adherence should be better identified in the investigations.
The report is currently under review (Refer to Attachment C).
(1)
McGuire Operations personnel recently participated in the development of an Operations' "Commitment to Excellence" which is a professional code of conduct (Refer to ).
4
4


a
I a
                  .                                                                                I t
t 11.
: 11. RADIOLOGICAL CONTROLS STRENGTHS
RADIOLOGICAL CONTROLS STRENGTHS Catch / containment leak control program has reduced leaks and contamination Improved outage support due to improved job pre-planning and more efficient use of technicians Reduction in personnel contaminations Eliminated contract HP techs for routine work Dosimetry system accredited by the National Voluntary Accreditation Program 4
* Catch / containment leak control program has reduced leaks and contamination
l Reduction in number of NRC violations from 8 in previous SALP period to 1 in most recent SALP period 94% free access to the Auxiliary Sullding CONCERNS / INITIATIVES X
* Improved outage support due to improved job pre-planning and more efficient use of technicians
Radwaste volume generated exceeds national average i
* Reduction in personnel contaminations
}
* Eliminated contract HP techs for routine work
A trash segregating and sorting system was implemented i
* Dosimetry system accredited by the National Voluntary 4                                      Accreditation Program
in December to reduce the volume of compacted clean trash.
* Reduction in number of NRC violations from 8 in previous l
i Radwaste volume reduction working group studied this concern, made recommendations to management and several j
SALP period to 1 in most recent SALP period
improvements have been or are being implemented.
* 94% free access to the Auxiliary Sullding CONCERNS / INITIATIVES X     Radwaste volume generated exceeds national average i
}                                         A trash segregating and sorting system was implemented i
in December to reduce the volume of compacted clean i                                        trash.
;                                        Radwaste volume reduction working group studied this concern, made recommendations to management and several j                                         improvements have been or are being implemented.
Upgraded shredder / compactor equipment has been purchased which will further reduce radwaste volumes.
Upgraded shredder / compactor equipment has been purchased which will further reduce radwaste volumes.
* Cumulative dose exposure exceeds national average i
Cumulative dose exposure exceeds national average i
There has been a reduction in cumulative dose for non-outage work. However, the major source of exposure i                                        was work associated with refueling and maintenance l
There has been a reduction in cumulative dose for non-outage work.
However, the major source of exposure was work associated with refueling and maintenance i
l,
1
1


outages. A4 loop Westinghouse / ice condenser plant has more maintenance requirements than those used to calculate the national average. Efforts to increase     S/G life and remove the RTO bypass system have resulted in high doses. All radiation exposure jobs were assigned to groups in the station for detailed ALARA planning, resulting in much more detailed ALARA plans.     The initial results look good. A major management initiative has been taken to transfer more dose accountability to craft worker and supervision and away from HP.
outages.
Increased level of management involvement and membership l
A4 loop Westinghouse / ice condenser plant has more maintenance requirements than those used to calculate the national average.
on ALARA committee.
Efforts to increase S/G life and remove the RTO bypass system have resulted in high doses.
The accountabli     of ALARA planning responsibilities
All radiation exposure jobs were assigned to groups in the station for detailed ALARA planning, resulting in much more detailed ALARA plans.
!,                  between HP and Maintenance Planning is being clarified.
The initial results look good.
A major management initiative has been taken to transfer more dose accountability to craft worker and supervision and away from HP.
Increased level of management involvement and membership on ALARA committee.
l The accountabli of ALARA planning responsibilities between HP and Maintenance Planning is being clarified.
2 I
2 I
I i
I i
i t
i t
                                            .s.
.s.


ll1. MAINTENANCE /SURVElLLANCE STRENGTHS:
ll1. MAINTENANCE /SURVElLLANCE STRENGTHS:
* Increasing the use of system experts
Increasing the use of system experts Valve quality group performs quality inspections on valve repairs to improve quality of work and level of experience in the field A self assessment of maintenance program against INPO criteria has identified items for improvement that are being completed on a priority basis.
* Valve quality group performs quality inspections on valve repairs to improve quality of work and level of experience in the field
New vibration monitoring equipment has been purchased to expand our capacity to monitor vibration spectrum on rotating equipment Oil analysis program has been expanded to include many other pieces of equipment and allow for earlier detection 1
* A self assessment of maintenance program against INPO criteria has identified items for improvement that are being completed on a priority basis.
of component wear / failure Developing technology to test actuators on pneumatic valves leading industry /NRC efforts to define a viable process.
* New vibration monitoring equipment has been purchased to expand our capacity to monitor vibration spectrum on rotating equipment
Implemented test failure analysis / root cause program Improved daily operating schedules KC HX on line AP monitoring for enhanced operability l
* Oil analysis program has been expanded to include many other pieces of equipment and allow for earlier detection :
monitoring CONCERNS / INITIATIVES:
1 of component wear / failure
l x
* Developing technology to test actuators on pneumatic valves leading industry /NRC efforts to define a viable process.
increased number of violations due to procedural non-compliance from 8 in previous SALP period to 11 in current period initiatives taken under the Plant Operations category were station wide and apply to this concern as well. _
  !
* Implemented test failure analysis / root cause program
* Improved daily operating schedules l
* KC HX on line AP monitoring for enhanced operability monitoring CONCERNS / INITIATIVES:
l x   increased number of violations due to procedural           ;
non-compliance from 8 in previous SALP period to 11 in current period initiatives taken under the Plant Operations category were station wide and apply to this concern as well.


i                                   *                  *      -
i O
O
e t
* e                                                                   t O
O I
4                                                                                                                           I IV. EMERGENCY PREPAREDNESS STRENGTHS:
4 IV.
* Corrected siren activation problem with Mecklenburg County
EMERGENCY PREPAREDNESS STRENGTHS:
* NRC unannounced inspection in March with no findings No violations during SALP period
Corrected siren activation problem with Mecklenburg County NRC unannounced inspection in March with no findings No violations during SALP period Successful annual exercises (only 2 IFI's)
* Successful annual exercises (only 2 IFI's)
Developed new procedure for event classification to make more "user-friendly" CONCERNS / INITIATIVES:
* Developed new procedure for event classification to make more "user-friendly" CONCERNS / INITIATIVES:
e Current TSC facility is deficient j
e
Pursuing design / construction of new TSC facility to meet regulatory guidance criteria.
                                                              "  Current TSC facility is deficient                           j' Pursuing design / construction of new TSC facility to meet regulatory guidance criteria. Current schedule for completion is 1990.                                       <
Current schedule for completion is 1990.
t V. SECURITY STRENGTHS:
t V.
* A dedicated lAE crew (CMD) to maintain security systems
SECURITY STRENGTHS:
* Upgrade of security barrier sizes and design
A dedicated lAE crew (CMD) to maintain security systems Upgrade of security barrier sizes and design Replacement of outdated explosion detectors and electric locks CONCERNS / INITIATIVES X
* Replacement of outdated explosion detectors and electric locks CONCERNS / INITIATIVES X Replacement / repair of CCTV cameras (A)   CCTV cameras and monitors are belng replaced with state-of-art equipment.
Replacement / repair of CCTV cameras (A)
4 (B)   A temporary modification was implemented to correct the "wali effect". This was necessary due to the length of time required to design and upgrade the final modification which will be completed in mid-1989.
CCTV cameras and monitors are belng replaced with state-of-art equipment.
x Need to reduce the number of lost security badges and tailgating incidents.
(B)
A temporary modification was implemented to correct 4
the "wali effect".
This was necessary due to the length of time required to design and upgrade the final modification which will be completed in mid-1989.
x Need to reduce the number of lost security badges and tailgating incidents.
Site management from all groups is working together to establish a statement of value of adherence to these requirements with a consistent corrective discipline policy throughout the company including vendors.
Site management from all groups is working together to establish a statement of value of adherence to these requirements with a consistent corrective discipline policy throughout the company including vendors.
Daily updates are provided on the closed circuit TV system concerning numbers of security problems for tmployee awareness.
Daily updates are provided on the closed circuit TV system concerning numbers of security problems for tmployee awareness.
The General Employee Training video has been revised to stress the importance of security badge control.
The General Employee Training video has been revised to stress the importance of security badge control.
                                              .g.
.g.


o     ,
o c
c ,
6 l
6     *    *                                                            ,
l Data on events and groups involved is compiled, trended and provided to management for corrective action.
  .                                                                        l l
Data on events and groups involved is compiled, trended and provided to management for corrective action.
Neckstraps have been provided for more positive attachment of security badges.
Neckstraps have been provided for more positive attachment of security badges.
l l
l l
l 6 .    .      .
l 6.
VI. ENGINEERING / TECHNICAL SUPPORT STRENGTHS:
VI.
* Placement of a Design Engineering office on site has l
ENGINEERING / TECHNICAL SUPPORT STRENGTHS:
resulted in (A)   onsite problems resolution during installation of modifications                                             i (8)   onsite interpretation of design requirements / documents (C)   Increased involvement in long term rotential             i operability problems (i.e., NS HXs)
Placement of a Design Engineering office on site has l
(D)   Earlier DE involvement in station problems (i.e.,         '
resulted in (A) onsite problems resolution during installation of modifications i
(8) onsite interpretation of design requirements / documents i
(C)
Increased involvement in long term rotential operability problems (i.e., NS HXs)
(D)
Earlier DE involvement in station problems (i.e.,
resolution of errosion problems in S/G blowdown tank)
resolution of errosion problems in S/G blowdown tank)
(E)   More immediate design inspections for operating f
(E)
problems or modifications (i.e., damaged KC flex hose)                                                       ;
More immediate design inspections for operating f
(F)   Increased DE involvement and timeliness of               ;
problems or modifications (i.e., damaged KC flex hose)
operability reviews i
(F)
Topform program has increased quality of documentation and       f design reviews                                                   I
Increased DE involvement and timeliness of operability reviews i
* Topform program has increased the required interface with
Topform program has increased quality of documentation and f
e design reviews I
Topform program has increased the required interface with
[
[
the station to assure a clearer understanding of station problems                                                         j
the station to assure a clearer understanding of station problems j
* Decreased unnecessary modification paperwork by an improved root cause analysis of problems                         ;
Decreased unnecessary modification paperwork by an improved root cause analysis of problems I
I RefueIing                                 I i
RefueIing I
I
i I
* Very successful during last SALP period at planning               l refuelings and meeting outage schedules                           l l
Very successful during last SALP period at planning l
l
refuelings and meeting outage schedules l
[
l l
t
[ t 0
                                                            -      -- - -        . - - 0


o
o o
                ' o
o.
    .      o.
i 6
i 6
Operator Trainina
Operator Trainina New site specific simulator with state-of-art technology
* New site specific simulator with state-of-art technology
?
?
* Increased simulator training time from 20 hours (1987) to I
Increased simulator training time from 20 hours (1987) to I
40 hours (1988) and then to 50-60 hours (1989) i
40 hours (1988) and then to 50-60 hours (1989)
* Added designated simulator familiarization for non-licensed operators during requal training Implemented Training and Qualification guides and requal
Added designated simulator familiarization for i
,                      case studies
non-licensed operators during requal training Implemented Training and Qualification guides and requal case studies On-shift SRO's are now rotated through training instructor slots (4 total) a Recent INPO re-accreditation only identified two concerns, lowest to date on eleven visits
* On-shift SRO's are now rotated through training instructor slots (4 total) a
]
* Recent INPO re-accreditation only identified two concerns, lowest to date on eleven visits
CONCERNS /lNITIATIVES:
]                   CONCERNS /lNITIATIVES:
x Temporary modification program has had no design review in i
x Temporary modification program has had no design review in i                     the past.
the past.
l l
l l
3                         Methods to increase DE involvement in temporary l
3 Methods to increase DE involvement in temporary l
modification program to provide a more thorough review of adherence to design basis and safety concerns are l                         being investigated and will be implemented.
modification program to provide a more thorough review of adherence to design basis and safety concerns are l
being investigated and will be implemented.
X Rate of incidents and violations during refueling outages 1
X Rate of incidents and violations during refueling outages 1
is too high.
is too high.
l j                         Corrective actions yet to be identified. Outage critique and folicw-ups will help resolve this concern.
l j
Corrective actions yet to be identified.
Outage critique and folicw-ups will help resolve this concern.
1 t
1 t
Vll. SAFETY ASSESSMENT / QUALITY VERIFICATION STRENGTHS:
Vll. SAFETY ASSESSMENT / QUALITY VERIFICATION STRENGTHS:
* SITA audit on 0/G Auxiliary System
SITA audit on 0/G Auxiliary System Annual SITA audits on selected systems Thorough follow-up on known or potential safety concerns and industry events.
* Annual SITA audits on selected systems
Examples:
* Thorough follow-up on known or potential safety concerns and industry events. Examples:
(A)
(A) Passive civil features design study (B) Fisher valve evaluation (C) Missing Missile Shield Bolts (D) Bulletin on Surry's containment sump suction line cleanliness INITIATIVE:
Passive civil features design study (B)
We are placing more emphasis and efforts in improving communications with all NRC personnel,   it is our desire to be very open and responsive to all NRC concerns and provide timely and accurate information.
Fisher valve evaluation (C)
O
Missing Missile Shield Bolts (D)
* 8 ,, ,
Bulletin on Surry's containment sump suction line cleanliness INITIATIVE:
0 ENCLOSURE 4 DUKE POWER COMPANY HANDOUT CATAWBA NUCLEAR STATION
We are placing more emphasis and efforts in improving communications with all NRC personnel, it is our desire to be very open and responsive to all NRC concerns and provide timely and accurate information.
8,,
O 0
ENCLOSURE 4 DUKE POWER COMPANY HANDOUT CATAWBA NUCLEAR STATION


o       G .
o G
: 1. PLANT OPERATIONS Concerns
1.
: 1. Non-Conservative Approach to Tech Specs April 1987 Violation on Calibration of Power Range -
PLANT OPERATIONS Concerns 1.
(Performance Group)     (J. K. L. Q)
Non-Conservative Approach to Tech Specs April 1987 Violation on Calibration of Power Range -
(Performance Group)
(J. K. L. Q)
Pressurizer Safety Valve Position Indication -
Pressurizer Safety Valve Position Indication -
(Individual Supervisor)     (J. P. L)
(Individual Supervisor)
Auxiliary Feedwater Flow Control Valves - Positioning Above 10% Power - (G.O. Licensing)     (L. Q. K)
(J. P. L)
Channel Checks On Offscale Gauges - (Operations)     (L.R)
Auxiliary Feedwater Flow Control Valves - Positioning Above 10% Power - (G.O. Licensing)
(L. Q. K)
Channel Checks On Offscale Gauges - (Operations)
(L.R)
Containment Integrity - ASME vs. Tech Spec Requirements -
Containment Integrity - ASME vs. Tech Spec Requirements -
(G.O. Licensing) (L. J. Q. K. S. T)
(G.O. Licensing)
(L. J. Q. K. S. T)
ECCS Pump Venting - Question of Interpretation -
ECCS Pump Venting - Question of Interpretation -
(Industry Initiative To Remove This Spec Further Review By Ops & Station Manager.)
(Industry Initiative To Remove This Spec Further Review By Ops & Station Manager.)
Counterpoints Several Tech Spec Changes Are In Tc Correct Non-Conservative Or Incorrect Data. (Licensee Identified) E.G., Airlock Testing Pressure Have Numerous Existing Interpretations And Are Working To Improve The Manual To Assist In Tech Spec Compliance.
Counterpoints Several Tech Spec Changes Are In Tc Correct Non-Conservative Or Incorrect Data.
l                                           Catawba Is A Good Example Of A Non-Standard Plant Under Standard Tech Specs.
(Licensee Identified) E.G., Airlock Testing Pressure Have Numerous Existing Interpretations And Are Working To Improve The Manual To Assist In Tech Spec Compliance.
: 2. Back To Back Safety Iniections Unit 1   1-23-88 / Unit 2 2-9-E8 Personnel Error -
l Catawba Is A Good Example Of A Non-Standard Plant Under Standard Tech Specs.
Failure To Follow Procedures     (M. N. 0)
2.
: 3. Recent Unit 2 Reactor Trips Six Unit 2 Trips In Late May-June, 1988 Counterpoint: Only : Of The o Involved Personnel Error Or       i' Managenent Deficiency.
Back To Back Safety Iniections Unit 1 1-23-88 / Unit 2 2-9-E8 Personnel Error -
Failure To Follow Procedures (M. N. 0) 3.
Recent Unit 2 Reactor Trips Six Unit 2 Trips In Late May-June, 1988 Counterpoint: Only : Of The o Involved Personnel Error Or i
Managenent Deficiency.
The other 4 Were Equipment Problems or Undetermined.
The other 4 Were Equipment Problems or Undetermined.
10 Trips on Unit 2 In This SALP:
10 Trips on Unit 2 In This SALP:
5 Autenatic & 5 Manual 9 of The 10 Trips Involved Feedwater Transients 1 Of The 10 Trips Involved Personnel Error       l t
5 Autenatic & 5 Manual 9 of The 10 Trips Involved Feedwater Transients 1 Of The 10 Trips Involved Personnel Error l
t


i f*
i f*
Plant Operations (Continued)
Plant Operations (Continued)
Strengths and Initiatives
Strengths and Initiatives a.
: a. Long Unit 1 Run (144 Continuous Days) And > 90 % Capacity Factor At Start of Tube Leak Outage.
Long Unit 1 Run (144 Continuous Days) And > 90 % Capacity Factor At Start of Tube Leak Outage.
: b. NC Leakage Has Caused No Shutdowns In This SALP - Total Leakage Is Consistently < 1 GPM This Cycle - Each Unit.
b.
: c. ESF's Reduced:   33 In This SALP Versus 47 In 8/86-7/87 Period.
NC Leakage Has Caused No Shutdowns In This SALP - Total Leakage Is Consistently < 1 GPM This Cycle - Each Unit.
: d. Total Trips Heduced:     11 In This SALP Versus 15 In 8/86-7/87 Period.
c.
: e. Staff Developed A Professional Code of Conduct
ESF's Reduced:
: f. Unit 2 Steam Generator Level Modification in 1989 Refueling - Should Improve Situation On Teodwater Transients,
33 In This SALP Versus 47 In 8/86-7/87 Period.
: g. Daily Management Plant Status Meeting
d.
: h. Plant Labeling Program To Complete 6/89
Total Trips Heduced:
: 1. Improved Plant Housekeeping - Particulary Unit 2 J. Involvement of Compliance in Operability Decisions
11 In This SALP Versus 15 In 8/86-7/87 Period.
: k. Compliance Group Restructuring To Provide One or More SRO's In The Group
e.
: 1. Pro Active Tech Spec Review / Training Using Senior Management Person.
Staff Developed A Professional Code of Conduct f.
                                    -  Ops Instructors
Unit 2 Steam Generator Level Modification in 1989 Refueling - Should Improve Situation On Teodwater Transients, g.
                                    -  SRO's
Daily Management Plant Status Meeting h.
                                    -  Management               -
Plant Labeling Program To Complete 6/89 1.
Ops Audit
Improved Plant Housekeeping - Particulary Unit 2 J.
: m. Training By Section Heads To Supervisors And Crews Conducted In Operations. Performance.
Involvement of Compliance in Operability Decisions k.
Instrumentation And Electrical Construction Dept. On Procedure Use. IV. Personnel Error's,
Compliance Group Restructuring To Provide One or More SRO's In The Group 1.
: n. Station Manager Emphasizing The Need for Procedural Adherence And Understanding In Station Wide Letter. This Included IV.
Pro Active Tech Spec Review / Training Using Senior Management Person.
: o. Station Management Emphasizing The Importance Of Supervisory Involvement In The Plant With His Crew.
Ops Instructors SRO's Management Ops Audit m.
Training By Section Heads To Supervisors And Crews Conducted In Operations. Performance.
Instrumentation And Electrical Construction Dept. On Procedure Use. IV. Personnel Error's, n.
Station Manager Emphasizing The Need for Procedural Adherence And Understanding In Station Wide Letter.
This Included IV.
o.
Station Management Emphasizing The Importance Of Supervisory Involvement In The Plant With His Crew.


e Plant Operations (Continued)
e Plant Operations (Continued)
Strengths and initiativen
Strengths and initiativen p.
: p. Ops Supt. Or Station hgr. To Review All Compensatory Action Plans Before Iraplementation,
Ops Supt. Or Station hgr. To Review All Compensatory Action Plans Before Iraplementation, q.
: q. Wider Review Of Proposed Tech Spec Interpretations         ;
Wider Review Of Proposed Tech Spec Interpretations r.
: r. Review Of OEP's With Training Services Management
Review Of OEP's With Training Services Management s.
: s. System Expert Review Of Tech Spec Interpretations
System Expert Review Of Tech Spec Interpretations t.
: t. Strengthening Of The G.O. As A Focal Point For NRC Communicction
Strengthening Of The G.O. As A Focal Point For NRC Communicction u.
: u. Prioritizing Tech Spec Change Submittals Through G.O.
Prioritizing Tech Spec Change Submittals Through G.O.
Licensing To NRC I
Licensing To NRC I
i h
i h
t i
t i
t l
t l
l                                                                                         {
l
l                                                                                         !
{
l                                                                                         ,
l l
1                                                                                         l l                                                                                         i l
1 l
i
l i
                                                                                          'l l
l i
'l l
t l
t l
i f
i f
r
r n
                                                      - - ---.-,----- n -- -,, . - - . , -


fe
fe 2.
: 2. RADIOLOGICAL CONTROLS l
RADIOLOGICAL CONTROLS l
concerns                                                                                                                           ;
concerns Inadequate Frisking - 9/87 And 11/87 NRC Inspections Response /Followupt Specific Training Provided To All t
                                    .                Inadequate Frisking - 9/87 And 11/87 NRC Inspections                                                           !
Personnel On The Problem And Single Point RCA Access Point l
Response /Followupt       . Specific Training Provided To All                                               t Personnel On The Problem And                                                   ,
Established - Monitored By HF Hand And Foot Monitors i
                                                                              . Single Point RCA Access Point                                                   l' Established - Monitored By HF
Whole Body Monitors l>
,                                                                            . Hand And Foot Monitors                                                         !
HP Conducts Periodic Visual Surveillance l
i                                                                                                                                                               ,
  ;                                                                          . Whole Body Monitors                                                             !
l>
                                                                              . HP Conducts Periodic Visual Surveillance                                                                   l
                                      ~
i
i
:                                                                                  Management Surveillance - Continuing                                             l Program
~
  .l l
Management Surveillance - Continuing l
l
Program l
                                  .                Catawba Exposure Versus Industry Average                                                                       l l ..                                                         352 Person R M Per Unit Versus 3/1 Person Rem / Unit                                                 j i                                                             National Average                                                                                     }
.l l
j                                 Strennth/ Initiatives                                                                                                           (
Catawba Exposure Versus Industry Average l
)                                 .                Gansaa Spectroscopy Equipment Standardized                                                                     j
l..
                                  .                System Expert Established For MF's t                                                                                                                                                                 t
352 Person R M Per Unit Versus 3/1 Person Rem / Unit j
]                                 .                Trending of Information Tor Management                                                                           I
i National Average
                                  .                HP Self Appraisals 1
}
                                  .                Solid Waste Reduction - 255 Cubic Meters is The Stations 1988 Goal. To Date. 39 Cubic Meters Have Been Generated.                                                             L r
j Strennth/ Initiatives
S
(
:)                                                                                                                                                           f i   ,
)
r l
Gansaa Spectroscopy Equipment Standardized j
t f
System Expert Established For MF's t
l I
t
i 1
]
Trending of Information Tor Management I
HP Self Appraisals 1
Solid Waste Reduction - 255 Cubic Meters is The Stations 1988 Goal. To Date. 39 Cubic Meters Have Been Generated.
L r
S f
:)
i r
l t
f l
I i
1 l
l l
l l
l 1
1


      ;,j     ,  .
;,j A
A                                                                                              1
1 3.
: 3. MAINTENANCE / SURVEILLANCE Concerns:
MAINTENANCE / SURVEILLANCE Concerns:
                              . Clam Incident (Programmatic)
Clam Incident (Programmatic)
                              . S/G Loose Parts - Reportability Timeliness
S/G Loose Parts - Reportability Timeliness Maintenance Rule Making / Maintenance Improvement Strengths / Initiatives c
                              . Maintenance Rule Making / Maintenance Improvement c                            Strengths / Initiatives
Established Maintenance Engineering Services Group / Staffing a.
: a.                        . Established Maintenance Engineering Services Group / Staffing (Technical Support Program)
(Technical Support Program)
                              . E.itablished System Expert Program And Have Used It For D/G Problem, trd Clam Incident.
E.itablished System Expert Program And Have Used It For D/G Problem, trd Clam Incident.
                            .. P         Ai.. Goals For Reducing Work Request Backlog And PM/CM Rat
P Ai.. Goals For Reducing Work Request Backlog And PM/CM Rat
_tatus"
_tatus"
                                                    ~100 W.R.'s > 2 Years Old
~100 W.R.'s > 2 Years Old
                                                    ~200 W.R.'s > 1 Year Old 48.2% of Outstanding W.R.'s Are < 3 Mo. Old
~200 W.R.'s > 1 Year Old 48.2% of Outstanding W.R.'s Are < 3 Mo. Old Goala:
  ,                                      Goala:     0 W.R.'s > 3 Month Old
0 W.R.'s > 3 Month Old l
* l                                                    < 300 Total Non-Outage Outstanding Work 1
< 300 Total Non-Outage Outstanding Work 1
(By 12-31-88) 2
(By 12-31-88) 2 Recent Improvements In Violations Associated With Failuro To 1-Retest 1 Violation - 1985 1 Violation - 1986 3 Violation - 1987 1 Violation - 1988 Planning Organization - Traiaing, Single Pir ming Group Concept.
                            .      Recent Improvements In Violations Associated With Failuro To 1-Retest 1 Violation - 1985 1 Violation - 1986 3 Violation - 1987 1 Violation - 1988
~
,                          .      Planning Organization - Traiaing, Single Pir ming Group Concept.
            ~


    ,-______o
,-______o
              , ?
?
  , 7 4 EMERGENCY PREPAREDNESS
, 7 4
      ^
EMERGENCY PREPAREDNESS
Streneths/ Initiatives,
^
                                  . No Violations In This SALP As Compared To 2 In Previous SALP
Streneths/ Initiatives, No Violations In This SALP As Compared To 2 In Previous SALP Training Inprovements - Field Team Direction When In A Plume Uso Of Critical Parameters Monthly Drills / Exercises - Since Mid 1987
                                  . Training Inprovements - Field Team Direction When In A Plume
- Allows Use Of Alternates
,                                            Uso Of Critical Parameters
- Improves Response Skills
:                                  . Monthly Drills / Exercises - Since Mid 1987
- Heightens Interest / Involvement Mado ihe TSC A "Dedicated" Facility On 8-20-87
                                                                    - Allows Use Of Alternates
- Allows Quicker Activation TSC Now Automatically Activated i t Alert And Site Assembly Conducted
                                                                    - Improves Response Skills
- Cosmetic Improvements - Position Badges, Area Signs Enclosed Radio Area For HP
                                                                    - Heightens Interest / Involvement
- Packup Radio To NC/SC Hoved The OSC To A Larger Facility on 6-21-88
                                  . Mado ihe TSC A "Dedicated" Facility On 8-20-87
- Located Near The Single Point Access To RCA
                                                                    - Allows Quicker Activation TSC Now Automatically Activated i t Alert And Site Assembly Conducted
(
                                                                    - Cosmetic Improvements - Position Badges, Area Signs Enclosed Radio Area For HP
- Facility Is Dedicated
                                                                    - Packup Radio To NC/SC
- Addresses past NRC Concerns Emergency Vans
                                  . Hoved The OSC To A Larger Facility on 6-21-88
- Now are Marked As such
                                                                    - Located Near The Single Point Access To RCA
- Are Under The Station Emergency Preparedness Coordinators Control
(                                                               - Facility Is Dedicated
- Have Assigned Parking Near The Administration Building
                                                                    - Addresses past NRC Concerns
- Emergency Kits On-Board At All Times
                                  . Emergency Vans               - Now are Marked As such
- $30,000 Upgrade In Air Monitors EAL Review
                                                                    - Are Under The Station Emergency Preparedness Coordinators Control
- 3 Stations Reviewing For Consistency In Classifying Eients 4
                                                                    - Have Assigned Parking Near The Administration Building
- Review Will Include other Utilities EALs Additional Staffing
                                                                    - Emergency Kits On-Board At All Times
- 1 Additional Member Added To The Station Emergency Preparedness Staff In July, 1987.
                                                                    - $30,000 Upgrade In Air Monitors
                                  . EAL Review                   - 3 Stations Reviewing For 4
Consistency In Classifying Eients
                                                                    - Review Will Include other Utilities           ,
EALs
                                  . Additional Staffing           - 1 Additional Member Added To The Station Emergency Preparedness Staff In July, 1987.


,4, e.
,4, e.
S. SECURIT'l Concerns
S.
                                        . Lack Of Controls Over Safeguards Information
SECURIT'l Concerns Lack Of Controls Over Safeguards Information Operations / Security Interface In Establishing SSF Degraded Mode Tailgating Strengths / Initiatives A Design Study Of The PAP Has Improved Badge Control Enhancements To The Vital Barrier Are Being Made Thru The NSM Process.
                                        . Operations / Security Interface In Establishing SSF Degraded Mode
HVAC Mods Are Incorporating Barriers In The Ductwork (5/8" Rebar).
                                        . Tailgating Strengths / Initiatives
CCTV Upgrade In 1989 $300.000.
                                      . A Design Study Of The PAP Has Improved Badge Control
Reconfiguration Of The Fence Line. More Cameras And New Orientation.
                                      . Enhancements To The Vital Barrier Are Being Made Thru The NSM Process. HVAC Mods Are Incorporating Barriers In The Ductwork (5/8" Rebar).
Tactical Response Upgraded. Combat Training And Force In Force Issues To Be Addressed.
                                      . CCTV Upgrade In 1989 $300.000. Reconfiguration Of The Fence Line. More Cameras And New Orientation.
                                      . Tactical Response Upgraded. Combat Training And Force In Force Issues To Be Addressed.
(
(
L f
L f
Line 447: Line 503:


e e
e e
6   ENGINEERING / TECHNICAL SUPPORT Strengths And Initiatives Desian Engineerina Onsite Design Engineering Hns On-Site Office Established April, 1988.
6 ENGINEERING / TECHNICAL SUPPORT Strengths And Initiatives Desian Engineerina Onsite Design Engineering Hns On-Site Office Established April, 1988.
Use of TopForm During The Modification Program
Use of TopForm During The Modification Program This Interface Is Being used For Involvement In Daily Operations Operator Training Onsite Simulator Operational January, 1988 Will Increase Operators Simulator Times 20 Hours / Year 1987 50 Hours / Year 1988 On Shift SRO's Periodically Rotated Into One Of Four Training Insttvetor Slots NRC Exam Pass' Rate 9-86 And 9-87 100% Pass-Rate (26/26)
                          -    This Interface Is Being used For Involvement In Daily Operations Operator Training
Initial Hot License 20/21 Passed Total Rate To Date 46/37 EP's Revised To Include Human Factors And Have Been Verified / Validated On The Simulator.
                          -    Onsite Simulator Operational January, 1988 Will Increase Operators Simulator Times 20 Hours / Year     1987 50 Hours / Year     1988
Procedures Revised / Implemented 8-1-88.
                          -    On Shift SRO's Periodically Rotated Into One Of Four Training Insttvetor Slots NRC Exam Pass' Rate 9-86 And 9-87             100% Pass-Rate (26/26)
Refuelina Activities A S Year Outage Plan Established January 1988 Use of The Reactor Building Coordinator "P oject II" Computer Program Allows Rapid Development Of Ai, Outage Work Schedule. This Worked Well For The Present Unit 1 Tube Leak outage.
Initial Hot License       20/21 Passed Total Rate To Date       46/37 EP's Revised To Include Human Factors And Have Been Verified / Validated On The Simulator. Procedures Revised / Implemented 8-1-88.
Outage Logic Chart Improvements r
Refuelina Activities A S Year Outage Plan Established January 1988
                          -    Use of The Reactor Building Coordinator "P oject II" Computer Program Allows Rapid Development Of Ai, Outage Work Schedule. This Worked Well For The Present Unit 1 Tube Leak outage.
                          -    Outage Logic Chart Improvements r
s
s


.a t-
.a t-
              ~7. SAFETY ASSESSMENT / QUALITY VERIFICATION Concerns                                                         j i
~7.
: 1. Qualification Of The QA Staff
SAFETY ASSESSMENT / QUALITY VERIFICATION Concerns j
: 2. Quality Of Submittals Strengths / Initiatives
i 1.
                  . Station Performance Indicator Program
Qualification Of The QA Staff 2.
                  .-  Analysis Of ESF Events And Personnel Errors
Quality Of Submittals Strengths / Initiatives Station Performance Indicator Program Analysis Of ESF Events And Personnel Errors Followup On Bullentins, Generic Letters, f, : c.
                  . Followup On Bullentins, Generic Letters, f, : c .
- Fi her Valves
                            - Fi her Valves
- West Jersey Materials Passive Civil Features Design Study Reduction In Outstanding NRC Commitments (129 8-1-88 Ver.=us 195 8-1-87.)}}
                            - West Jersey Materials
                  . Passive Civil Features Design Study
                  . Reduction In Outstanding NRC Commitments (129 8-1-88 Ver.=us 195 8-1-87.)}}

Latest revision as of 01:02, 11 December 2024

Forwards Summary of 880810 Meeting W/Util at Region II Ofc Re Plant Performance & Improvement Programs.List of Attendees & Handout Also Encl
ML20154E904
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 09/06/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8809190180
Download: ML20154E904 (32)


Text

.

C SEp 06 d Docket Nos. 50-369, 50-370 50-413, 50-414 License Nos. NPF-9, NPF-17 NPF-35, NPF-52 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCGUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meetinC conducted at your request in the NRC Region !! office on August 10, 1988.

This was a management meeting to discuss your plant performance and improvement programs. A list of attendees, a brief suntiary and a copy of your handout are enclosed.

It is our opinion that this meeting was beneficial, and provided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire, in accordance with Section 2.790 of de NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, dU Q,uc>,

W L

Luis A. Reyes, Director Division of Reactor Projects

Enclosures:

@*^ I' s-E ^" b 1.

Meeting Summary 2.

Meeting Attendees -

3.

Duke Power Company Handout - McGuira Nuclear Station 4

Duke Power Company Handout - Cetawba Nuclear Station cc w/encis:

(See page 2) h 91901 m 800 06 hp ADOCK O5000369 I I i

PNu 3 L-Y >

0 48 Duke Power Company 2

cc w/encis:

T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire bec w/encls:

NRC Resident Inspectors DRS, Technical Assistant D. Hood, NRR K. Jabbour, NRR Document Control Desk State of South Carolina R!l RII Ri!

e h

VBr lee es ser

/1./88 j/ g/88

."p/A/88 4

ENCLOSURE 1 MEETING

SUMMARY

Licensee: Duke Power Company Facilities: Catawba and McGuire Docket Nos.:

50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region 11 office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.

J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.

H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.

T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness,

security, engineer-ing/ technical support, and operator training and safety assessment /qualitj t

verification, T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the arcas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness, security, engineerir.9/ technical support and safety assessment / quality veiif, cation.

The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements.

The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.

I I

l

ENCLOSURE 2 MEETING ATTENDEES W. T. Orders, Nuclear Regulatory Commission (NRC), Senior Resident, McGuire P. K. VanDoorn, NRC, Senior Resident Inspector, Catawba M. S. Lesser, NRC, Resident Inspector, Catawba T. A. Peebles, NRC, Section Chief V. L. Brownlee, Branch Chief, DRP, RI!

C. W. Hehl, Deputy Director Division cf Reactor Projects J. Nelson Grace, Regional Administrator G. C. Lainas, NRC/NRR, DRP E. W. Merschoff, Director, Division of Reactor Safety D. B. Matthews, Director. PDII-3, NRR D. Hood, Project Manager, PDII-3, NRR K. N. Jabbour, Catawba Project Manager, NRR J.P.Stohr, Director,DivisionofReactorSafetyandSafeguards(DRSS)

F. Jape, Technical Support Staf, DRS T. Owen, Catawba, Station Manager, Duke Power Coinpany (DPC)

H. B. Tucker, Vice president Nuclear Production, DPC T. McConnell, McGuire, Station Mar.ager, DPC

6 o

UNITED STATES

[p2 Clo,#'o,*

NUCLEAR REGULATORY COMMISSION a' *

  1. f.

R EGl*N 11 o

101 MARIETTA STREET N.W.

ATL ANTA. GEORGI A 30323 t,;*s.s,/

SEP 00 8)a8 Docket Nos. 50-369, 50-370 50-413, 50-414 License Nos. NPF-9, NPF-17 NPF-35, NPF-52 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

MEFTING

SUMMARY

< CATAWBA - DOCKET NOS. 50-413 AND 414; AND, MCOUIRE - DOCKET NOS. 50-369 AND 50-370 This letter refers to the meeting conducted at your request in the NRC Region !! Office on August 10, 1988.

This was a management meeting to discuss your plant performance and improvement programs.

A list of attendees, a brief summary and a copy of your handout are enclosed.

it is our opinion that this meeting was beneficial, and piovided for a better understanding of overall plant performance and your plans for the future at Catawba and McGuire.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10. Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the MC Public Document Room.

Should ycu have any questions concerning this matter, we will be pleased to discuss them.

Sincerely,

/

SG Luis A. Reyes, Director Division of Reactor Projects

Enclosures:

1.

Meeting Sumary 2.

Meeting Attendees -

3.

Duke Power Company Handout - McGuire Nuclear Station 4

Duke Power Company Handout - Catawba Nuclear Station cc w/encis:

(See page 2)

V

6 O

Duke Power Company 2

SEP v 9..

cc w/encls:

T. B. Owen, Station Manager, Catawba T. L. McConnell, Station Manager, McGuire

!r

O.

ENCLOSURE 1 MEETING

SUMMARY

Licensee: Duke Power Company Facilities:

Catawba and McGuire Docket Nos.:

50-413, 50-414, 50-369 and 50-370 A management meeting was held in the NRC Region !! office on August 10, 1988, to discuss recent events, overall plant performance and improvement programs.

J. Nelson Grace discussed the NRC desire to know how Duke perceived their overall performance at Catawba and McGuire and what their future plans are to enhance performance.

H. B. Tucker discussed how they intended to be open in their discussion of their self evaluation and that the plant managers would do the briefing for their respective site.

T. L. McConnell addressed the McGuire site's strengths and their concerns and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness,

security, engineer-ing/ technical support, and operator training and safety assessment / quality verification.

T. B. Owen addressed the Catawba site's concerns, the counterpoints of the concerns and their strengths and initiatives in the areas of plant operations, radiological controls, maintenance / surveillance, m rgency preperedness, security, engineering / technical support and safety assessment / quality verification.

The NRC staff acknowledged the extensive resources and capabilities of Duke and that they have recognized many areas for improvement and that they are implementing corrective actions and developing program enhancements.

The NRC expects their licensees to promptly evaluate and correct problems and we appreciated your frank discussion of your programs to accomplish these ends.

ENCLOSURE 2 MEETING ATTENDEES l

W. T. Orders, Nuclear Regulatory Commission (NRC), Senior Resident, McGuire P. K. VanDoorn, NRC, Senior Resident Inspector, Catawba M. S. Lesser, NRC, Resident Inspector, Catawba T. A. Peebles, NRC, Section Chief V. L. Brownlee, Branch Chief DRP, RII l

C. W. Hehl Deputy Director Division of Reactor Projects J. Nelson Grace, Regional Aduinistrator G. C. Lainas, NRC/NRR, DRP E. W. Merschoff, Director, Division of Reactor Safety D. B. Matthews, Director, PDII-3, NRR D. Hood, Project Manager, PDII-3, NRR K. N. Jabbour, Catawba Project Manager, NRR J. P. Stohr, Director, Division of Reactor Safety and Safeguards (DRSS)

F. Jape. Technical Support Staf, DRS T. Owen, Catawba, Station Manager Duke Power Company (DPC)

H. B. Tucker, Vice president Nuclear Production, DPC 1

T. McConnell, McGuire, Station Manager, DPC i

i t

I l

I i

l I

i i

f

ENCLOSURE 3 DUKE POWER COMPANY HANDOUT MCGUIRE NUCLEAR STATION 1

l

,a McGUlRE NUCLEAR STATION 1.

PLANT OPERATIONS STRENGTHS:

Longer runs and improved capacity factors Use of SRO in integrated Scheduling to minimize operability conflicts improved daily operating schedules e

Daily management plant status meetir.2s Decreased number of violations from 9 Level 4 in previous SALP period to 1 Level 3 and 1 Level 4 in most recent SALP period No operator error induced reactor trips in 3 years implemented tagging / labeling program for equipment and e

components - noticeable absence of wrong unit / wrong train events in 1988 Improved housekeeping / cleanliness in all areas Control room upgrade in progress - will improve working conJitions and standardize control room indications Control of materials / loose objects in containment l

Use of plant deficiency tags to identify deficiencies and follow up actions Developed McGuire Management Council Developing international interface (Russia / Cuba / France)

FIRE PROTECTION:

Reliability enhancements to fire protection procedures Ongol:tg review / upgrade of fire protection equipment pts i

l Improved organization / training of plant fire brigade

O e

Thorough, technical Duka Power QA fire protection audits have been performed and Identified items for improvement that have been completed CONCERNS /lNITIATIVES:

x Operations / Maintenance work control practices and plant status knowledge needs improvement Project /2 schedule improvement allows every work activity to be updated daily.

It produces individual crew schedules to allow better planning and prioritization of work.

This provides a more accurate status of work completion and ensures controlled entry into various T. S. modes.

Plant management emphasis on improving root cause analysis of all plant events should improve our performance here.

We are pressing accountability for this analysis to lower levels in the organizational and to less significant events.

X Unplanned reactor trips and associated ESF actuations are trending upward.

Two-thirds of all recent reactor trips are caused by equipment failures.

When a piece of equipment falls when tested, it is trended and analyzed under the new Test Failure Analysis Program.

This program includes an equipment history review and a root cause analysis.

System Experts are begl~nning to analyze equipment failures not associated with test failures, in addition a PM-2 program for predictive maintenance is being i

utilized more extensively now.

4 f

Increased number of violations due to procedural non-compliance Violations are occurring due to inadequate procedures and a lack of strict adherence to procedures.

Measures which have been taken which should improve our performance here:

(A)

Clarified Independent Verification procedure and covered it in requal training.

(B)

Clarified Tagout/ Removal and Restoration procedure and covered it in requal training.

(C)

All sections are pursuing procedure upgrade programs.

(D)

Line/ staff communications were held with station personnel to emphasize procedural adherence / procedural adequacy.

(E)

Superintendents stress procedural adherence through section head meetings to maintain a heightened awareness.

(F)

A station newsletter article, "Procedures are not Suggestions or Guidelines" by the Station Manage. was recently issued to employees (Refer to Attachment A).

(G)

G.O.

Licensing Group reviewed all incidents dealing with personnel error for trends, it was recommended that supervisors need to follow up on personnel errors to determine contributing factors or extenuating circumstances, if any, for the error.

i l

Emphasis on better root cause analysis should help resolve thin (Refer to Attachment B).

(H)

The Operating Excerience Management and Analysis (OEMA) function in our General Office was recently requested to review incidents from the past two years dealing with procedural adherence to determine any underlying causes for deviation.

It was determined that corrective actions for past incidents may have been too confined to a specific work group and that administrative deficiencies associated with procedural adherence should be better identified in the investigations.

The report is currently under review (Refer to Attachment C).

(1)

McGuire Operations personnel recently participated in the development of an Operations' "Commitment to Excellence" which is a professional code of conduct (Refer to ).

4

I a

t 11.

RADIOLOGICAL CONTROLS STRENGTHS Catch / containment leak control program has reduced leaks and contamination Improved outage support due to improved job pre-planning and more efficient use of technicians Reduction in personnel contaminations Eliminated contract HP techs for routine work Dosimetry system accredited by the National Voluntary Accreditation Program 4

l Reduction in number of NRC violations from 8 in previous SALP period to 1 in most recent SALP period 94% free access to the Auxiliary Sullding CONCERNS / INITIATIVES X

Radwaste volume generated exceeds national average i

}

A trash segregating and sorting system was implemented i

in December to reduce the volume of compacted clean trash.

i Radwaste volume reduction working group studied this concern, made recommendations to management and several j

improvements have been or are being implemented.

Upgraded shredder / compactor equipment has been purchased which will further reduce radwaste volumes.

Cumulative dose exposure exceeds national average i

There has been a reduction in cumulative dose for non-outage work.

However, the major source of exposure was work associated with refueling and maintenance i

l,

1

outages.

A4 loop Westinghouse / ice condenser plant has more maintenance requirements than those used to calculate the national average.

Efforts to increase S/G life and remove the RTO bypass system have resulted in high doses.

All radiation exposure jobs were assigned to groups in the station for detailed ALARA planning, resulting in much more detailed ALARA plans.

The initial results look good.

A major management initiative has been taken to transfer more dose accountability to craft worker and supervision and away from HP.

Increased level of management involvement and membership on ALARA committee.

l The accountabli of ALARA planning responsibilities between HP and Maintenance Planning is being clarified.

2 I

I i

i t

.s.

ll1. MAINTENANCE /SURVElLLANCE STRENGTHS:

Increasing the use of system experts Valve quality group performs quality inspections on valve repairs to improve quality of work and level of experience in the field A self assessment of maintenance program against INPO criteria has identified items for improvement that are being completed on a priority basis.

New vibration monitoring equipment has been purchased to expand our capacity to monitor vibration spectrum on rotating equipment Oil analysis program has been expanded to include many other pieces of equipment and allow for earlier detection 1

of component wear / failure Developing technology to test actuators on pneumatic valves leading industry /NRC efforts to define a viable process.

Implemented test failure analysis / root cause program Improved daily operating schedules KC HX on line AP monitoring for enhanced operability l

monitoring CONCERNS / INITIATIVES:

l x

increased number of violations due to procedural non-compliance from 8 in previous SALP period to 11 in current period initiatives taken under the Plant Operations category were station wide and apply to this concern as well. _

i O

e t

O I

4 IV.

EMERGENCY PREPAREDNESS STRENGTHS:

Corrected siren activation problem with Mecklenburg County NRC unannounced inspection in March with no findings No violations during SALP period Successful annual exercises (only 2 IFI's)

Developed new procedure for event classification to make more "user-friendly" CONCERNS / INITIATIVES:

e Current TSC facility is deficient j

Pursuing design / construction of new TSC facility to meet regulatory guidance criteria.

Current schedule for completion is 1990.

t V.

SECURITY STRENGTHS:

A dedicated lAE crew (CMD) to maintain security systems Upgrade of security barrier sizes and design Replacement of outdated explosion detectors and electric locks CONCERNS / INITIATIVES X

Replacement / repair of CCTV cameras (A)

CCTV cameras and monitors are belng replaced with state-of-art equipment.

(B)

A temporary modification was implemented to correct 4

the "wali effect".

This was necessary due to the length of time required to design and upgrade the final modification which will be completed in mid-1989.

x Need to reduce the number of lost security badges and tailgating incidents.

Site management from all groups is working together to establish a statement of value of adherence to these requirements with a consistent corrective discipline policy throughout the company including vendors.

Daily updates are provided on the closed circuit TV system concerning numbers of security problems for tmployee awareness.

The General Employee Training video has been revised to stress the importance of security badge control.

.g.

o c

6 l

l Data on events and groups involved is compiled, trended and provided to management for corrective action.

Neckstraps have been provided for more positive attachment of security badges.

l l

l 6.

VI.

ENGINEERING / TECHNICAL SUPPORT STRENGTHS:

Placement of a Design Engineering office on site has l

resulted in (A) onsite problems resolution during installation of modifications i

(8) onsite interpretation of design requirements / documents i

(C)

Increased involvement in long term rotential operability problems (i.e., NS HXs)

(D)

Earlier DE involvement in station problems (i.e.,

resolution of errosion problems in S/G blowdown tank)

(E)

More immediate design inspections for operating f

problems or modifications (i.e., damaged KC flex hose)

(F)

Increased DE involvement and timeliness of operability reviews i

Topform program has increased quality of documentation and f

e design reviews I

Topform program has increased the required interface with

[

the station to assure a clearer understanding of station problems j

Decreased unnecessary modification paperwork by an improved root cause analysis of problems I

RefueIing I

i I

Very successful during last SALP period at planning l

refuelings and meeting outage schedules l

l l

[ t 0

o o

o.

i 6

Operator Trainina New site specific simulator with state-of-art technology

?

Increased simulator training time from 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> (1987) to I

40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> (1988) and then to 50-60 hours (1989)

Added designated simulator familiarization for i

non-licensed operators during requal training Implemented Training and Qualification guides and requal case studies On-shift SRO's are now rotated through training instructor slots (4 total) a Recent INPO re-accreditation only identified two concerns, lowest to date on eleven visits

]

CONCERNS /lNITIATIVES:

x Temporary modification program has had no design review in i

the past.

l l

3 Methods to increase DE involvement in temporary l

modification program to provide a more thorough review of adherence to design basis and safety concerns are l

being investigated and will be implemented.

X Rate of incidents and violations during refueling outages 1

is too high.

l j

Corrective actions yet to be identified.

Outage critique and folicw-ups will help resolve this concern.

1 t

Vll. SAFETY ASSESSMENT / QUALITY VERIFICATION STRENGTHS:

SITA audit on 0/G Auxiliary System Annual SITA audits on selected systems Thorough follow-up on known or potential safety concerns and industry events.

Examples:

(A)

Passive civil features design study (B)

Fisher valve evaluation (C)

Missing Missile Shield Bolts (D)

Bulletin on Surry's containment sump suction line cleanliness INITIATIVE:

We are placing more emphasis and efforts in improving communications with all NRC personnel, it is our desire to be very open and responsive to all NRC concerns and provide timely and accurate information.

8,,

O 0

ENCLOSURE 4 DUKE POWER COMPANY HANDOUT CATAWBA NUCLEAR STATION

o G

1.

PLANT OPERATIONS Concerns 1.

Non-Conservative Approach to Tech Specs April 1987 Violation on Calibration of Power Range -

(Performance Group)

(J. K. L. Q)

Pressurizer Safety Valve Position Indication -

(Individual Supervisor)

(J. P. L)

Auxiliary Feedwater Flow Control Valves - Positioning Above 10% Power - (G.O. Licensing)

(L. Q. K)

Channel Checks On Offscale Gauges - (Operations)

(L.R)

Containment Integrity - ASME vs. Tech Spec Requirements -

(G.O. Licensing)

(L. J. Q. K. S. T)

ECCS Pump Venting - Question of Interpretation -

(Industry Initiative To Remove This Spec Further Review By Ops & Station Manager.)

Counterpoints Several Tech Spec Changes Are In Tc Correct Non-Conservative Or Incorrect Data.

(Licensee Identified) E.G., Airlock Testing Pressure Have Numerous Existing Interpretations And Are Working To Improve The Manual To Assist In Tech Spec Compliance.

l Catawba Is A Good Example Of A Non-Standard Plant Under Standard Tech Specs.

2.

Back To Back Safety Iniections Unit 1 1-23-88 / Unit 2 2-9-E8 Personnel Error -

Failure To Follow Procedures (M. N. 0) 3.

Recent Unit 2 Reactor Trips Six Unit 2 Trips In Late May-June, 1988 Counterpoint: Only : Of The o Involved Personnel Error Or i

Managenent Deficiency.

The other 4 Were Equipment Problems or Undetermined.

10 Trips on Unit 2 In This SALP:

5 Autenatic & 5 Manual 9 of The 10 Trips Involved Feedwater Transients 1 Of The 10 Trips Involved Personnel Error l

t

i f*

Plant Operations (Continued)

Strengths and Initiatives a.

Long Unit 1 Run (144 Continuous Days) And > 90 % Capacity Factor At Start of Tube Leak Outage.

b.

NC Leakage Has Caused No Shutdowns In This SALP - Total Leakage Is Consistently < 1 GPM This Cycle - Each Unit.

c.

ESF's Reduced:

33 In This SALP Versus 47 In 8/86-7/87 Period.

d.

Total Trips Heduced:

11 In This SALP Versus 15 In 8/86-7/87 Period.

e.

Staff Developed A Professional Code of Conduct f.

Unit 2 Steam Generator Level Modification in 1989 Refueling - Should Improve Situation On Teodwater Transients, g.

Daily Management Plant Status Meeting h.

Plant Labeling Program To Complete 6/89 1.

Improved Plant Housekeeping - Particulary Unit 2 J.

Involvement of Compliance in Operability Decisions k.

Compliance Group Restructuring To Provide One or More SRO's In The Group 1.

Pro Active Tech Spec Review / Training Using Senior Management Person.

Ops Instructors SRO's Management Ops Audit m.

Training By Section Heads To Supervisors And Crews Conducted In Operations. Performance.

Instrumentation And Electrical Construction Dept. On Procedure Use. IV. Personnel Error's, n.

Station Manager Emphasizing The Need for Procedural Adherence And Understanding In Station Wide Letter.

This Included IV.

o.

Station Management Emphasizing The Importance Of Supervisory Involvement In The Plant With His Crew.

e Plant Operations (Continued)

Strengths and initiativen p.

Ops Supt. Or Station hgr. To Review All Compensatory Action Plans Before Iraplementation, q.

Wider Review Of Proposed Tech Spec Interpretations r.

Review Of OEP's With Training Services Management s.

System Expert Review Of Tech Spec Interpretations t.

Strengthening Of The G.O. As A Focal Point For NRC Communicction u.

Prioritizing Tech Spec Change Submittals Through G.O.

Licensing To NRC I

i h

t i

t l

l

{

l l

1 l

l i

l i

'l l

t l

i f

r n

fe 2.

RADIOLOGICAL CONTROLS l

concerns Inadequate Frisking - 9/87 And 11/87 NRC Inspections Response /Followupt Specific Training Provided To All t

Personnel On The Problem And Single Point RCA Access Point l

Established - Monitored By HF Hand And Foot Monitors i

Whole Body Monitors l>

HP Conducts Periodic Visual Surveillance l

i

~

Management Surveillance - Continuing l

Program l

.l l

Catawba Exposure Versus Industry Average l

l..

352 Person R M Per Unit Versus 3/1 Person Rem / Unit j

i National Average

}

j Strennth/ Initiatives

(

)

Gansaa Spectroscopy Equipment Standardized j

System Expert Established For MF's t

t

]

Trending of Information Tor Management I

HP Self Appraisals 1

Solid Waste Reduction - 255 Cubic Meters is The Stations 1988 Goal. To Date. 39 Cubic Meters Have Been Generated.

L r

S f

)

i r

l t

f l

I i

1 l

l l

1

,j A

1 3.

MAINTENANCE / SURVEILLANCE Concerns:

Clam Incident (Programmatic)

S/G Loose Parts - Reportability Timeliness Maintenance Rule Making / Maintenance Improvement Strengths / Initiatives c

Established Maintenance Engineering Services Group / Staffing a.

(Technical Support Program)

E.itablished System Expert Program And Have Used It For D/G Problem, trd Clam Incident.

P Ai.. Goals For Reducing Work Request Backlog And PM/CM Rat

_tatus"

~100 W.R.'s > 2 Years Old

~200 W.R.'s > 1 Year Old 48.2% of Outstanding W.R.'s Are < 3 Mo. Old Goala:

0 W.R.'s > 3 Month Old l

< 300 Total Non-Outage Outstanding Work 1

(By 12-31-88) 2 Recent Improvements In Violations Associated With Failuro To 1-Retest 1 Violation - 1985 1 Violation - 1986 3 Violation - 1987 1 Violation - 1988 Planning Organization - Traiaing, Single Pir ming Group Concept.

~

,-______o

?

, 7 4

EMERGENCY PREPAREDNESS

^

Streneths/ Initiatives, No Violations In This SALP As Compared To 2 In Previous SALP Training Inprovements - Field Team Direction When In A Plume Uso Of Critical Parameters Monthly Drills / Exercises - Since Mid 1987

- Allows Use Of Alternates

- Improves Response Skills

- Heightens Interest / Involvement Mado ihe TSC A "Dedicated" Facility On 8-20-87

- Allows Quicker Activation TSC Now Automatically Activated i t Alert And Site Assembly Conducted

- Cosmetic Improvements - Position Badges, Area Signs Enclosed Radio Area For HP

- Packup Radio To NC/SC Hoved The OSC To A Larger Facility on 6-21-88

- Located Near The Single Point Access To RCA

(

- Facility Is Dedicated

- Addresses past NRC Concerns Emergency Vans

- Now are Marked As such

- Are Under The Station Emergency Preparedness Coordinators Control

- Have Assigned Parking Near The Administration Building

- Emergency Kits On-Board At All Times

- $30,000 Upgrade In Air Monitors EAL Review

- 3 Stations Reviewing For Consistency In Classifying Eients 4

- Review Will Include other Utilities EALs Additional Staffing

- 1 Additional Member Added To The Station Emergency Preparedness Staff In July, 1987.

,4, e.

S.

SECURIT'l Concerns Lack Of Controls Over Safeguards Information Operations / Security Interface In Establishing SSF Degraded Mode Tailgating Strengths / Initiatives A Design Study Of The PAP Has Improved Badge Control Enhancements To The Vital Barrier Are Being Made Thru The NSM Process.

HVAC Mods Are Incorporating Barriers In The Ductwork (5/8" Rebar).

CCTV Upgrade In 1989 $300.000.

Reconfiguration Of The Fence Line. More Cameras And New Orientation.

Tactical Response Upgraded. Combat Training And Force In Force Issues To Be Addressed.

(

L f

p L

e e

6 ENGINEERING / TECHNICAL SUPPORT Strengths And Initiatives Desian Engineerina Onsite Design Engineering Hns On-Site Office Established April, 1988.

Use of TopForm During The Modification Program This Interface Is Being used For Involvement In Daily Operations Operator Training Onsite Simulator Operational January, 1988 Will Increase Operators Simulator Times 20 Hours / Year 1987 50 Hours / Year 1988 On Shift SRO's Periodically Rotated Into One Of Four Training Insttvetor Slots NRC Exam Pass' Rate 9-86 And 9-87 100% Pass-Rate (26/26)

Initial Hot License 20/21 Passed Total Rate To Date 46/37 EP's Revised To Include Human Factors And Have Been Verified / Validated On The Simulator.

Procedures Revised / Implemented 8-1-88.

Refuelina Activities A S Year Outage Plan Established January 1988 Use of The Reactor Building Coordinator "P oject II" Computer Program Allows Rapid Development Of Ai, Outage Work Schedule. This Worked Well For The Present Unit 1 Tube Leak outage.

Outage Logic Chart Improvements r

s

.a t-

~7.

SAFETY ASSESSMENT / QUALITY VERIFICATION Concerns j

i 1.

Qualification Of The QA Staff 2.

Quality Of Submittals Strengths / Initiatives Station Performance Indicator Program Analysis Of ESF Events And Personnel Errors Followup On Bullentins, Generic Letters, f, : c.

- Fi her Valves

- West Jersey Materials Passive Civil Features Design Study Reduction In Outstanding NRC Commitments (129 8-1-88 Ver.=us 195 8-1-87.)