ML20154H454: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_-. | {{#Wiki_filter:_-. | ||
d$os | d$os nio fo UNITED STATES IN RESPONSE, PLEASE g | ||
[\ | [\\ | ||
j NUCLEAR REGULATORY COMMISSION REFER TO: | |||
M880908 g. | |||
;j W ASHINGTON, D.C. 20555 Saptember 16, 1988 OFFICE OF THE SECRETARY MEMORANDUM FOR: | |||
Victor Stello, Jr. | |||
Executive Director for_ Operations William C. | |||
Parler, General Counsel FROM: | |||
[ | |||
.N uel J. | |||
Chilk, Secretary | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 34: | ||
THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) | THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) | ||
The commission | The commission | ||
* was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power) . | * was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power). | ||
The proposed final rule reconciles discrepancies between the language of the statement of considerations and the language 4 | |||
of the Commission's 1982 emergency planning rule. | |||
The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule. | The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule. | ||
cc: | cc: | ||
Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers GP P | |||
- Advance | |||
'S - Pl-124 | |||
* Commissioner Carr was not present. | * Commissioner Carr was not present. | ||
h G809220012 880916 PDR | h G809220012 880916 PDR 10CFR | ||
) O PT9.7 PDC | |||
]}} | |||
Latest revision as of 00:39, 11 December 2024
| ML20154H454 | |
| Person / Time | |
|---|---|
| Issue date: | 09/16/1988 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 M880908, NUDOCS 8809220012 | |
| Download: ML20154H454 (1) | |
Text
_-.
d$os nio fo UNITED STATES IN RESPONSE, PLEASE g
[\\
j NUCLEAR REGULATORY COMMISSION REFER TO:
M880908 g.
- j W ASHINGTON, D.C. 20555 Saptember 16, 1988 OFFICE OF THE SECRETARY MEMORANDUM FOR
Victor Stello, Jr.
Executive Director for_ Operations William C.
Parler, General Counsel FROM:
[
.N uel J.
Chilk, Secretary
SUBJECT:
STAFF REQUIREMENTS - BRIEFING ON FINAL RULE ON EMERGENCY PLANNING AND PREPAREDNESS REQUIRE-MENTS FOR NUCLEAR POWER PLANT FUEL LOADING AND INITIAL LOW POWER OPERATIONS, 2:00 P.M.,
THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)
The commission
- was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power).
The proposed final rule reconciles discrepancies between the language of the statement of considerations and the language 4
of the Commission's 1982 emergency planning rule.
The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule.
cc:
Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers GP P
- Advance
'S - Pl-124
- Commissioner Carr was not present.