ML20154H454: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_-.
{{#Wiki_filter:_-.
d$os niog fo UNITED STATES NUCLEAR REGULATORY COMMISSION IN RESPONSE, PLEASE
d$os nio fo UNITED STATES IN RESPONSE, PLEASE g
[\             j                                                 REFER TO: M880908
[\\
: g.                                   W ASHINGTON, D.C. 20555
j NUCLEAR REGULATORY COMMISSION REFER TO:
                ;j
M880908 g.
      % ,,,,,*                          Saptember 16, 1988 OFFICE OF THE SECRETARY MEMORANDUM FOR:       Victor Stello, Jr.
;j W ASHINGTON, D.C. 20555 Saptember 16, 1988 OFFICE OF THE SECRETARY MEMORANDUM FOR:
    ,                            Executive Director for_ Operations William C. Parler, General Counsel FROM:               [ .N uel J. Chilk, Secretary
Victor Stello, Jr.
Executive Director for_ Operations William C.
Parler, General Counsel FROM:
[
.N uel J.
Chilk, Secretary


==SUBJECT:==
==SUBJECT:==
Line 29: Line 34:
THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)
THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)
The commission
The commission
* was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power) .       The proposed final rule reconciles discrepancies between the 4          language of the statement of considerations and the language of the Commission's 1982 emergency planning rule.
* was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power).
The proposed final rule reconciles discrepancies between the language of the statement of considerations and the language 4
of the Commission's 1982 emergency planning rule.
The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule.
The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule.
cc:     Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers GP P   - Advance
cc:
                      'S - Pl-124
Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers GP P
- Advance
'S - Pl-124
* Commissioner Carr was not present.
* Commissioner Carr was not present.
h G809220012 880916 PDR   10CFR                                                       ) O PT9.7             PDC
h G809220012 880916 PDR 10CFR
                                                                                              ]}}
) O PT9.7 PDC
]}}

Latest revision as of 00:39, 11 December 2024

Staff Requirements Memo Re 880908 Briefing in Rockville,Md on Final Rule on Emergency Planning & Preparedness
ML20154H454
Person / Time
Issue date: 09/16/1988
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 M880908, NUDOCS 8809220012
Download: ML20154H454 (1)


Text

_-.

d$os nio fo UNITED STATES IN RESPONSE, PLEASE g

[\\

j NUCLEAR REGULATORY COMMISSION REFER TO:

M880908 g.

j W ASHINGTON, D.C. 20555 Saptember 16, 1988 OFFICE OF THE SECRETARY MEMORANDUM FOR

Victor Stello, Jr.

Executive Director for_ Operations William C.

Parler, General Counsel FROM:

[

.N uel J.

Chilk, Secretary

SUBJECT:

STAFF REQUIREMENTS - BRIEFING ON FINAL RULE ON EMERGENCY PLANNING AND PREPAREDNESS REQUIRE-MENTS FOR NUCLEAR POWER PLANT FUEL LOADING AND INITIAL LOW POWER OPERATIONS, 2:00 P.M.,

THURSDAY, SEPTEMBER 8, 1988, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)

The commission

  • was briefed by the Office of the General Counsel and the staff on a proposed final rule on emergency planning requiroments for nuclear power plants during fuel loading and low power testing (up to 5 percent power).

The proposed final rule reconciles discrepancies between the language of the statement of considerations and the language 4

of the Commission's 1982 emergency planning rule.

The Commission requested that in future promulgation of final rulemaking, the staff ensure conoiatency between the statement of considerations and the final rule.

cc:

Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers GP P

- Advance

'S - Pl-124

  • Commissioner Carr was not present.

h G809220012 880916 PDR 10CFR

) O PT9.7 PDC

]