ML20154P955: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,                                                       .-_
{{#Wiki_filter:,
M MM Log # TXX-88708
M MM Log # TXX-88708 4
                                                      -      4        File # 10110 909.5 nlELECTRIC R''' # IOC'R$U'05('I September 30, 1988
File # 10110 909.5 nlELECTRIC R''' # IOC'R$U'05('I September 30, 1988
              % sham G. Coenau                                                                       >
% sham G. Coenau t,u m ry,n,,um,
t,u m ry,n,,um,
'J. S. Nuclear Regulatory Commission Attn: Document Control Desk i
              'J. S. Nuclear Regulatory Commission                                                   >
Washington, D.C.
Attn: Document Control Desk                                                             i Washington, D.C. 20555
20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)                                   :
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 EFFECT OF THERM 0 LAG ON DERATING FACTORS 50AR: CP-87-21 (SVPPLEMENTAL REPORT)
DOCKET N05. 50-445 AND 50-446 EFFECT OF THERM 0 LAG ON DERATING FACTORS 50AR: CP-87-21 (SVPPLEMENTAL REPORT)
J Gentlemen:
J Gentlemen:
On December 23, 1987, TV Electric letter provided notification that the deficiency involving the effect of thermolag on derating factors was reportable under the provisions of 10CFR50.55(e). The latest report on this           !
On December 23, 1987, TV Electric letter provided notification that the deficiency involving the effect of thermolag on derating factors was reportable under the provisions of 10CFR50.55(e).
1 issue, logged TXX-88599, was submitted August 1, 1988. This report is i             submitted to update the corrective action completion schedule.                         '
The latest report on this issue, logged TXX-88599, was submitted August 1, 1988.
i TXX-88599 indicated that Unit 1 corrective actions would be completed by October 1, 1988, with supporting documentation available after November 30, 1988. However, these activities have been rescheduled for completion by February 28, 1989. The schedule for Unit 2 remains unchanged.
This report is 1
]                                                                     Very truly yours, i                                                                                                     h i
i submitted to update the corrective action completion schedule.
i TXX-88599 indicated that Unit 1 corrective actions would be completed by October 1, 1988, with supporting documentation available after November 30, 1988. However, these activities have been rescheduled for completion by February 28, 1989.
The schedule for Unit 2 remains unchanged.
]
Very truly yours, i
h i
1 j
1 j
W. G. Counsil                   l 1
W. G. Counsil l
By:           U.       f_       1 n W. Beck               :
1 By:
)'
U.
Vice President, Nuclear Engineering        i J
f_
JDS/mlh c-Mr. R. D. Martin, Region IV
1 n W. Beck
;                  Resident Inspectors, CPSES (3)
)
)
j         681VVJU243 06VYJU                   j PDR     ADOCK 05000445 S                       PDC fdM 2 a saw,,< sum u n a,u.a. ra ., nm                       ijp}}
Vice President, Nuclear Engineering i
J JDS/mlh c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
)
j 681VVJU243 06VYJU j
PDR ADOCK 05000445 S
PDC fdM 2 ijp a saw,,< sum u n a,u.a. ra., nm
. - -}}

Latest revision as of 00:30, 11 December 2024

Supplemental Deficiency Rept CP-87-21 Re Effect of Thermolag on Derating Factors.Initially Reported on 871223.Corrective Actions Rescheduled for Completion by 890228 for Unit 1.Unit 2 Schedule Unchanged
ML20154P955
Person / Time
Site: Comanche Peak  
Issue date: 09/30/1988
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-21, TXX-88708, NUDOCS 8810030243
Download: ML20154P955 (1)


Text

,

M MM Log # TXX-88708 4

File # 10110 909.5 nlELECTRIC R # IOC'R$U'05('I September 30, 1988

% sham G. Coenau t,u m ry,n,,um,

'J. S. Nuclear Regulatory Commission Attn: Document Control Desk i

Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 EFFECT OF THERM 0 LAG ON DERATING FACTORS 50AR: CP-87-21 (SVPPLEMENTAL REPORT)

J Gentlemen:

On December 23, 1987, TV Electric letter provided notification that the deficiency involving the effect of thermolag on derating factors was reportable under the provisions of 10CFR50.55(e).

The latest report on this issue, logged TXX-88599, was submitted August 1, 1988.

This report is 1

i submitted to update the corrective action completion schedule.

i TXX-88599 indicated that Unit 1 corrective actions would be completed by October 1, 1988, with supporting documentation available after November 30, 1988. However, these activities have been rescheduled for completion by February 28, 1989.

The schedule for Unit 2 remains unchanged.

]

Very truly yours, i

h i

1 j

W. G. Counsil l

1 By:

U.

f_

1 n W. Beck

)

Vice President, Nuclear Engineering i

J JDS/mlh c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

)

j 681VVJU243 06VYJU j

PDR ADOCK 05000445 S

PDC fdM 2 ijp a saw,,< sum u n a,u.a. ra., nm

. - -