                                                    - .ma MM                     Log # TXX-88700 1
-.ma MM Log # TXX-88700 1
File # 10110 903.7 7t# ELECTRIC             Ref. # 10CFR50.55(e)
File # 10110 903.7 7t# ELECTRIC Ref. # 10CFR50.55(e)
Wileleat G. Coumeil 6""""""^""""
Wileleat G. Coumeil 6""""""^""""
September 28, 1988             !
September 28, 1988 U. S. Nuclear Regulatory Commission Attn:
U. S. Nuclear Regulatory Commission Attn:       Document Control Oesk                                                                 ,.
Document Control Oesk Washington, D. C.
Washington, D. C. 20555
20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SE!SMIC ANALYSIS OF SERVICE WATER INTAKE STRUCTURE SDAR: CP-87-115 (SUPPLEMENTAL REPORT) l Gentlemen:
DOCKET NOS. 50-445 AND 50-446 SE!SMIC ANALYSIS OF SERVICE WATER INTAKE STRUCTURE SDAR: CP-87-115 (SUPPLEMENTAL REPORT) l Gentlemen:
On February 4,1988, TV Electric letter loLJed TXX-88055 provided notification of a reportable deficiency involving a modeling error for seismic analysis of the service water intake structure. A similar problem was noted for seismic Category I concrete tanks. This report is submitted to provide the current                       i status of this issue.                                                                             '
On February 4,1988, TV Electric letter loLJed TXX-88055 provided notification of a reportable deficiency involving a modeling error for seismic analysis of the service water intake structure.
TXX-88055 indicated that Unit 1 corrective actions would be completed by i      September 28, 1988.         The completion date of September 28, 1988 was not met.               l TU Electric's next report regarding the status of the corrective action completion dates for this issue will be submitted no later than November 30,                     i 1988.
A similar problem was noted for seismic i
Category I concrete tanks.
This report is submitted to provide the current status of this issue.
TXX-88055 indicated that Unit 1 corrective actions would be completed by September 28, 1988.
The completion date of September 28, 1988 was not met.
l i
TU Electric's next report regarding the status of the corrective action completion dates for this issue will be submitted no later than November 30, i
1988.
i Very truly yours, (M.Co.
i Very truly yours, (M.Co.
W. G. Counsil i
W. G. Counsil i
By:             O D. R. Woodlan Docket I h ensiny Manager CBC/mlh i
O By:
c-Mr. R. D. Martin, Region IV                                                                     [
D. R. Woodlan Docket I h ensiny Manager CBC/mlh i
Resident Inspectors CPSES (3) 8810060088 880928                     )                                               t     .
c-Mr. R. D. Martin, Region IV
FfDR ADOCK0500g5                     ;                                                  , g I
[
4                                                                                                         i 400 North Ok Street LB 81 Delles. Texas 1H01
Resident Inspectors CPSES (3) 8810060088 880928
                                                                                                          !}}
)
t FfDR ADOCK0500g5
, g I
4 i
400 North Ok Street LB 81 Delles. Texas 1H01
-}}

Latest revision as of 22:32, 10 December 2024

Supplemental Deficiency Rept CP-87-115 Re Modeling Error for Seismic Analysis of Svc Water Intake Structure.Initially Reported on 880201.Completion of Corrective Actions for Unit 1 Extended Until 881130
ML20155A813
Person / Time
Site: Comanche Peak, Allens Creek  Luminant icon.png
Issue date: 09/28/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-115, TXX-88700, NUDOCS 8810060088
Download: ML20155A813 (1)


Text

-.ma MM Log # TXX-88700 1

File # 10110 903.7 7t# ELECTRIC Ref. # 10CFR50.55(e)

Wileleat G. Coumeil 6""""""^""""

September 28, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Oesk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SE!SMIC ANALYSIS OF SERVICE WATER INTAKE STRUCTURE SDAR: CP-87-115 (SUPPLEMENTAL REPORT) l Gentlemen:

On February 4,1988, TV Electric letter loLJed TXX-88055 provided notification of a reportable deficiency involving a modeling error for seismic analysis of the service water intake structure.

A similar problem was noted for seismic i

Category I concrete tanks.

This report is submitted to provide the current status of this issue.

TXX-88055 indicated that Unit 1 corrective actions would be completed by September 28, 1988.

The completion date of September 28, 1988 was not met.

l i

TU Electric's next report regarding the status of the corrective action completion dates for this issue will be submitted no later than November 30, i

1988.

i Very truly yours, (M.Co.

W. G. Counsil i

O By:

D. R. Woodlan Docket I h ensiny Manager CBC/mlh i

c-Mr. R. D. Martin, Region IV

[

Resident Inspectors CPSES (3) 8810060088 880928

)

t FfDR ADOCK0500g5

, g I

4 i

400 North Ok Street LB 81 Delles. Texas 1H01

-