ML20135F541: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_- _ . _ _             _ _ _     _ __   . _ _ _ _ _ _ ._     _ _ . - _ .- . _ _ _ - - -           - . - _
{{#Wiki_filter:_- _ . _ _
    -
_ _ _
      ,
_
                                                                                                                                      l
__
                                                                                                                                      i
. _ _ _ _ _ _ ._
  .
_ _ . - _ .- . _ _ _ - - -
- . - _
-
,
i
.
t
t
i
i
:
:
i
i
                                                    December 9,1996
December 9,1996
          Mr. Charles D. Frizzle
Mr. Charles D. Frizzle
e         President
e
          Maine Yankee Atomic Power Company
President
          329 Bath Road
Maine Yankee Atomic Power Company
          Brunswick, Maine 04011
329 Bath Road
                                                                                                                                      l
Brunswick, Maine 04011
          SUBJECT:               NRC INTEGRATED INSPECTION REPORT 50-309/96-12
SUBJECT:
                                  (NOTICE OF VIOLATION)
NRC INTEGRATED INSPECTION REPORT 50-309/96-12
                                                                                                                                      !
(NOTICE OF VIOLATION)
          Dear Mr. Frizzle:
Dear Mr. Frizzle:
          On October 26,1996, the NRC completed an inspection at your Maine Yankee reactor
On October 26,1996, the NRC completed an inspection at your Maine Yankee reactor
          facility. The results of that inspection were discussed with Messrs. G. Leitch, D. Whittier,
facility. The results of that inspection were discussed with Messrs. G. Leitch, D. Whittier,
          R. Blackmore, and others of your staff at an exit meting held on October 31,1996. The
R. Blackmore, and others of your staff at an exit meting held on October 31,1996. The
          enclosed report presents the results of tFat inspection.                                                                   I
enclosed report presents the results of tFat inspection.
          During the 6-week period covered by this inspection period, your conduct of activities at the
I
          Maine Yankee facilities was safety focused. However, we continue to note plant material
During the 6-week period covered by this inspection period, your conduct of activities at the
          condition problems challenging operator performance.
Maine Yankee facilities was safety focused. However, we continue to note plant material
          Based on the results of this inspection, two apparent violations were identified. The
condition problems challenging operator performance.
          violations involved failure to maintain the primary vent stack sampling system operable
Based on the results of this inspection, two apparent violations were identified. The
          during maintenance on October 4,1996, and failure to properly control safeguards
violations involved failure to maintain the primary vent stack sampling system operable
          information on October 17,1996.
during maintenance on October 4,1996, and failure to properly control safeguards
          These violations are cited in the enclosed Notice of Violation, and the circumstances
information on October 17,1996.
          surrounding the violations are described in detail in the enclosed report. Please note that
These violations are cited in the enclosed Notice of Violation, and the circumstances
          you are required to respond to this !etter and should follow the instructions specified in the
surrounding the violations are described in detail in the enclosed report. Please note that
          enclosed Notice when preparing ycur response. The NRC will use your response, in part, to
you are required to respond to this !etter and should follow the instructions specified in the
          determine whethe. further enforcement action is necessary to ensure compliance with
enclosed Notice when preparing ycur response. The NRC will use your response, in part, to
          regulatory requirements.
determine whethe. further enforcement action is necessary to ensure compliance with
                                                                                                                          .
regulatory requirements.
                                                                                                                        \\
.
                                                                                                                        !'
\\\\!'
                                                                                                                /
/\\
                                                                                                                  \  ,           ,
,
        9612130113 961209                                                                                           ;
,
        PDR   ADOCK 05000309
9612130113 961209
        G                           PDR
;
                                                                                                                                      j
PDR
ADOCK 05000309
G
PDR
j


        . - _ -     -       .
. - _ -
                                  =. .. - _ _ . - .                 ..-      .     .       ._ -.-._. . - - - --
-
'
.
    .. .
=. .. - _ _ . - .
                                                                                                                    l
..
.   .
.
.
._ -.-._. .
- -
-
--
-
'
..
.
l
.
.
4
4
            Mr. Charles D. Frizzle                           2
Mr. Charles D. Frizzle
                                                                                                                    :
2
1                                                                                                                   l
:
i                                                                                                                   >
1
                                                                                                                    2
l
            In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
i
,            its enclosure will be placed in the NRC Public Document Room.
>
l                                                           Sincerely,
2
                                                                                                                    i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
!
its enclosure will be placed in the NRC Public Document Room.
                                                            Original Signed By:
,
                                                            Richard Conte, Chief
l
                                                            Reactor Projects Branch No. 5
Sincerely,
                                                            Division of Reactor Projects                           :
i
I                                                                                                                   l
!
Original Signed By:
Richard Conte, Chief
Reactor Projects Branch No. 5
Division of Reactor Projects
:
I
*
*
            Docket No: 50-309                                                                                       I
Docket No: 50-309
            License No: DRP-36                                                                                     l
License No: DRP-36
4                                                                                                                   I
4
4           Enclosure: NRC Inspection Report No. 50-309/96-12                                                       !
4
                                                                                                                    l
Enclosure: NRC Inspection Report No. 50-309/96-12
                                                                                                                    '
!
  !          cc w/ encl-
cc w/ encl-
;            G. Leitch, Vice President, Operations
                                                                                                                    l
  i          J. M. Block, Attorney at Law                                                                            l
l            P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
                                                                                                                    )
j          R. Blackmore, Plant Manager                                                                            l
)            L. Diehl, Manager of Public and Governmental Affairs
l            J. A. Ritsher, Attorney (Ropes and Gray)
            P. Dostie, State Nuclear Safety inspector                                                              ]
'
'
            P. Brann, Assistant Attorney General                                                                   l
;
            U. Vanags, State Nuclear Safety Advisor                                                                 1
G. Leitch, Vice President, Operations
i
J. M. Block, Attorney at Law
l
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
)
j
R. Blackmore, Plant Manager
)
L. Diehl, Manager of Public and Governmental Affairs
l
J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostie, State Nuclear Safety inspector
]
P. Brann, Assistant Attorney General
l
'
U. Vanags, State Nuclear Safety Advisor
C. Brinkman, Combustion Engineering, Inc.
4
4
            C. Brinkman, Combustion Engineering, Inc.                                                              I
                                                                                                                    '
'
'
            W. D. Meinert, Nuclear Engineer
W. D. Meinert, Nuclear Engineer
;            First Selectmen of Wiscasset                                                                           i
'
:           Maine State Planning Officer - Nuclear Safety Advisor                                                 j
First Selectmen of Wiscasset
            State of Maine, SLO Designee
i
;
:
Maine State Planning Officer - Nuclear Safety Advisor
j
'
'
                                                                                                                    ;
State of Maine, SLO Designee
;
4
4
            State Planning Officer - Executive Department                                                         ]
State Planning Officer - Executive Department
]
i
i
            Friends of the Coast                                                                                   l
Friends of the Coast
                                                                                                                    \
\\
                                                                                                                    l
.
.
                                                                                                                     1
                                                                                                                     1
1
1
i                                                                                                                   !
i
,                                                                                                                  ;
;
                                                                                                                    l
,
.                                                                                                                   ;
.
i
;
i
!
!
;
;
                                                    ,..,,_                   _
,..,,_
                                                                                        . = _
_
. = _


                              _     _ _ . . - .     __   .             .               _             . - _ _   .           .       .   - _ _ _ _ _ . _ _ _ _ . _ _
_
.. .
_ _ . . - .
__
.
.
_
. - _ _
.
.
.
- _ _ _ _ _ . _ _ _ _ .
_ _
..
.
.
    Mr. Charles D. Frizzle                                               3
.
                                                                                                                                                                        !
Mr. Charles D. Frizzle
    Distribution w/ encl.
3
    Region i Docket Room (with concurrences)
Distribution w/ encl.
    Nuclear Safety information Center (NSIC)                                                                                                                           I
Region i Docket Room (with concurrences)
    PUBLIC                                                                                                                                                             I
Nuclear Safety information Center (NSIC)
    NRC Resident inspector
PUBLIC
    D. Screnci, PAO
NRC Resident inspector
    OE (2) (EA Packages Only)
D. Screnci, PAO
    R. Conte, DRP
OE (2) (EA Packages Only)
    H. Eichenholz, DRP
R. Conte, DRP
    C. O'Daniell, DRP
H. Eichenholz, DRP
    Distribution w/ encl (VIA E-MAIL):
C. O'Daniell, DRP
    W. Dean, OEDO
Distribution w/ encl (VIA E-MAIL):
    S. Varga, Director,1/11, DRPE, NRR
W. Dean, OEDO
    D. Dorman, LPM, NRR
S. Varga, Director,1/11, DRPE, NRR
    R. Cirreia, NRR
D. Dorman, LPM, NRR
    R. Frahm, Jr., NRR
R. Cirreia, NRR
    inspection Program Branch, NRR (IPAS)                                                                                                                             !
R. Frahm, Jr., NRR
                                                                                                                                                                        l
inspection Program Branch, NRR (IPAS)
                                                                                                                                                                        l
DOCUMENT NAME: G:\\ BRANCH 5\\MY96-12.lNS
    DOCUMENT NAME: G:\ BRANCH 5\MY96-12.lNS
To receive a copy of this document, indicate in the box: 'C" = Copy without attachment / enclosure
    To receive a copy of this document, indicate in the box: 'C" = Copy without attachment / enclosure *E" = copy with attachment / enclosure
*E" = copy with attachment / enclosure
    *N* = No copy
*N* = No copy
      OFFICE         Rl/DRP                   ;        Rl/DRP                       Rl/DRP                   l                                                       !
OFFICE
                                                                                                                                                                        '
Rl/DRP
      NAME           WOlsen/g@ j                       JYerokun @                   RCor}te         hj
Rl/DRP
      DATE           12{,/96 /'               fL 12/4/96 P' Q                       12/c/96       ,
Rl/DRP
                                                                                                      '
;
                                                                                                            f
l
                                                        OFFICIAL RECORD COPY
'
NAME
WOlsen/g@ j
JYerokun @
RCor}te
hj
DATE
12{,/96 /'
fL 12/4/96 P' Q
12/c/96
f
'
,
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 02:00, 12 December 2024

Forwards Insp Rept 50-309/96-12 on 960915-1026 & Notice of Violation
ML20135F541
Person / Time
Site: Maine Yankee
Issue date: 12/09/1996
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Frizzle C
Maine Yankee
Shared Package
ML20135F544 List:
References
NUDOCS 9612130113
Download: ML20135F541 (3)


See also: IR 05000309/1996012

Text

_- _ . _ _

_ _ _

_

__

. _ _ _ _ _ _ ._

_ _ . - _ .- . _ _ _ - - -

- . - _

-

,

i

.

t

i

i

December 9,1996

Mr. Charles D. Frizzle

e

President

Maine Yankee Atomic Power Company

329 Bath Road

Brunswick, Maine 04011

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-309/96-12

(NOTICE OF VIOLATION)

Dear Mr. Frizzle:

On October 26,1996, the NRC completed an inspection at your Maine Yankee reactor

facility. The results of that inspection were discussed with Messrs. G. Leitch, D. Whittier,

R. Blackmore, and others of your staff at an exit meting held on October 31,1996. The

enclosed report presents the results of tFat inspection.

I

During the 6-week period covered by this inspection period, your conduct of activities at the

Maine Yankee facilities was safety focused. However, we continue to note plant material

condition problems challenging operator performance.

Based on the results of this inspection, two apparent violations were identified. The

violations involved failure to maintain the primary vent stack sampling system operable

during maintenance on October 4,1996, and failure to properly control safeguards

information on October 17,1996.

These violations are cited in the enclosed Notice of Violation, and the circumstances

surrounding the violations are described in detail in the enclosed report. Please note that

you are required to respond to this !etter and should follow the instructions specified in the

enclosed Notice when preparing ycur response. The NRC will use your response, in part, to

determine whethe. further enforcement action is necessary to ensure compliance with

regulatory requirements.

.

\\\\!'

/\\

,

,

9612130113 961209

PDR

ADOCK 05000309

G

PDR

j

. - _ -

-

.

=. .. - _ _ . - .

..

.

.

._ -.-._. .

- -

-

--

-

'

..

.

l

.

.

4

Mr. Charles D. Frizzle

2

1

l

i

>

2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosure will be placed in the NRC Public Document Room.

,

l

Sincerely,

i

!

Original Signed By:

Richard Conte, Chief

Reactor Projects Branch No. 5

Division of Reactor Projects

I

Docket No: 50-309

License No: DRP-36

4

4

Enclosure: NRC Inspection Report No. 50-309/96-12

!

cc w/ encl-

'

G. Leitch, Vice President, Operations

i

J. M. Block, Attorney at Law

l

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

)

j

R. Blackmore, Plant Manager

)

L. Diehl, Manager of Public and Governmental Affairs

l

J. A. Ritsher, Attorney (Ropes and Gray)

P. Dostie, State Nuclear Safety inspector

]

P. Brann, Assistant Attorney General

l

'

U. Vanags, State Nuclear Safety Advisor

C. Brinkman, Combustion Engineering, Inc.

4

'

W. D. Meinert, Nuclear Engineer

'

First Selectmen of Wiscasset

i

Maine State Planning Officer - Nuclear Safety Advisor

j

'

State of Maine, SLO Designee

4

State Planning Officer - Executive Department

]

i

Friends of the Coast

\\

.

1

1

i

,

.

i

!

,..,,_

_

. = _

_

_ _ . . - .

__

.

.

_

. - _ _

.

.

.

- _ _ _ _ _ . _ _ _ _ .

_ _

..

.

.

Mr. Charles D. Frizzle

3

Distribution w/ encl.

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC

NRC Resident inspector

D. Screnci, PAO

OE (2) (EA Packages Only)

R. Conte, DRP

H. Eichenholz, DRP

C. O'Daniell, DRP

Distribution w/ encl (VIA E-MAIL):

W. Dean, OEDO

S. Varga, Director,1/11, DRPE, NRR

D. Dorman, LPM, NRR

R. Cirreia, NRR

R. Frahm, Jr., NRR

inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\\ BRANCH 5\\MY96-12.lNS

To receive a copy of this document, indicate in the box: 'C" = Copy without attachment / enclosure

  • E" = copy with attachment / enclosure
  • N* = No copy

OFFICE

Rl/DRP

Rl/DRP

Rl/DRP

l

'

NAME

WOlsen/g@ j

JYerokun @

RCor}te

hj

DATE

12{,/96 /'

fL 12/4/96 P' Q

12/c/96

f

'

,

OFFICIAL RECORD COPY