ML20140C679: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:-       -_   . .   - . . _ - - -.             . - --. ---.             -. - - .- - - -           _. - - .
{{#Wiki_filter:-
  .
-_
    ,
. .
- . . _ - - -.
. - --. ---.
-. - - .- - - -
_. - - .
.
,
; ..
; ..
.
.
                                                      June 5,1997
June 5,1997
l
l
i.
i.
i
i
'-
' -
            Mr. Michael B. Sellman
Mr. Michael B. Sellman
i           President
i
President
Maine Yankee Atomic Power Company
,
,
            Maine Yankee Atomic Power Company
j
j            329 Bath Road .                                                                                       l
329 Bath Road .
            Brunswick, Maine 04011                                                                               j
Brunswick, Maine 04011
;.                                                                                                                 1
j
.'           SUBJECT:       NRC INTEGRATED INSPECTION REPORT 50-309/97-03                                         ;
;.
1
.'
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-309/97-03
i
'
Dear Mr. Sellman:
'
'
                                                                                                                  i
.
                                                                                                                  '
.           Dear Mr. Sellman:
i
i
!           On April 26,1997, the NRC completed an inspection at your Maine Yankee reactor facility.             {
!
.           The results of that inspection were discussed with Messrs. G. Leitch, R. Blackmore, and
On April 26,1997, the NRC completed an inspection at your Maine Yankee reactor facility.
i           others of your staff at an exit meeting held on May 2,1997. The enclosed report presents
{
I           .the results of that inspection.                                                                       l
.
!                                                                                                                 1
The results of that inspection were discussed with Messrs. G. Leitch, R. Blackmore, and
L.           During this 6-week inspection, the NRC observed that the conduct of activities at the
i
others of your staff at an exit meeting held on May 2,1997. The enclosed report presents
I
.the results of that inspection.
!
1
L.
During this 6-week inspection, the NRC observed that the conduct of activities at the
4
4
            Maine Yankee facility was safety focused. Operators were generally focused on safety
Maine Yankee facility was safety focused. Operators were generally focused on safety
!           and properly operated the systems required to maintain the plant in safe shutdown.
!
.            However, we are concerned about a problem that occurred during the period involving an
and properly operated the systems required to maintain the plant in safe shutdown.
;           operator error during the conduct of a test. Specifically, the operator erroneously started a
However, we are concerned about a problem that occurred during the period involving an
j           low pressure safety injection pump instead of a containment spray pump as required by the             !
.
;
operator error during the conduct of a test. Specifically, the operator erroneously started a
j
low pressure safety injection pump instead of a containment spray pump as required by the
i
i
            test procedure. While the error itself was of minor consequence, the performance of the
test procedure. While the error itself was of minor consequence, the performance of the
I           licensed and senior licensed operators in response to the event was weak. Poor
I
!           communications and weak command and control resulted in the failure to stop the test in
licensed and senior licensed operators in response to the event was weak. Poor
                                                                            .
!
j            violation of your administrative procedures. Further, additional human performance errors
communications and weak command and control resulted in the failure to stop the test in
i.           were identified during this inspection period involving testing of the residual heat removal
j
!           system valves and, control of contamination at the plant. These examples, when
violation of your administrative procedures. Further, additional human performance errors
i-           combined with similar problems identified in the recent past, indicates the need for
.
j           continued strong management attention.
i.
;           The violation is cited in the enclosed Notice of Violation, and the circumstances
were identified during this inspection period involving testing of the residual heat removal
j           surrounding the violation'is described in detail in the enclosed report. Please note that you
!
system valves and, control of contamination at the plant. These examples, when
i-
combined with similar problems identified in the recent past, indicates the need for
j
continued strong management attention.
;
The violation is cited in the enclosed Notice of Violation, and the circumstances
j
surrounding the violation'is described in detail in the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the
a
a
'
'
            are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
            enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
            to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
            regulatory requirements.
g ot
                                                                                                g ot
\\
                                                                                                          \
\\
                                                                                                                \
\\
                                                                          \                     ~
~
i
i
        9706100025 970605                 P
9706100025 970605
:       PDR       ADOCK 05000309
P
*
:
        G                        PM      ,
PDR
                                                                    _         -
ADOCK 05000309
G
PM
*
,
.-
_
-
-
-
._. _
.


          . _           ~.       ~ . - _ _ _ _ _ _ _ . _ . . _ . _ . _ . _ . . _ . . _ . _ ~._. ._. _ _ .. ______..._. .
. _
        .
~.
      s
~
    .
. - _ _ _ _ _ _ _ . _ . . _ . _ . _ . _ . . _ . . _ . _ ~._. ._. _ _ .. ______..._. .
                                                                                                                                '
.
              Michael B. Sellman                                               2
s
.
'
Michael B. Sellman
2
t
t
i
i
              in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter .
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter .
i             and its enclosure will be placed in the NRC Public Document Room.
i
and its enclosure will be placed in the NRC Public Document Room.
$
$
l                                                                                     Sincerely,
l
j                                                                                     ORIGINAL SIGNED BY:
Sincerely,
)                                                                                     Curtis J. Cowgill, lll                   1
j
.                                                                                      Projects Branch 5
ORIGINAL SIGNED BY:
.                                                                                       Division of Reactor Projects
)
Curtis J. Cowgill, lll
1
Projects Branch 5
.
.
Division of Reactor Projects
:
:
1
1
Docket No:
50-309
,
,
              Docket No:      50-309                                                                                            :
License No: DRP-36
              License No: DRP-36
$
$             Enclosures:     1.   Appendix A Notice of Violation                                                             !
Enclosures:
                              2.   NRC Inspection Report No. 50-309/97-03                                                     l
1.
                                                                                                                                l
Appendix A Notice of Violation
              cc w/encis:                                                                                                       i
2.
              B. Blackmore, Acting Vice Prasident, Operations / Plant Manager                                                   j
NRC Inspection Report No. 50-309/97-03
cc w/encis:
i
B. Blackmore, Acting Vice Prasident, Operations / Plant Manager
j
M. Meisner, Vice President, Licensing and Regulatory Compliance
-
-
'
'
              M. Meisner, Vice President, Licensing and Regulatory Compliance
R. Fraser, Acting Vice President, Engineering
              R. Fraser, Acting Vice President, Engineering
J. M. Block, Attorney at Law
,            J. M. Block, Attorney at Law
,
{.           P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
{.
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
L. Diehl, Manager of Public and Governmental Affairs
'
'
              L. Diehl, Manager of Public and Governmental Affairs
J. A. Ritsher, Attorney (Ropes and Gray)
              J. A. Ritsher, Attorney (Ropes and Gray)
;            P. Dostie, State Nuclear Safety inspector
!            P. Brann, Assistant Attorney General
;
;
              U. Vanags, State Nuclear Safety Advisor
P. Dostie, State Nuclear Safety inspector
              C. Brinkman, Combustion Engineering, Inc.
!
'.           W. D. Meinert, Nuclear Engineer
P. Brann, Assistant Attorney General
!             First Selectmen of Wiscasset
;
:             Maine State Planning Officer - Nuclear Safety Advisor
U. Vanags, State Nuclear Safety Advisor
*             State of Maine, SLO Designee
C. Brinkman, Combustion Engineering, Inc.
              State Planning Officer - Executive Department
'.
              Friends of the Coast
W. D. Meinert, Nuclear Engineer
!
First Selectmen of Wiscasset
:
Maine State Planning Officer - Nuclear Safety Advisor
*
State of Maine, SLO Designee
State Planning Officer - Executive Department
]
]
Friends of the Coast
4
4
$
$
Line 134: Line 204:
i
i
.
.
  t
t
:
:
2
2
1.
1.
l
l
!
!.
i
.-
.
-.
.
.
i                          .-                                                          .                                  -. .


                                --       -             ._ _         -   _
--
    .
-
  .
._ _
  .
-
      Michael B. Sellman                               3
_
                                                                                  i
.
      Distribution w/encis:
.
      Region I Docket Room (with concurrences)                                   l
.
      Nuclear Safety Information Center (NSIC)                                   j
Michael B. Sellman
      PUBLIC
3
                                                                                  l
i
      NRC Resident inspector                                                     i
Distribution w/encis:
      D. Screnci, PAO                                                             I
Region I Docket Room (with concurrences)
      W. Axelson, DRA
Nuclear Safety Information Center (NSIC)
      C. Cowgill, DRP
j
      R. Summers, DRP                                                             j
PUBLIC
      D. Bearde, DRP                                                             l
NRC Resident inspector
                                                                                  l
D. Screnci, PAO
                                                                                  I
W. Axelson, DRA
                                                                                  1
C. Cowgill, DRP
                                                                                  l
R. Summers, DRP
      Distribution w/encls (VIA E-MAIL):                                         I
j
      W. Dean, OEDC                                                               l
D. Bearde, DRP
      S. Varga, Director,1/11, DRPE, NRR                                         !
l
      D. Dorman, LPM, NRR
Distribution w/encls (VIA E-MAIL):
      M. Callahan, OCA                                                           l
W. Dean, OEDC
      R. Correia, NRR                                                             !
S. Varga, Director,1/11, DRPE, NRR
D. Dorman, LPM, NRR
M. Callahan, OCA
R. Correia, NRR
F. Talbot, NRR
'
'
      F. Talbot, NRR                                                              l
D. Screnci, PAO
      D. Screnci, PAO                                                             l
N. Sheehan, PAO
      N. Sheehan, PAO
Inspection Program Branch, NRR (IPAS)
      Inspection Program Branch, NRR (IPAS)                                       l
t
t
't
't
      DOCUMENT NAME: G:\ BRANCH 5\MY9703. INS
DOCUMENT NAME: G:\\ BRANCH 5\\MY9703. INS
      To receive a copy 9f this document, indicate in the box: "C" = Copy without
To receive a copy 9 this document, indicate in the box: "C" = Copy without
      attachment /soclospre "E" = Copy with atfachment/enclosuyp "N" = No copy
f
        OFFICE     Rl/QRf             Rl/DRP ///[JV           Rl/DRP ///[f
attachment /soclospre
        NAME       Rasnyussen         Yerokurt I,J ,
"E" = Copy with atfachment/enclosuyp
                                                      '
"N" = No copy
                                                              Cowgill V / , ,
OFFICE
        DATE       5//9K             EH97 [f f g/ty)         M /f/ ( p; 7
Rl/QRf
                                        OFFICIAL RECORD COPY               / /'
Rl/DRP ///[JV
                    /
Rl/DRP ///[f
NAME
Rasnyussen
Yerokurt I,J
,
Cowgill V /
'
, ,
DATE
5//9K
EH97 [f f g/ty)
M /f/ ( p; 7
/
OFFICIAL RECORD COPY
/ /'
}}
}}

Latest revision as of 17:07, 11 December 2024

Forwards Insp Rept 50-309/97-03 on 970316-0426 & Notice of Violation.Concerns Expressed Re Problem That Occurred During Period Involving Operator Error During Conduct of Test of LPSI Pump Instead of Containment Spray Pump
ML20140C679
Person / Time
Site: Maine Yankee
Issue date: 06/05/1997
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sellman M
Maine Yankee
Shared Package
ML20140C683 List:
References
50-309-97-03, 50-309-97-3, NUDOCS 9706100025
Download: ML20140C679 (3)


See also: IR 05000309/1997003

Text

-

-_

. .

- . . _ - - -.

. - --. ---.

-. - - .- - - -

_. - - .

.

,

..

.

June 5,1997

l

i.

i

' -

Mr. Michael B. Sellman

i

President

Maine Yankee Atomic Power Company

,

j

329 Bath Road .

Brunswick, Maine 04011

j

.

1

.'

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-309/97-03

i

'

Dear Mr. Sellman:

'

.

i

!

On April 26,1997, the NRC completed an inspection at your Maine Yankee reactor facility.

{

.

The results of that inspection were discussed with Messrs. G. Leitch, R. Blackmore, and

i

others of your staff at an exit meeting held on May 2,1997. The enclosed report presents

I

.the results of that inspection.

!

1

L.

During this 6-week inspection, the NRC observed that the conduct of activities at the

4

Maine Yankee facility was safety focused. Operators were generally focused on safety

!

and properly operated the systems required to maintain the plant in safe shutdown.

However, we are concerned about a problem that occurred during the period involving an

.

operator error during the conduct of a test. Specifically, the operator erroneously started a

j

low pressure safety injection pump instead of a containment spray pump as required by the

i

test procedure. While the error itself was of minor consequence, the performance of the

I

licensed and senior licensed operators in response to the event was weak. Poor

!

communications and weak command and control resulted in the failure to stop the test in

j

violation of your administrative procedures. Further, additional human performance errors

.

i.

were identified during this inspection period involving testing of the residual heat removal

!

system valves and, control of contamination at the plant. These examples, when

i-

combined with similar problems identified in the recent past, indicates the need for

j

continued strong management attention.

The violation is cited in the enclosed Notice of Violation, and the circumstances

j

surrounding the violation'is described in detail in the enclosed report. Please note that you

are required to respond to this letter and should follow the instructions specified in the

a

'

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

g ot

\\

\\

\\

~

i

9706100025 970605

P

PDR

ADOCK 05000309

G

PM

,

.-

_

-

-

-

._. _

.

. _

~.

~

. - _ _ _ _ _ _ _ . _ . . _ . _ . _ . _ . . _ . . _ . _ ~._. ._. _ _ .. ______..._. .

.

s

.

'

Michael B. Sellman

2

t

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter .

i

and its enclosure will be placed in the NRC Public Document Room.

$

l

Sincerely,

j

ORIGINAL SIGNED BY:

)

Curtis J. Cowgill, lll

1

Projects Branch 5

.

.

Division of Reactor Projects

1

Docket No:

50-309

,

License No: DRP-36

$

Enclosures:

1.

Appendix A Notice of Violation

2.

NRC Inspection Report No. 50-309/97-03

cc w/encis:

i

B. Blackmore, Acting Vice Prasident, Operations / Plant Manager

j

M. Meisner, Vice President, Licensing and Regulatory Compliance

-

'

R. Fraser, Acting Vice President, Engineering

J. M. Block, Attorney at Law

,

{.

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

L. Diehl, Manager of Public and Governmental Affairs

'

J. A. Ritsher, Attorney (Ropes and Gray)

P. Dostie, State Nuclear Safety inspector

!

P. Brann, Assistant Attorney General

U. Vanags, State Nuclear Safety Advisor

C. Brinkman, Combustion Engineering, Inc.

'.

W. D. Meinert, Nuclear Engineer

!

First Selectmen of Wiscasset

Maine State Planning Officer - Nuclear Safety Advisor

State of Maine, SLO Designee

State Planning Officer - Executive Department

]

Friends of the Coast

4

$

1

i

.

t

2

1.

l

!.

i

.-

.

-.

.

--

-

._ _

-

_

.

.

.

Michael B. Sellman

3

i

Distribution w/encis:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

j

PUBLIC

NRC Resident inspector

D. Screnci, PAO

W. Axelson, DRA

C. Cowgill, DRP

R. Summers, DRP

j

D. Bearde, DRP

l

Distribution w/encls (VIA E-MAIL):

W. Dean, OEDC

S. Varga, Director,1/11, DRPE, NRR

D. Dorman, LPM, NRR

M. Callahan, OCA

R. Correia, NRR

F. Talbot, NRR

'

D. Screnci, PAO

N. Sheehan, PAO

Inspection Program Branch, NRR (IPAS)

t

't

DOCUMENT NAME: G:\\ BRANCH 5\\MY9703. INS

To receive a copy 9 this document, indicate in the box: "C" = Copy without

f

attachment /soclospre

"E" = Copy with atfachment/enclosuyp

"N" = No copy

OFFICE

Rl/QRf

Rl/DRP ///[JV

Rl/DRP ///[f

NAME

Rasnyussen

Yerokurt I,J

,

Cowgill V /

'

, ,

DATE

5//9K

EH97 [f f g/ty)

M /f/ ( p; 7

/

OFFICIAL RECORD COPY

/ /'