November 15, 1996 | |||
: | : | ||
i | i | ||
; | ; | ||
i | i | ||
Mr. H. G. Stanley | |||
Site Vice President | |||
+ | + | ||
Braidwood Nuclear Power Station | |||
; | |||
; | Commonwealth Edison Company | ||
R. R. #1, Box 84 | |||
. | . | ||
Braceville, IL 60407 | |||
- | - | ||
: | : | ||
i | i | ||
SUBJECT: | |||
} | 'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 . | ||
456/96015(DRS); 50-457/96015(DRS) | |||
} | |||
Dear Mr. Stanley: | |||
, | , | ||
l | l | ||
This refers to the inspection completed.on October 18,1996 at your Braidwood facility. | |||
; | ;- | ||
The enclosed report presents the results of that inspection. | |||
;l | ; | ||
-This insp'ection included an announced review of the licensee's radiation monitoring | |||
system, the control room and auxiliary building filtered Heating, Ventilation, and Air- | |||
;l | |||
Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms. | |||
Special emphasis was placed on operability, and material condition of these systems. . In | |||
i | |||
addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted. | |||
- | - | ||
ll | |||
This inspection noted that the material condition of the radioactive waste tank rooms was . | |||
j | j | ||
good as evidenced by adequate housekeeping in the areas, minimal contaminated area, | |||
i | |||
! | and the low number of outstanding work request items for the equipment in these rooms. | ||
Likewise the HVAC systems inspected were free of debris and found in good working | |||
! | |||
order. | |||
The radiation monitors inspected were in good working order and appropriate corrective | |||
actions were being implemented for the' four monitors which exhibit recurring operability | |||
t | t | ||
; | |||
problems. However, the inspection identified that the basis document for the alarm set | |||
i | i | ||
point calculations for these monitors was informally controlled. | |||
* | * | ||
. | |||
This inspection also noted that good radiological controls were being provided by the | |||
radiation protection (RP) organization for work activities ongoing during the Unit 1 mid- | |||
,, | ,, | ||
' | |||
cycle outage. However, a review of the work control process noted a communication | |||
deficiency which contributes to issues not being evaluated or discussed until the final | |||
stages of the planning process, especially for short lead time activities. | |||
l | l | ||
!' | !' | ||
No violations of NRC requirements were identifie'd during this inspection. | |||
;. | ;. | ||
- | |||
1 | 1 | ||
I | |||
i- | |||
9611220285 961115 | |||
' | ' | ||
PDR | |||
ADOCK 05000456 | |||
G | |||
_PDR | |||
- | - | ||
: | : | ||
7 | 7 | ||
1 | 1 | ||
_. | |||
. | |||
_ . . _ . _ . | |||
_ | |||
i | _ | ||
__ | |||
4 | |||
I | |||
i | |||
H. Stanley | |||
-2 | |||
November 15, 1996 | |||
. | . | ||
. | . | ||
. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter | |||
and the enclosures will be placed in the NRC Public Document Room (PDR). | |||
Sincerely, | |||
, | , | ||
Original Signed by Brent Clayton (for) | |||
Geoffrey E. Grant, Director | |||
Division of Reactor Safety | |||
i | |||
Docket Nos. 50-456; 50-457 | |||
Licenses No. NPF-72; NPF-77 | |||
Enclosure: | |||
Inspection Reports No. | |||
50-456/96015(DRS); | |||
- | - | ||
50-457/96015(DRS) | |||
' | ' | ||
cc w/ encl: | |||
D. A. Sager, Vice President, | |||
Generation Support | |||
H. W. Keiser, Chief Nuclear | |||
Operating Officer | |||
T. Tulon, Station Manager | |||
T. Simpken, Regulatory Assurance | |||
Supervisor | |||
1. Johnson, Acting Nuclear | |||
Regulatory Services Manager | |||
Document Control Desk - Licensing | |||
Richard Hubbard | |||
Nathan Schloss, Economist, | |||
, | |||
Office of the Attorney General | |||
State Liaison Officer | |||
Chairman, Illinois Commerce Commission | |||
, | |||
Distribution: | |||
Docket File w/ encl | |||
Rill PRR w/enci | |||
W. L. Axelson, Rlli w/ encl | |||
PUBLIC:p w/ encl | |||
SRis, Braidwood, Byron, | |||
Enf. Coordinator, Rlll w/enci | |||
OC/LFDCB w/enci | |||
Zion w/ encl | |||
RAC1 w/ encl (E-mail) | |||
I | |||
DRP w/enci | |||
LPM, NRR w/ encl | |||
CAA1 w/enci (E-mail) | |||
DRS w/enci | |||
A. B. Beach, Allt w/enci | |||
, p<h | |||
/ | |||
DOCUMENT NAME: G:DRS\\ BRA 96015.DRS | |||
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure | |||
'E" = Copy with attachment / enclosure | |||
"N* = No copy | |||
, | |||
TFl& | |||
RIII | |||
RIIl | |||
_ lN RIII | |||
////h | |||
f_ | |||
RIII | |||
/6(- | |||
l6 | |||
NS/E | |||
PLouden:jp7 W | |||
TKozak-T_. - | |||
RLanksUh V | |||
BClayton/Wrant | |||
DATE | |||
11/01/96 P | |||
11/ 8 /96 | |||
11/13 i966 | |||
11/ IY /96 | |||
& | |||
lCIAL FEDO GP( | |||
}} | }} | ||
Latest revision as of 03:41, 12 December 2024
| ML20134M237 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/15/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stanley H COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20134M240 | List: |
| References | |
| NUDOCS 9611220285 | |
| Download: ML20134M237 (2) | |
See also: IR 05000456/1996015
Text
,
_ . _ _ _ _ _ _ . . _ _
._ _ . . _ . _
__ . _ _
_
._
_
l
i
.
,
n,
-
s
v
November 15, 1996
i
i
Mr. H. G. Stanley
Site Vice President
+
Braidwood Nuclear Power Station
Commonwealth Edison Company
R. R. #1, Box 84
.
Braceville, IL 60407
-
i
SUBJECT:
'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .
456/96015(DRS); 50-457/96015(DRS)
}
Dear Mr. Stanley:
,
l
This refers to the inspection completed.on October 18,1996 at your Braidwood facility.
- -
The enclosed report presents the results of that inspection.
-This insp'ection included an announced review of the licensee's radiation monitoring
system, the control room and auxiliary building filtered Heating, Ventilation, and Air-
- l
Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms.
Special emphasis was placed on operability, and material condition of these systems. . In
i
addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.
-
ll
This inspection noted that the material condition of the radioactive waste tank rooms was .
j
good as evidenced by adequate housekeeping in the areas, minimal contaminated area,
i
and the low number of outstanding work request items for the equipment in these rooms.
Likewise the HVAC systems inspected were free of debris and found in good working
!
order.
The radiation monitors inspected were in good working order and appropriate corrective
actions were being implemented for the' four monitors which exhibit recurring operability
t
problems. However, the inspection identified that the basis document for the alarm set
i
point calculations for these monitors was informally controlled.
.
This inspection also noted that good radiological controls were being provided by the
radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-
,,
'
cycle outage. However, a review of the work control process noted a communication
deficiency which contributes to issues not being evaluated or discussed until the final
stages of the planning process, especially for short lead time activities.
l
!'
No violations of NRC requirements were identifie'd during this inspection.
- .
-
1
I
i-
9611220285 961115
'
ADOCK 05000456
G
_PDR
-
7
1
_.
.
_ . . _ . _ .
_
_
__
4
I
i
H. Stanley
-2
November 15, 1996
.
.
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
,
Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
i
Docket Nos. 50-456; 50-457
Enclosure:
Inspection Reports No.
50-456/96015(DRS);
-
50-457/96015(DRS)
'
cc w/ encl:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
Operating Officer
T. Tulon, Station Manager
T. Simpken, Regulatory Assurance
Supervisor
1. Johnson, Acting Nuclear
Regulatory Services Manager
Document Control Desk - Licensing
Richard Hubbard
Nathan Schloss, Economist,
,
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
,
Distribution:
Docket File w/ encl
Rill PRR w/enci
W. L. Axelson, Rlli w/ encl
PUBLIC:p w/ encl
SRis, Braidwood, Byron,
Enf. Coordinator, Rlll w/enci
OC/LFDCB w/enci
Zion w/ encl
RAC1 w/ encl (E-mail)
I
DRP w/enci
LPM, NRR w/ encl
CAA1 w/enci (E-mail)
DRS w/enci
A. B. Beach, Allt w/enci
, p<h
/
DOCUMENT NAME: G:DRS\\ BRA 96015.DRS
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure
"N* = No copy
,
TFl&
RIII
RIIl
_ lN RIII
////h
f_
RIII
/6(-
l6
NS/E
PLouden:jp7 W
TKozak-T_. -
RLanksUh V
BClayton/Wrant
DATE
11/01/96 P
11/ 8 /96
11/13 i966
11/ IY /96
&
lCIAL FEDO GP(