ML20141A526: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-     _      ._.      - _.                  .-      ..- - .- - -.  -_
{{#Wiki_filter:-
O Boetors Enanus i                                               Pilgrim Nuclear Power Station   10CFR50.54 ENCLOSURE CONTAINS                     Plymouth,       ch     02360-5599 SAFEGUA R 03 (NFORM ATION UPON SEPAF,NTtON THIS l
O Boetors Enanus i
Pilgrim Nuclear Power Station 10CFR50.54 ENCLOSURE CONTAINS
: Plymouth, ch 02360-5599 SAFEGUA R 03 (NFORM ATION UPON SEPAF,NTtON THIS l
PAGE IS DECONTROLLED l
PAGE IS DECONTROLLED l
June 6, 1997 I
June 6, 1997 I
BECo Ltr. # 2.97.058 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 l                                                                              License No. DPR-35 l           .         
BECo Ltr. # 2.97.058 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 l
l


==Subject:==
==Subject:==
Security Plan Revision 13A l
Security Plan Revision 13A l
l     In accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 13A of the l
l In accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 13A of the l
Pilgrim Nuclear Power Station Security Plan. This revision includes changes to Section 4.2,
Pilgrim Nuclear Power Station Security Plan. This revision includes changes to Section 4.2,
!      ' Vehicle Barrier System' and 5.2.2, ' Vital Area Access Control'. These changes were reviewed and approved by the Operations Review Committee, and they do not reduce the safeguards effectiveness of the plan. If additionalinformation is required, please contact Mr. J. Neal, Protective Services Department Manager (508) 830-8788, or Mr. T. Campbell, Security Services Supervisor (508) 830-8477.
' Vehicle Barrier System' and 5.2.2, ' Vital Area Access Control'. These changes were reviewed and approved by the Operations Review Committee, and they do not reduce the safeguards effectiveness of the plan. If additionalinformation is required, please contact Mr. J. Neal, Protective Services Department Manager (508) 830-8788, or Mr. T. Campbell, Security Services Supervisor (508) 830-8477.
b N.L.Desmond RAH /dmc/secpp13A l
b N.L.Desmond RAH /dmc/secpp13A l
t     cc:     Mr. Alan B. Wang, Project Manager Project Directorate 1-3                                                 NM MGUARDS Office of Nuclear Reactor Regulation                     INFORMATION.UPON SEPARATION Mail Stop:<WF 1482                                         THIS PAGE IS DECONTROLLED.
t cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-3 NM MGUARDS Office of Nuclear Reactor Regulation INFORMATION.UPON SEPARATION Mail Stop:<WF 1482 THIS PAGE IS DECONTROLLED.
U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike
U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike
(               Rockville, MD 20852 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 4
(
475 Allendale Road
Rockville, MD 20852 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road 4
.              King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station                                                       g             -
King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station g-( fF h h'$fNhff
                                      ^                                              ~-
~-
                                                                                          -(k fF 9706230062 970606 PDR     ADOCK 05000293                             h h'$fNhff '
k
F                      PDR       -}}
^
9706230062 970606 PDR ADOCK 05000293 F
PDR
-}}

Latest revision as of 16:01, 11 December 2024

Forwards Rev 13A of Pilgrim Nuclear Power Station Security Plan.Plan Withheld
ML20141A526
Person / Time
Site: Pilgrim
Issue date: 06/06/1997
From: Desmond N
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.97.058, NUDOCS 9706230062
Download: ML20141A526 (1)


Text

-

O Boetors Enanus i

Pilgrim Nuclear Power Station 10CFR50.54 ENCLOSURE CONTAINS

Plymouth, ch 02360-5599 SAFEGUA R 03 (NFORM ATION UPON SEPAF,NTtON THIS l

PAGE IS DECONTROLLED l

June 6, 1997 I

BECo Ltr. # 2.97.058 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 l

l

Subject:

Security Plan Revision 13A l

l In accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 13A of the l

Pilgrim Nuclear Power Station Security Plan. This revision includes changes to Section 4.2,

' Vehicle Barrier System' and 5.2.2, ' Vital Area Access Control'. These changes were reviewed and approved by the Operations Review Committee, and they do not reduce the safeguards effectiveness of the plan. If additionalinformation is required, please contact Mr. J. Neal, Protective Services Department Manager (508) 830-8788, or Mr. T. Campbell, Security Services Supervisor (508) 830-8477.

b N.L.Desmond RAH /dmc/secpp13A l

t cc:

Mr. Alan B. Wang, Project Manager Project Directorate 1-3 NM MGUARDS Office of Nuclear Reactor Regulation INFORMATION.UPON SEPARATION Mail Stop:<WF 1482 THIS PAGE IS DECONTROLLED.

U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike

(

Rockville, MD 20852 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road 4

King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station g-( fF h h'$fNhff

~-

k

^

9706230062 970606 PDR ADOCK 05000293 F

PDR

-