ML20141A526
| ML20141A526 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/06/1997 |
| From: | Desmond N BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BECO-2.97.058, NUDOCS 9706230062 | |
| Download: ML20141A526 (1) | |
Text
-
O Boetors Enanus i
Pilgrim Nuclear Power Station 10CFR50.54 ENCLOSURE CONTAINS
- Plymouth, ch 02360-5599 SAFEGUA R 03 (NFORM ATION UPON SEPAF,NTtON THIS l
PAGE IS DECONTROLLED l
June 6, 1997 I
BECo Ltr. # 2.97.058 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 l
l
Subject:
Security Plan Revision 13A l
l In accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 13A of the l
Pilgrim Nuclear Power Station Security Plan. This revision includes changes to Section 4.2,
' Vehicle Barrier System' and 5.2.2, ' Vital Area Access Control'. These changes were reviewed and approved by the Operations Review Committee, and they do not reduce the safeguards effectiveness of the plan. If additionalinformation is required, please contact Mr. J. Neal, Protective Services Department Manager (508) 830-8788, or Mr. T. Campbell, Security Services Supervisor (508) 830-8477.
b N.L.Desmond RAH /dmc/secpp13A l
t cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-3 NM MGUARDS Office of Nuclear Reactor Regulation INFORMATION.UPON SEPARATION Mail Stop:<WF 1482 THIS PAGE IS DECONTROLLED.
U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike
(
Rockville, MD 20852 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road 4
King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station g-( fF h h'$fNhff
~-
k
^
9706230062 970606 PDR ADOCK 05000293 F
-