ML20148M820: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- ... - ..   . -. - - .                 .. -.-
{{#Wiki_filter:- ... - ..
    A
. -. - - .
                                                                                                  Pu Mic
.. -.-
.,                                                                                                                             ;
Pu Mic
'*'
A
    *
;
                                                                                                X - C/                       ,
.,' * '
                                                                                                                                \
X - C/
                                                                                                                              >
,
                                                                                                                              ~
\\
                                            June 16, 1997
*
      Mr. Lew W. Myers
>
      Vice President - Nuclear
~
      Centerior Service Company
June 16, 1997
      P. O. Box 97, A2OO
Mr. Lew W. Myers
      Perry, OH 44081
Vice President - Nuclear
      SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
Centerior Service Company
      Dear Mr. Myers:
P. O. Box 97, A2OO
      On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
Perry, OH 44081
      facility. The purpose of the inspection was to determine whether activities authorized by.
SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
      the license were conducted safely and in accordance with NRC requirements. During this
Dear Mr. Myers:
      period routine resident inspections were performed. At the conclusion of the inspection,
On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
      the findings were discussed with members of your staff. The enclosed report presents the
facility. The purpose of the inspection was to determine whether activities authorized by.
      results of that inspection.
the license were conducted safely and in accordance with NRC requirements. During this
      During this 6-week inspection period an unexpected partial reactor trip signal and partial
period routine resident inspections were performed. At the conclusion of the inspection,
      containment isolation occurred with the plant at full power. Overall, operations performed
the findings were discussed with members of your staff. The enclosed report presents the
      well, with specific improvements noted in many shift and evolution briefings. Some long
results of that inspection.
      standing equipment problems contributed to additional operation distractions, especially in
During this 6-week inspection period an unexpected partial reactor trip signal and partial
      the residual heat removal system. In addition, poor procedures were involved in an
containment isolation occurred with the plant at full power. Overall, operations performed
      operational transient which caused reactor recirculation flow control values to partially
well, with specific improvements noted in many shift and evolution briefings. Some long
      close.
standing equipment problems contributed to additional operation distractions, especially in
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
the residual heat removal system. In addition, poor procedures were involved in an
      and the enclosures will be placed in the NRC Public Document Room (PDR).
operational transient which caused reactor recirculation flow control values to partially
                                            Sincerely,
close.
                                                                                                                                i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                                      /s/ R. N. Gardner for
and the enclosures will be placed in the NRC Public Document Room (PDR).
                                            Geoffrey E. Grant, Director
Sincerely,
                                            Division of Reactor Projects
i
                                                                                                                                ;
/s/
      Docket No. 50-440                                                                                       -
R. N. Gardner for
                                                                                                                                l
Geoffrey E. Grant, Director
      License No. NPF-58                                                                                     !I               j
Division of Reactor Projects
      Enclosure: Inspection Report 50-440/97004                                                                               j
Docket No. 50-440
      97 62 g [                o                                    If8I8 B,fh,hflffll^
-
      .
License No. NPF-58
                                                          _ - . . , _ _ . .       . , ~ _,           .._.._m  _ _ _         I
!I
j
Enclosure: Inspection Report 50-440/97004
j
If8I8 B,fh,hflffll^
97 62 g [
o
.
..
_ - . . , _ _ . .
. , ~
_,
.. .. m
_ _ _
.
I


    - _ __ _..___ . - . . _ . - . . . . _ _ . _ . . . _ _ -                                 . . _ _ _ _ _ . . . _ _ _ . . _ _ . . - _ . _ _ _ . . . _ _ _ . _
- _ __ _..___ . - . . _ . - . . . . _ _ . _ . . . _ _ -
  *
. . _ _ _ _ _ . . . _ _ _ . . _ _ . . - _ . _ _ _ . . . _ _ _ . _
*
.
.
5*
5*
'
'
. -
-
                          L. W. Myers                                                         -2-
.
l
L. W. Myers
-2-
!
l
l
cc w/ encl:
H. L. Hegrat, Manager,
!
!
l                          cc w/ encl:                      H. L. Hegrat, Manager,
Regulatory Affairs
!                                                            Regulatory Affairs
'
'
                                                            W. R, Kanda, Director, Quality and
W. R, Kanda, Director, Quality and
i                                                             Personnel Development
i
;                                                           J. J. Powers, Director,
Personnel Development
;                                                             Nuclear Engineering Department
;
J. J. Powers, Director,
;
Nuclear Engineering Department
I
I
                                                            R. D. Brandt, General Manager,
R. D. Brandt, General Manager,
i                                                             Nuclear Power Plant Department
i
l                                                           Terry J. Lodge, Esq.
Nuclear Power Plant Department
f                                                             State Liaison Officer, State of Ohio
l
Terry J. Lodge, Esq.
f
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
'
'
                                                            Robert E. Owen, Ohio
Departrnent of Health
                                                              Departrnent of Health
i
i                                                           C. A. Glazer, State of Ohio
C. A. Glazer, State of Ohio
Public Utilities Commission
)
)
                                                              Public Utilities Commission
i
i
i                         Distribution:
i
i                         Docket File w/enci                                                               SRI Perry w/enci
Distribution:
3                         PUBLIC IE-01 w/enci                                                               DRP w/enci
i
j                         OC/LFDCB w/enci                                                                   Rlli PRR w/enci
Docket File w/enci
SRI Perry w/enci
3
PUBLIC IE-01 w/enci
DRP w/enci
j
OC/LFDCB w/enci
Rlli PRR w/enci
Project Manager, NRR w/ encl
CAA1 w/ encl (E-mail)
*
*
                          Project Manager, NRR w/ encl                                                      CAA1 w/ encl (E-mail)
A. B. Beach, w/enct
                          A. B. Beach, w/enct                                                               Rlli Enf. Coordinator, w/ enc!                             l
Rlli Enf. Coordinator, w/ enc!
                          Deputy RA, w/enci                                                                 DRS (2) w/enci                                             l
Deputy RA, w/enci
                          TSS w/enci                                                                       J. Lieberman, OE w/ encl
DRS (2) w/enci
                          J. Goldberg, OGC w/ encl                                                         R. Zimmerman, NRR w/enci
TSS w/enci
                                                                                                                                                                        l
J. Lieberman, OE w/ encl
                                                                                                                                                                        .
J. Goldberg, OGC w/ encl
                                                                                                                                                                        ;
R. Zimmerman, NRR w/enci
                                                                                                                                                                        i
.
                                                                                                                                                                        i
;
                          DOCUMENT NAME: R:\l N S PR PTS \PO W E R S\PER R\PE R 97004. D R P
i
                          To receive a copy of this document, indicate in the box "C" = Copy without attach / encl
i
                          "E" = Copy with attach /enci "N" = No copy
DOCUMENT NAME: R:\\l N S PR PTS \\PO W E R S\\PER R\\PE R 97004. D R P
                              OFFICE                   Rlli mg           /V   Rlll                 d       Rlli                             Rill             N
To receive a copy of this document, indicate in the box "C" = Copy without attach / encl
                              NAME                     SchwNnz/co               Miller         Vl1             '" z = --g fj                     Grant         Wh
"E" = Copy with attach /enci "N" = No copy
                                                                                                    I
OFFICE
                              DATE                     6///97                   6/g /97                       6/ /97                           6////97
Rlli mg
                                                                                  OFFICIAL RECORD COPY
/V
                  . _,                         __                           . _
Rlll
                                                                                      . . _                        -                             _ _ , - _ . _.     .
d
Rlli
Rill
N
NAME
SchwNnz/co
Miller
Vl1
'" z = --g fj
Grant Wh
I
DATE
6///97
6/g /97
6/ /97
6////97
OFFICIAL RECORD COPY
. _,
__
.
_
. .
-
_ _ , - _ . _.
.


  __ .                       . _ _ _ _             .   _ . - . . _ _ , . _ . _ . . _ . . . . _ . . . _ _ _ . _ . . _ _ . _ _ _ . _ .               _m . _ _ _ ..
__ .
;         4 .
. _ _ _ _
4..     .                                                                                                                                                           !
.
_ . - . . _ _ , . _ . _ . . _ . . . . _ . . . _ _ _ . _ . . _ _ . _ _ _ . _ .
_m
. _ _ _ ..
;
4 .
4..
!
.
,
,
                                                                                                                                                                    '
'
:
:
;                                                                                                                                                                   i
;
        -
i
,                                                                                                                                                                   l
-
1                                                                                                                                                                   .
,
1
.
3
3
                                                                                                                                                                    4
4
]                                                                                                   June 16, 1997
]
                                                                                                                                                                    ;
June 16, 1997
                                                                                                                                                                    !
;
J                                                                                                                                                                     l
!
1
J
*                                                                                                                                                                   !
l
1
!
*
Mr. Lew W. Myers
i
"
"
                                    Mr. Lew W. Myers                                                                                                                  i
Vice President - Nuclear
                                  Vice President - Nuclear                                                                                                         '
'
.        ,                        Centerior Service Company                                                                                                         l
Centerior Service Company
.
,
4
4
                                    P. O. G6x 97, A200                                                                                                                 l
P. O. G6x 97, A200
;                                  Perry, OH 44081
Perry, OH 44081
;
4-
4-
j                                   SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
j
SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
:
:
!                                  Dear Mr. Myers:
!
!
.                                   On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
Dear Mr. Myers:
l                                   facility. The purpose of the inspection was to determine whether activities authorized by
!
j                                   the license were conducted safely and in accordance with NRC requirements. During this
On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
,                                  period routine resident inspections were performed. At the conclusion of the inspection,
.
:                                   the findings were discussed with members of your staff. The enclosed report presents the
l
j                                   results of that inspection.
facility. The purpose of the inspection was to determine whether activities authorized by
j
the license were conducted safely and in accordance with NRC requirements. During this
period routine resident inspections were performed. At the conclusion of the inspection,
,
:
the findings were discussed with members of your staff. The enclosed report presents the
j
results of that inspection.
1
1
                                    During this 6-week inspection period an unexpected partial reactor trip signal and partial
During this 6-week inspection period an unexpected partial reactor trip signal and partial
!                                   containment isolation occurred with the plant at full power. Overall, operations performed
!
I                                   well, with specific improvements noted in many shift and evolution briefings. Some long
containment isolation occurred with the plant at full power. Overall, operations performed
!                                   standing equipment problems contributed to additional operation distractions, especially in
I
j                                   the residual heat removal system. In addition, poor procedures were involved in an
well, with specific improvements noted in many shift and evolution briefings. Some long
!                                 ' operational transient which caused reactor recirculation flow control values to partially
!
l                                   close.                                                                                                                           )
standing equipment problems contributed to additional operation distractions, especially in
j                                   In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
j
j.                                 and the enclosures will be placed in the NRC Public Document Room (PDR).
the residual heat removal system. In addition, poor procedures were involved in an
!
' operational transient which caused reactor recirculation flow control values to partially
l
close.
)
j
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
j.
and the enclosures will be placed in the NRC Public Document Room (PDR).
:
:
                                                                                                  Sincerely,                                                         {
Sincerely,
{
'
'
                                                                                                                                                                      !
1
1                                                                                                                                                                      ,
,
i
i
                                                                                          /s/ R. N. Gardner for
/s/
R. N. Gardner for
i
i
!                                                                                                 Geoffrey E. Grant, Director
!
:                                                                                                 Division of Reactor Projects
Geoffrey E. Grant, Director
:
Division of Reactor Projects
i'
i'
I
I
2
2
                                    DocSst No. 50-440                                                                                                               !
DocSst No. 50-440
                                    License No. NPF-58                                                                                                               j
!
                                    Enclosure: Inspection Report 50-440/97004
License No. NPF-58
,                                                                                                                                                                   ;
j
                                                                                                                                                                      ,
Enclosure: Inspection Report 50-440/97004
1
,
;
1
,
i
i
;
;
*             . _ _ _ , . . .,             ,                   . _ . _ . . . _ - _ _ , .           _ _ _
*
                                                                                                                              _        .. ._. -- _- _
. _ _ _ , . . .,
,
. _ . _ . . . _ - _ _ , .
_ _ _
..
. .
--
_-
_


          - . - . - - - _ - . . -- .- . - -                               -.   .-..,-. -
- . - . - - - _ - . . -- .- . - -
                                                                                                _-..- ... - .- . _ . -
-.
.-..,-.
_-..- ... - .- . _ . -
-
.
.
.
.
  L. W. Myers                                             -2-
L. W. Myers
  cc w/ encl:           H. L. Hegrat, Manager,
-2-
                          Regulatory Affairs
cc w/ encl:
                      W. R, Kanda, Director, Quality and
H. L. Hegrat, Manager,
                          Personnel Development
Regulatory Affairs
                      J. J. Powers, Director,
W. R, Kanda, Director, Quality and
                          Nuclear Engineering Department
Personnel Development
                        R. D. Brandt, General Manager,
J. J. Powers, Director,
                          Nuclear Power Plant Department
Nuclear Engineering Department
                      Terry J. Lodge, Esq.
R. D. Brandt, General Manager,
                          State Liaison Officer, State of Ohio
Nuclear Power Plant Department
                        Robert E. Owen, Ohio
Terry J. Lodge, Esq.
                          Department of Health
State Liaison Officer, State of Ohio
                        C. A. Glazer, State of Ohio
Robert E. Owen, Ohio
                          Public Utilities Commission
Department of Health
  Distribution:
C. A. Glazer, State of Ohio
  Docket File w/enci                                             SRI Perry w/ enc;
Public Utilities Commission
  PUBLIC IE-01 w/ encl                                           DRP w/ encl                                           j
Distribution:
  OC/LFDCB w/ encl                                               Rill PRR w/enci                                       l
Docket File w/enci
  Project Manager, NRR w/enct                                     CAA1 w/enci(E-mail)                                   j
SRI Perry w/ enc;
  A. B. Beach, w/enci                                             Rlli Enf. Coordinator, w/enci                         i
PUBLIC IE-01 w/ encl
  Deputy RA, w/ encl                                             DRS (2) w/enct
DRP w/ encl
  TSS_ w/enci                                                     J. Lieberman, OE w/enci                               ;
j
  J. Goldberg, OGC w/ enc!                                       R. Zimmerman, NRR w/enci                               i
OC/LFDCB w/ encl
                                                                                                                        l
Rill PRR w/enci
                                                                                                                        !
Project Manager, NRR w/enct
                                                                                                                        !
CAA1 w/enci(E-mail)
                                                                                                                        i
j
                                                                                                                        l
A. B. Beach, w/enci
                                                                                                                        l
Rlli Enf. Coordinator, w/enci
  DOCUMENT NAME: R:\lN S PR PTS \POWE R S\PE R R\PE R 97004.D R P
i
  To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
Deputy RA, w/ encl
  "E" = Copy with attach /enci "N" = No copy
DRS (2) w/enct
    OFFICE           Rill ,,n/)             /Y Rlli           d   Rlll                 Rlli                       N
TSS_ w/enci
    NAME             SchwNnz/co                 Miller     b&]       '" zww               Grant         DN
J. Lieberman, OE w/enci
                                                              I                                                         !
J. Goldberg, OGC w/ enc!
    DATE            6/4/97                     6/ fy /97           6/ /97               6/k/97
R. Zimmerman, NRR w/enci
                                                OFFICIAL RECORD COPY
i
                                                                                                                        I
i
l
DOCUMENT NAME: R:\\lN S PR PTS \\POWE R S\\PE R R\\PE R 97004.D R P
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rill ,,n/)
/Y
Rlli
d
Rlll
Rlli
N
NAME
SchwNnz/co
Miller
b&]
'" zww
Grant DN
I
6/ y /97
6/ /97
6/k/97
DATE
6/4/97
f
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 10:59, 11 December 2024

Forwards Insp Rept 50-440/97-04 on 970322-0502.No Violations Noted.Insp Was to Determine Whether Activities Authorized by License Were Conducted Safely & IAW NRC Requirements
ML20148M820
Person / Time
Site: Perry 
Issue date: 06/16/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20148M825 List:
References
50-440-97-04, 50-440-97-4, NUDOCS 9706250226
Download: ML20148M820 (4)


See also: IR 05000440/1997004

Text

- ... - ..

. -. - - .

.. -.-

Pu Mic

A

.,' * '

X - C/

,

\\

>

~

June 16, 1997

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P. O. Box 97, A2OO

Perry, OH 44081

SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004

Dear Mr. Myers:

On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor

facility. The purpose of the inspection was to determine whether activities authorized by.

the license were conducted safely and in accordance with NRC requirements. During this

period routine resident inspections were performed. At the conclusion of the inspection,

the findings were discussed with members of your staff. The enclosed report presents the

results of that inspection.

During this 6-week inspection period an unexpected partial reactor trip signal and partial

containment isolation occurred with the plant at full power. Overall, operations performed

well, with specific improvements noted in many shift and evolution briefings. Some long

standing equipment problems contributed to additional operation distractions, especially in

the residual heat removal system. In addition, poor procedures were involved in an

operational transient which caused reactor recirculation flow control values to partially

close.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

i

/s/

R. N. Gardner for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-440

-

License No. NPF-58

!I

j

Enclosure: Inspection Report 50-440/97004

j

If8I8 B,fh,hflffll^

97 62 g [

o

.

..

_ - . . , _ _ . .

. , ~

_,

.. .. m

_ _ _

.

I

- _ __ _..___ . - . . _ . - . . . . _ _ . _ . . . _ _ -

. . _ _ _ _ _ . . . _ _ _ . . _ _ . . - _ . _ _ _ . . . _ _ _ . _

.

5*

'

-

.

l

L. W. Myers

-2-

!

l

cc w/ encl:

H. L. Hegrat, Manager,

!

Regulatory Affairs

'

W. R, Kanda, Director, Quality and

i

Personnel Development

J. J. Powers, Director,

Nuclear Engineering Department

I

R. D. Brandt, General Manager,

i

Nuclear Power Plant Department

l

Terry J. Lodge, Esq.

f

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio

'

Departrnent of Health

i

C. A. Glazer, State of Ohio

Public Utilities Commission

)

i

i

Distribution:

i

Docket File w/enci

SRI Perry w/enci

3

PUBLIC IE-01 w/enci

DRP w/enci

j

OC/LFDCB w/enci

Rlli PRR w/enci

Project Manager, NRR w/ encl

CAA1 w/ encl (E-mail)

A. B. Beach, w/enct

Rlli Enf. Coordinator, w/ enc!

Deputy RA, w/enci

DRS (2) w/enci

TSS w/enci

J. Lieberman, OE w/ encl

J. Goldberg, OGC w/ encl

R. Zimmerman, NRR w/enci

.

i

i

DOCUMENT NAME: R:\\l N S PR PTS \\PO W E R S\\PER R\\PE R 97004. D R P

To receive a copy of this document, indicate in the box "C" = Copy without attach / encl

"E" = Copy with attach /enci "N" = No copy

OFFICE

Rlli mg

/V

Rlll

d

Rlli

Rill

N

NAME

SchwNnz/co

Miller

Vl1

'" z = --g fj

Grant Wh

I

DATE

6///97

6/g /97

6/ /97

6////97

OFFICIAL RECORD COPY

. _,

__

.

_

. .

-

_ _ , - _ . _.

.

__ .

. _ _ _ _

.

_ . - . . _ _ , . _ . _ . . _ . . . . _ . . . _ _ _ . _ . . _ _ . _ _ _ . _ .

_m

. _ _ _ ..

4 .

4..

!

.

,

'

i

-

,

1

.

3

4

]

June 16, 1997

!

J

l

1

!

Mr. Lew W. Myers

i

"

Vice President - Nuclear

'

Centerior Service Company

.

,

4

P. O. G6x 97, A200

Perry, OH 44081

4-

j

SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004

!

Dear Mr. Myers:

!

On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor

.

l

facility. The purpose of the inspection was to determine whether activities authorized by

j

the license were conducted safely and in accordance with NRC requirements. During this

period routine resident inspections were performed. At the conclusion of the inspection,

,

the findings were discussed with members of your staff. The enclosed report presents the

j

results of that inspection.

1

During this 6-week inspection period an unexpected partial reactor trip signal and partial

!

containment isolation occurred with the plant at full power. Overall, operations performed

I

well, with specific improvements noted in many shift and evolution briefings. Some long

!

standing equipment problems contributed to additional operation distractions, especially in

j

the residual heat removal system. In addition, poor procedures were involved in an

!

' operational transient which caused reactor recirculation flow control values to partially

l

close.

)

j

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

j.

and the enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

{

'

1

,

i

/s/

R. N. Gardner for

i

!

Geoffrey E. Grant, Director

Division of Reactor Projects

i'

I

2

DocSst No. 50-440

!

License No. NPF-58

j

Enclosure: Inspection Report 50-440/97004

,

1

,

i

. _ _ _ , . . .,

,

. _ . _ . . . _ - _ _ , .

_ _ _

..

. .

--

_-

_

- . - . - - - _ - . . -- .- . - -

-.

.-..,-.

_-..- ... - .- . _ . -

-

.

.

L. W. Myers

-2-

cc w/ encl:

H. L. Hegrat, Manager,

Regulatory Affairs

W. R, Kanda, Director, Quality and

Personnel Development

J. J. Powers, Director,

Nuclear Engineering Department

R. D. Brandt, General Manager,

Nuclear Power Plant Department

Terry J. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Distribution:

Docket File w/enci

SRI Perry w/ enc;

PUBLIC IE-01 w/ encl

DRP w/ encl

j

OC/LFDCB w/ encl

Rill PRR w/enci

Project Manager, NRR w/enct

CAA1 w/enci(E-mail)

j

A. B. Beach, w/enci

Rlli Enf. Coordinator, w/enci

i

Deputy RA, w/ encl

DRS (2) w/enct

TSS_ w/enci

J. Lieberman, OE w/enci

J. Goldberg, OGC w/ enc!

R. Zimmerman, NRR w/enci

i

i

l

DOCUMENT NAME: R:\\lN S PR PTS \\POWE R S\\PE R R\\PE R 97004.D R P

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /enci "N" = No copy

OFFICE

Rill ,,n/)

/Y

Rlli

d

Rlll

Rlli

N

NAME

SchwNnz/co

Miller

b&]

'" zww

Grant DN

I

6/ y /97

6/ /97

6/k/97

DATE

6/4/97

f

OFFICIAL RECORD COPY