Text
- ... - ..
. -. - - .
.. -.-
Pu Mic
A
.,' * '
X - C/
,
\\
>
~
June 16, 1997
Mr. Lew W. Myers
Vice President - Nuclear
Centerior Service Company
P. O. Box 97, A2OO
Perry, OH 44081
SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
Dear Mr. Myers:
On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
facility. The purpose of the inspection was to determine whether activities authorized by.
the license were conducted safely and in accordance with NRC requirements. During this
period routine resident inspections were performed. At the conclusion of the inspection,
the findings were discussed with members of your staff. The enclosed report presents the
results of that inspection.
During this 6-week inspection period an unexpected partial reactor trip signal and partial
containment isolation occurred with the plant at full power. Overall, operations performed
well, with specific improvements noted in many shift and evolution briefings. Some long
standing equipment problems contributed to additional operation distractions, especially in
the residual heat removal system. In addition, poor procedures were involved in an
operational transient which caused reactor recirculation flow control values to partially
close.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
i
/s/
R. N. Gardner for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No. 50-440
-
License No. NPF-58
!I
j
Enclosure: Inspection Report 50-440/97004
j
If8I8 B,fh,hflffll^
97 62 g [
o
.
..
_ - . . , _ _ . .
. , ~
_,
.. .. m
_ _ _
.
I
- _ __ _..___ . - . . _ . - . . . . _ _ . _ . . . _ _ -
. . _ _ _ _ _ . . . _ _ _ . . _ _ . . - _ . _ _ _ . . . _ _ _ . _
.
5*
'
-
.
l
L. W. Myers
-2-
!
l
cc w/ encl:
H. L. Hegrat, Manager,
!
Regulatory Affairs
'
W. R, Kanda, Director, Quality and
i
Personnel Development
J. J. Powers, Director,
Nuclear Engineering Department
I
R. D. Brandt, General Manager,
i
Nuclear Power Plant Department
l
Terry J. Lodge, Esq.
f
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
'
Departrnent of Health
i
C. A. Glazer, State of Ohio
Public Utilities Commission
)
i
i
Distribution:
i
Docket File w/enci
SRI Perry w/enci
3
PUBLIC IE-01 w/enci
DRP w/enci
j
OC/LFDCB w/enci
Rlli PRR w/enci
Project Manager, NRR w/ encl
CAA1 w/ encl (E-mail)
A. B. Beach, w/enct
Rlli Enf. Coordinator, w/ enc!
Deputy RA, w/enci
DRS (2) w/enci
TSS w/enci
J. Lieberman, OE w/ encl
J. Goldberg, OGC w/ encl
R. Zimmerman, NRR w/enci
.
i
i
DOCUMENT NAME: R:\\l N S PR PTS \\PO W E R S\\PER R\\PE R 97004. D R P
To receive a copy of this document, indicate in the box "C" = Copy without attach / encl
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlli mg
/V
Rlll
d
Rlli
Rill
N
NAME
SchwNnz/co
Miller
Vl1
'" z = --g fj
Grant Wh
I
DATE
6///97
6/g /97
6/ /97
6////97
OFFICIAL RECORD COPY
. _,
__
.
_
. .
-
_ _ , - _ . _.
.
__ .
. _ _ _ _
.
_ . - . . _ _ , . _ . _ . . _ . . . . _ . . . _ _ _ . _ . . _ _ . _ _ _ . _ .
_m
. _ _ _ ..
4 .
4..
!
.
,
'
i
-
,
1
.
3
4
]
June 16, 1997
!
J
l
1
!
Mr. Lew W. Myers
i
"
Vice President - Nuclear
'
Centerior Service Company
.
,
4
P. O. G6x 97, A200
Perry, OH 44081
4-
j
SUBJECT: NRC INSPECTION REPORT NO. 50-440/97004
!
Dear Mr. Myers:
!
On May 2,1997, the NRC completed a routine safety inspection at your Perry 1 reactor
.
l
facility. The purpose of the inspection was to determine whether activities authorized by
j
the license were conducted safely and in accordance with NRC requirements. During this
period routine resident inspections were performed. At the conclusion of the inspection,
,
the findings were discussed with members of your staff. The enclosed report presents the
j
results of that inspection.
1
During this 6-week inspection period an unexpected partial reactor trip signal and partial
!
containment isolation occurred with the plant at full power. Overall, operations performed
I
well, with specific improvements noted in many shift and evolution briefings. Some long
!
standing equipment problems contributed to additional operation distractions, especially in
j
the residual heat removal system. In addition, poor procedures were involved in an
!
' operational transient which caused reactor recirculation flow control values to partially
l
close.
)
j
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
j.
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
{
'
1
,
i
/s/
R. N. Gardner for
i
!
Geoffrey E. Grant, Director
Division of Reactor Projects
i'
I
2
DocSst No. 50-440
!
License No. NPF-58
j
Enclosure: Inspection Report 50-440/97004
,
1
,
i
. _ _ _ , . . .,
,
. _ . _ . . . _ - _ _ , .
_ _ _
..
. .
--
_-
_
- . - . - - - _ - . . -- .- . - -
-.
.-..,-.
_-..- ... - .- . _ . -
-
.
.
L. W. Myers
-2-
cc w/ encl:
H. L. Hegrat, Manager,
Regulatory Affairs
W. R, Kanda, Director, Quality and
Personnel Development
J. J. Powers, Director,
Nuclear Engineering Department
R. D. Brandt, General Manager,
Nuclear Power Plant Department
Terry J. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
Distribution:
Docket File w/enci
SRI Perry w/ enc;
PUBLIC IE-01 w/ encl
DRP w/ encl
j
OC/LFDCB w/ encl
Rill PRR w/enci
Project Manager, NRR w/enct
CAA1 w/enci(E-mail)
j
A. B. Beach, w/enci
Rlli Enf. Coordinator, w/enci
i
Deputy RA, w/ encl
DRS (2) w/enct
TSS_ w/enci
J. Lieberman, OE w/enci
J. Goldberg, OGC w/ enc!
R. Zimmerman, NRR w/enci
i
i
l
DOCUMENT NAME: R:\\lN S PR PTS \\POWE R S\\PE R R\\PE R 97004.D R P
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rill ,,n/)
/Y
Rlli
d
Rlll
Rlli
N
NAME
SchwNnz/co
Miller
b&]
'" zww
Grant DN
I
6/ y /97
6/ /97
6/k/97
DATE
6/4/97
f
OFFICIAL RECORD COPY