ML20134P811: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
NOTICE OF DEVIATION Commonwealth Edison Company | NOTICE OF DEVIATION Commonwealth Edison Company Docket Nos. 50-254; 50 265 Quad Cities Station License Nos. DPR-29; DPR-30 Cordova, Illinois During an NRC inspection conducted October 1 through November 6,1996, a deviation of your actions committed to in Licensee Event Reports 50-254/92008 and 50-265/92007 was identified. In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG-1600, the deviation is listed below: | ||
A. Quad Cities Licensee Event Reports 50-254/92008 and 50-265/92007, dated | A. | ||
Quad Cities Licensee Event Reports 50-254/92008 and 50-265/92007, dated j | |||
April 8 and April 5,1992, respectively, included a commitment to develop a procedure to trend and analyze residual heat removal (RHR) room cooler cooling water differential pressures. | |||
Contrary to the above, on October 3,1996, the inspectors identified that although a procedure to measure RHR room cooler cooling water differential pressures had been developed and implemented, a procedure to trend and analyze these differential pressures had not been developed or implemented. | Contrary to the above, on October 3,1996, the inspectors identified that although a procedure to measure RHR room cooler cooling water differential pressures had been developed and implemented, a procedure to trend and analyze these differential pressures had not been developed or implemented. | ||
Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy tc the Regional Administrator, Region lit, in writing within 30 days of the date of this Notice, (1) the reason for the deviation, or if contested, the basis of disputing the deviation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further deviations, and (4) the date wnen your corrective action will be completed. Where good cause is shown, consideration will be given to extending the response time. | Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy tc the Regional Administrator, Region lit, in writing within 30 days of the date of this Notice, (1) the reason for the deviation, or if contested, the basis of disputing the deviation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further deviations, and (4) the date wnen your corrective action will be completed. Where good cause is shown, consideration will be given to extending the response time. | ||
Dated at Lisle, Illinois this 22 day of November 1996 | |||
) | |||
9611290296 961122 | 9611290296 961122 F | ||
PDR ADOCK 05000254 0 | |||
PM}} | |||
Latest revision as of 03:09, 12 December 2024
| ML20134P811 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 11/22/1996 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20134P802 | List: |
| References | |
| 50-254-96-15, 50-265-96-15, NUDOCS 9611290296 | |
| Download: ML20134P811 (1) | |
Text
.
NOTICE OF DEVIATION Commonwealth Edison Company Docket Nos. 50-254; 50 265 Quad Cities Station License Nos. DPR-29; DPR-30 Cordova, Illinois During an NRC inspection conducted October 1 through November 6,1996, a deviation of your actions committed to in Licensee Event Reports 50-254/92008 and 50-265/92007 was identified. In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG-1600, the deviation is listed below:
A.
Quad Cities Licensee Event Reports 50-254/92008 and 50-265/92007, dated j
April 8 and April 5,1992, respectively, included a commitment to develop a procedure to trend and analyze residual heat removal (RHR) room cooler cooling water differential pressures.
Contrary to the above, on October 3,1996, the inspectors identified that although a procedure to measure RHR room cooler cooling water differential pressures had been developed and implemented, a procedure to trend and analyze these differential pressures had not been developed or implemented.
Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy tc the Regional Administrator, Region lit, in writing within 30 days of the date of this Notice, (1) the reason for the deviation, or if contested, the basis of disputing the deviation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further deviations, and (4) the date wnen your corrective action will be completed. Where good cause is shown, consideration will be given to extending the response time.
Dated at Lisle, Illinois this 22 day of November 1996
)
9611290296 961122 F
PDR ADOCK 05000254 0