1
9tM
.
November 2' ,1996
Z
Mr. E. Kraft
Site Vice President
Quad Cities Station
Commonwealth Edison Company
22710 206th Avenue North
Cordova, IL 61242
SUBJECT:
NRC SPECIAL INSPECTION REPORT NO. 50-254/96015(DRS);
50-265/96015(DRS) AND NOTICE OF DEVIATION
Dear Mr. Krefc:
On November 6,1996, the NRC completed an inspection at your Quad Cities Nuclear
Power Station fecility. The enclosed report presents the results of that inspection.
Based on the results of this inspection, certain of your activities, set forth in the enclosure
'
to this letter, appear to be a deviation from commitments which you have made in previous
correspondence with the Commission regarding the trending of residual heat removal room
cooler cooling water differential pressure. A written response is requested.
Equipment trending weaknesses were also identified in a recent Engineering and Technical
Support inspection. Because equipment performance monitoring is an important method to
monitor potential degradation in the materiel condition of plant systems, weaknesses in
this ared identified in this report and in previous inspections warrant your attention.
In addition, we are concerned about the difference between conclusions reached regarding
the safety significance of undersized thermal overloads identified in the control room
ventilation system at your facility and the Dresden facility. As a result, we request that
you provide us, within 60 days of receipt of this letter, the results of a reassessment of the
safety significance of this issue and a justification for differences, if any, between the two
facilities.
Please note that you are requested to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
I 1
%
9611290289 961122
ADOCK 05000254
G
J
!
'
E. Kraft
-2-
November 22, 1996
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Roorn.
Sincerely,
Original Signed by Prent Cla.vton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket Nos. 50-254:50-265
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
No. 50-254/96015(DRS);
50-265/96015(DRS)
cc w/encls:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
Operating Officer
L. W. Pearce, Station Manager
N. Chrissotimos, Regulatory
j
Assurance Supervisor
C. C. Peterson, Regulatory Affairs
Manager
1. Johnson, Acting Nuclear
Regulatory Services Manager
Document Control Desk - Licensing
Richard Hubbard
'
i
Nathan Schloss, Economist,
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
J. R. Bull, Vice President, General &
Transm.ssion, MidAmerican Energy Company
Distribution:
Docket File w/encls
Rlli PRR w/encls
A. B. Beach, Rlli w/encls
PUBLIC IE-01 w/encls
SRis, Quad Cities,
Enf. Coordinator, Rlll w/encls
OC/LFDCB w/encls
Dresden, LaSalle w/encls
RAC1 w/encls (E-mail)
DRP w/encls
W. Axelson, Rlll w/encls
CAA1 w/encls (E-mail)
DRS w/encls
LPM, NRR w/encls
DOCUMENT NAME: G:\\DRS\\QUA96015.DRS
To receive a copy of this document, Indicate in the box *C" = Copy without attachment / enclosure *E' = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rlll
,G
Rill
l4 Rlli
lM
Rlll
gc_
lf
,
NAME
EDuncan:nty#h%(# MRingfy{4' *
PHiland ptg
HClayton/GGrant
DATE
114q!96
11/6/96
1149/96
11/n/96
OFFICIAL RECORD COPY