ML20137F030: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
RECEIVEC' Arizona Nuclear Power Project | RECEIVEC' Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 August 13, 1985lM5 /0319 Pl{ l: 47 ANPP-33207-TDS/TPS | ||
P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 | ~ | ||
August 13, 1985lM5 /0319 Pl{ l: 47 ANPP-33207-TDS/TPS | REGiONyt&E | ||
~~ | |||
U. S. Nuclear Regulatory Cmmission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attentiota Mr. D. F. Kirsch, Acting Director Division of Reactor Safety & Projects | |||
REGiONyt&E U. S. Nuclear Regulatory Cmmission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attentiota Mr. D. F. Kirsch, Acting Director Division of Reactor Safety & Projects | |||
==Subject:== | ==Subject:== | ||
| Line 31: | Line 30: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference A and an Interim Report was transmitted by Reference B. | The NRC was notified of a potentially reportable deficiency in Reference A and an Interim Report was transmitted by Reference B. | ||
At that time it was estimated that a Final Report would be available by August 14, 1985. | At that time it was estimated that a Final Report would be available by August 14, 1985. | ||
| Line 37: | Line 35: | ||
There is no new information or change to the Interim Report at this time. | There is no new information or change to the Interim Report at this time. | ||
Very truly yours,- | Very truly yours,- | ||
t Ctzt a LLL E. E. Van Brunt, Jr. | |||
Executive Vice President Project Director EEVB/TPS/nj cc: See Page Two 8508260130 850813 PDR | Executive Vice President Project Director EEVB/TPS/nj cc: See Page Two 8508260130 850813 PDR ADOCK 05000528 3 0 i | ||
Ib,-{1 | |||
.(, | |||
e ANPP-33207-TDS/TPS August 13, 1985 | e ANPP-33207-TDS/TPS August 13, 1985 | ||
- Mr. D. F. Kirsch DER 85-23 Page Two cc: | |||
L. A. Souza D. E. Fowler T. D. Shriver-C. N. Russo B. S. Kaplan J. R. Bynun J. M. Allen D. Canady A. C. Gehr W.~J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D.' Foster D. R. Hawkinson R. P. Zinmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Powr Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | Richard DeYoung, Director Office of Inspection end Enforcement U. S. Nuclear Regulatary Ccmaission Washington, D. C. | ||
20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver-C. N. Russo B. S. Kaplan J. R. Bynun J. M. Allen D. Canady A. C. Gehr W.~J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D.' Foster D. R. Hawkinson R. P. Zinmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Powr Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | |||
'}} | |||
Latest revision as of 00:43, 12 December 2024
| ML20137F030 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/13/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-33207-TDS, DER-85-23, NUDOCS 8508260130 | |
| Download: ML20137F030 (2) | |
Text
{{#Wiki_filter:- RECEIVEC' Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 August 13, 1985lM5 /0319 Pl{ l: 47 ANPP-33207-TDS/TPS ~ REGiONyt&E ~~ U. S. Nuclear Regulatory Cmmission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attentiota Mr. D. F. Kirsch, Acting Director Division of Reactor Safety & Projects
Subject:
Time Extension.for Report - DER 85-23 A 50.55(e) Potentially Reportable Deficiency Relating To Diesel Generator Start Failure Due To Mechanical Valve Failure File: 85-019-026; D.4.33.2
Reference:
A) Telephone conversation between Jo Bianch, Office of D. F. Kirsch, and P. Coffin on June 7,1985 B) ANPP-32999, dated July 10, 1985 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference A and an Interim Report was transmitted by Reference B. At that time it was estimated that a Final Report would be available by August 14, 1985. Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 6, 1985, at which time a complete report will be subnitted. There is no new information or change to the Interim Report at this time. Very truly yours,- t Ctzt a LLL E. E. Van Brunt, Jr. Executive Vice President Project Director EEVB/TPS/nj cc: See Page Two 8508260130 850813 PDR ADOCK 05000528 3 0 i Ib,-{1
.(, e ANPP-33207-TDS/TPS August 13, 1985 - Mr. D. F. Kirsch DER 85-23 Page Two cc: Richard DeYoung, Director Office of Inspection end Enforcement U. S. Nuclear Regulatary Ccmaission Washington, D. C. 20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver-C. N. Russo B. S. Kaplan J. R. Bynun J. M. Allen D. Canady A. C. Gehr W.~J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D.' Foster D. R. Hawkinson R. P. Zinmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Powr Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 '}}