gy' Enclosure to Serial: RSEP/83-886 7 age 1 of 3 UPERATING DATA REPORT | gy' Enclosure to Serial: RSEP/83-886 7 age 1 of 3 UPERATING DATA REPORT 1 | ||
DOCKET NO. 050-0261 DATE 07/03/03 COMPLETED BY H. | |||
RAY NORRIS 1Em.EPh0NE (003)3H3-4524 OPERAT1NG STATUS 1. | |||
UNIT ffAME: ROBINSON UNIT 2 l NOTES I | |||
: 2. REPOR TING PERIOD: JUNE | : 2. REPOR TING PERIOD: JUNE 83 1 | ||
3. | |||
LICENSED THERMAL POWER (MWT) | |||
G. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 1HPU 7) SINCE LAST REPORT, | '.' 3 0 0 l There are presently 157 spent l | ||
4.. NAMEPLATE RAlING.(GROSS MWE) 73Y.0 I fuel assemblies in the spent l | |||
S. | |||
: 10. REASONS FOR RESTRICTION JF ANY | DESIGN ELECTRICAL RATING (NET MWE) 700,0 i fuel pool l | ||
1 THIS | 6. | ||
: 12. NUMDER OF HOURS REACTOR CR1TICAL | MAX DEPENDADLE CAPACITY (GROS? MWE) 700.0 l l | ||
1 7. | |||
: 14. HGURS GENERATOR ON'LINE | MAX DEPENDADLE CAPACITY (HET MWE) 66S.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | - - - - - - - - - - - - ~ - - | ||
: 10. NET ELEC. ENERGY GENERATED (hWH) | G. | ||
: 19. UN]l SERVICE FACTOR | IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 1HPU 7) SINCE LAST REPORT, GIVE REASONS No change 9. | ||
: 20. UN.IT AVAILABILITY FACTOR | POWER LEVEL 10 UHICH RESTOICTED IF ANY (NET MUE) 1955 N t reactor power | ||
: 21. UNIT CAP. FACTOR (USING MDC NEl) | : 10. REASONS FOR RESTRICTION JF ANY Although the unit is not restricted by any out-side agency, the power level is presently reduced due to Steam Generator considerations. | ||
: 22. UNIT CAP. FACTOR (USING DER NET) | 1 THIS YR TU CUMUL r10N1 H DATE A~1IVE i1. HOURS IN REPORTING PERIOD 720.00 4343.00 108v29.00 | ||
: 23. UNIf FORCED OUTAGE RATE | : 12. NUMDER OF HOURS REACTOR CR1TICAL 720.00 3561.10 D0400.07 13-REAC10R RESERVE SHUIDOWN HRS | ||
.00 295.02 1603.59 | |||
: 14. HGURS GENERATOR ON'LINE 713.33 3451.45 78207.49 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 100 | |||
.00 23.20 j 16. GROSS THERMAL ENERGY GEN. (t1WH) 127i3SS.36 604200V.81 156d06601.36 i 'l. GROSS ELEC.-ENERGY GEN. (MWH) 402199.00 1936066.00 S0444829.00 | |||
: 10. NET ELEC. ENERGY GENERATED (hWH) 370136.00 1810250.00 47602360.00 | |||
: 19. UN]l SERVICE FACTOR 99.07 79.47 72.47 | |||
: 20. UN.IT AVAILABILITY FACTOR 99.07 79.47 72.49 | |||
: 21. UNIT CAP. FACTOR (USING MDC NEl) 70.90 62.40 66.37 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) 75.03 59.SS 63.05 | |||
: 23. UNIf FORCED OUTAGE RATE | |||
.93 5.35 13.86 | |||
: 24. SHulDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) | : 24. SHulDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) | ||
Type 2, October 6, 1983, four week Steam Generator Inspection Outage. | Type 2, October 6, 1983, four week Steam Generator Inspection Outage. | ||
: 25. IF SHUTDOWN AT END UF REPORT PERIOD,- ESTIMATED DATE OF START UP On line | |||
: 26. UNITS IN TEST ST ATUS (PR10R TO COMMERCIAL OPERATION)- FORCAST | : 26. UNITS IN TEST ST ATUS (PR10R TO COMMERCIAL OPERATION)- FORCAST ACHElVED INITIAL CRITICALIlY INITIAL ELECTRICITY T - -- | ||
INITIAL ELECTRICITY | T- - | ||
COMMERCIAL OPERATION | s COMMERCIAL OPERATION T- - | ||
8307130059 830708 PDR ADDCK 05000261 R | T-- -- | ||
8307130059 830708 PDR ADDCK 05000261 R | |||
PDR 1.16 a 9 sg | |||
I'~ | I'~ | ||
_A,a.-M- | _A,a.-M-mg. | ||
1 | .nm-Ae | ||
. - = - | |||
K4 | |||
A V F P A G I.'. lifiI L Y i TIUE R L E Vf.! | -4 | ||
l D O C:: E 1 N!) ; 0':.0-0261 | } | ||
ild! i R 0 P I N::U f! LIN I i' | 4- | ||
' ~'=' | |||
C UiiP EIED i t 't ii. h (i ) N Oi&' ! a I E.L Ei'Hui E ( 00 3 )'m ' di | 1 | ||
.. -P 2 cf 3 o' bt'e* c8a | |||
[ | ) | ||
f^, | g, | ||
( M F - f 1 f.' i ) | \\ | ||
f, F 'i 'l' H D ! ? | |||
l' A V F P A G I.'. lifiI L Y i TIUE R L E Vf.! | |||
l D O C:: E 1 N!) ; 0':.0-0261 ild! i R 0 P I N::U f! LIN I i' t | |||
u/ | IM iE O~l/Ob/P.3 1 | ||
C UiiP EIED i t 't ii. h (i ) N Oi&' ! a I E.L Ei'Hui E ( 00 3 )'m ' di J4 l | |||
4 | JUNE. | ||
tY03 i, | |||
Ik l | |||
. s I., | |||
o | I k., | ||
-f, | |||
i, i | .,A [ | ||
'1 | [$ | ||
30 t | .,. [ },k, f t, | ||
[, | |||
f^, | |||
( M F - f 1 f.' i ) | |||
( NUE-(D I) | |||
) | |||
e S | |||
/ | |||
g f | |||
'74 4 10 | |||
'. 4 0 1 | |||
u/ | |||
4 | |||
} | |||
4 | |||
'4,, | |||
*6 S | |||
_; 4 3 ij | |||
'.K 5 | |||
'] | |||
I, J 'I 5'l i f/ | |||
43 | |||
< o ') | |||
i o | |||
v. | |||
n n | |||
')) | |||
i, i | |||
'1 3 '' | |||
' ~, ' | |||
30 i | |||
t | |||
[ $ 4. | |||
.,a | |||
: n.., | |||
J.),.- | |||
n | n | ||
.i i3 | |||
';.i ^. > | |||
2u T | |||
14 | |||
) n.' | |||
y | |||
-.; h l'i* | |||
%s i6 | |||
:) 4 (.* | |||
f l | f l | ||
l 1 i6 - O i | l 1 i6 - O i | ||
1 1 | 1 1 | ||
s s. | s s. | ||
'O | |||
DOCKET NO. | UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
50-261 s,. | |||
UNIT NAME H. B.1bbinson DATE 830701 y | |||
DATE 830701 | REPORT MONTH June COMPLETED BY H. Rav Norris j | ||
TELEPHONE 803-383-4524 to u | |||
E | E L | ||
w | |||
.5 ? | |||
3 | |||
).E b | |||
Licensee | |||
,E t, o% | |||
Cause & Corrective No-Date i | |||
3: | |||
jj5 Event g7 93 Action to H | |||
y 3 ;ji = | |||
Report a mV 5' | |||
Prevent Recurrence g | Prevent Recurrence g | ||
o | u o | ||
06-01 | 06-01 830601 S | ||
HB | 0 A | ||
4 HB HTEXCH Power reduction to approximately 80% | |||
due to Steam Generator considerations. | due to Steam Generator considerations. | ||
06-02 | 06-02 830622 F | ||
I | 6.67 A | ||
E-Operator Training & License Examination F. Administrative | 4 CB PIPEXX Faulty pipe fitting'n the loop 3 flow o | ||
transmitter's high pressure sid2 iso-lation valve. The fitting was re-placed. The reactor rmained critical during the shutdown. | |||
I 2 | |||
3 4 | |||
F: Forced Reason: | |||
Method: | |||
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Seram. | |||
Event Report (LER) Fde (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) | |||
E-Operator Training & License Examination F. Administrative 5 | |||
G-Operational Error (Explain) | |||
Exhibit I - Same Source (9/77) | |||
Il-Other (Explain) | |||
I sg | I sg | ||
s ee ea9 .g CP&L Carolina Power & Light Company H. B.10BINSCN STEAM ELECTRIC PI1NT POST OFFICE BOX 790 IIARTSVIILE, SOUTH CAROLINA 29550 | s ee ea9 | ||
.g CP&L Carolina Power & Light Company H. B.10BINSCN STEAM ELECTRIC PI1NT POST OFFICE BOX 790 IIARTSVIILE, SOUTH CAROLINA 29550 | |||
'JUL 81983 Robinson File No: | |||
15505 Serial: RSEP/83-886 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcanent U. S. Nuclear Regulatory Cm mission Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 FENTHLY OPERATIONS REPORT | |||
==Dear Mr. DeYoung:== | ==Dear Mr. DeYoung:== | ||
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Com' herewith subnits the report of operation statistics and shutdown experience for the month of June,1983. | In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Com' herewith subnits the report of operation statistics and shutdown experience for the month of June,1983. | ||
Very truly yours, | Very truly yours, | ||
/sa | |||
/#t/R.B.S key, Jr. | |||
General Manager H. B. Robinson S.E. Plant HRN/sg Enclosure cc: | |||
R. A. Hartfield (2) | |||
J. P. O'Reilly (1) 6 1 I | J. P. O'Reilly (1) 6 1 I | ||
_.}} | _.}} | ||
Latest revision as of 04:55, 15 December 2024
| ML20072L151 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/08/1983 |
| From: | Norris H, Starkey R CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RSEP-83-886, NUDOCS 8307130059 | |
| Download: ML20072L151 (4) | |
Text
-.
gy' Enclosure to Serial: RSEP/83-886 7 age 1 of 3 UPERATING DATA REPORT 1
DOCKET NO. 050-0261 DATE 07/03/03 COMPLETED BY H.
RAY NORRIS 1Em.EPh0NE (003)3H3-4524 OPERAT1NG STATUS 1.
UNIT ffAME: ROBINSON UNIT 2 l NOTES I
- 2. REPOR TING PERIOD: JUNE 83 1
3.
LICENSED THERMAL POWER (MWT)
'.' 3 0 0 l There are presently 157 spent l
4.. NAMEPLATE RAlING.(GROSS MWE) 73Y.0 I fuel assemblies in the spent l
S.
DESIGN ELECTRICAL RATING (NET MWE) 700,0 i fuel pool l
6.
MAX DEPENDADLE CAPACITY (GROS? MWE) 700.0 l l
1 7.
MAX DEPENDADLE CAPACITY (HET MWE) 66S.0
- - - - - - - - - - - - ~ - -
G.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 1HPU 7) SINCE LAST REPORT, GIVE REASONS No change 9.
POWER LEVEL 10 UHICH RESTOICTED IF ANY (NET MUE) 1955 N t reactor power
- 10. REASONS FOR RESTRICTION JF ANY Although the unit is not restricted by any out-side agency, the power level is presently reduced due to Steam Generator considerations.
1 THIS YR TU CUMUL r10N1 H DATE A~1IVE i1. HOURS IN REPORTING PERIOD 720.00 4343.00 108v29.00
- 12. NUMDER OF HOURS REACTOR CR1TICAL 720.00 3561.10 D0400.07 13-REAC10R RESERVE SHUIDOWN HRS
.00 295.02 1603.59
- 14. HGURS GENERATOR ON'LINE 713.33 3451.45 78207.49
- 15. UNIT RESERVE SHUTDOWN HOURS 100
.00 23.20 j 16. GROSS THERMAL ENERGY GEN. (t1WH) 127i3SS.36 604200V.81 156d06601.36 i 'l. GROSS ELEC.-ENERGY GEN. (MWH) 402199.00 1936066.00 S0444829.00
- 10. NET ELEC. ENERGY GENERATED (hWH) 370136.00 1810250.00 47602360.00
- 19. UN]l SERVICE FACTOR 99.07 79.47 72.47
- 20. UN.IT AVAILABILITY FACTOR 99.07 79.47 72.49
- 23. UNIf FORCED OUTAGE RATE
.93 5.35 13.86
- 24. SHulDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
Type 2, October 6, 1983, four week Steam Generator Inspection Outage.
- 25. IF SHUTDOWN AT END UF REPORT PERIOD,- ESTIMATED DATE OF START UP On line
- 26. UNITS IN TEST ST ATUS (PR10R TO COMMERCIAL OPERATION)- FORCAST ACHElVED INITIAL CRITICALIlY INITIAL ELECTRICITY T - --
T- -
s COMMERCIAL OPERATION T- -
T-- --
8307130059 830708 PDR ADDCK 05000261 R
PDR 1.16 a 9 sg
I'~
_A,a.-M-mg.
.nm-Ae
. - = -
K4
-4
}
4-
' ~'='
1
.. -P 2 cf 3 o' bt'e* c8a
)
g,
\\
f, F 'i 'l' H D ! ?
l' A V F P A G I.'. lifiI L Y i TIUE R L E Vf.!
l D O C:: E 1 N!) ; 0':.0-0261 ild! i R 0 P I N::U f! LIN I i' t
IM iE O~l/Ob/P.3 1
C UiiP EIED i t 't ii. h (i ) N Oi&' ! a I E.L Ei'Hui E ( 00 3 )'m ' di J4 l
JUNE.
tY03 i,
Ik l
. s I.,
I k.,
-f,
.,A [
[$
.,. [ },k, f t,
[,
f^,
( M F - f 1 f.' i )
( NUE-(D I)
)
e S
/
g f
'74 4 10
'. 4 0 1
u/
4
}
4
'4,,
- 6 S
_; 4 3 ij
'.K 5
']
I, J 'I 5'l i f/
43
< o ')
i o
v.
n n
'))
i, i
'1 3
' ~, '
30 i
t
[ $ 4.
.,a
- n..,
J.),.-
n
.i i3
';.i ^. >
2u T
14
) n.'
y
-.; h l'i*
%s i6
- ) 4 (.*
f l
l 1 i6 - O i
1 1
s s.
'O
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-261 s,.
UNIT NAME H. B.1bbinson DATE 830701 y
REPORT MONTH June COMPLETED BY H. Rav Norris j
TELEPHONE 803-383-4524 to u
E L
w
.5 ?
3
).E b
Licensee
,E t, o%
Cause & Corrective No-Date i
3:
jj5 Event g7 93 Action to H
y 3 ;ji =
Report a mV 5'
Prevent Recurrence g
u o
06-01 830601 S
0 A
4 HB HTEXCH Power reduction to approximately 80%
due to Steam Generator considerations.
06-02 830622 F
6.67 A
4 CB PIPEXX Faulty pipe fitting'n the loop 3 flow o
transmitter's high pressure sid2 iso-lation valve. The fitting was re-placed. The reactor rmained critical during the shutdown.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Seram.
Event Report (LER) Fde (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F. Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
I sg
s ee ea9
.g CP&L Carolina Power & Light Company H. B.10BINSCN STEAM ELECTRIC PI1NT POST OFFICE BOX 790 IIARTSVIILE, SOUTH CAROLINA 29550
'JUL 81983 Robinson File No:
15505 Serial: RSEP/83-886 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcanent U. S. Nuclear Regulatory Cm mission Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 FENTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Com' herewith subnits the report of operation statistics and shutdown experience for the month of June,1983.
Very truly yours,
/sa
/#t/R.B.S key, Jr.
General Manager H. B. Robinson S.E. Plant HRN/sg Enclosure cc:
R. A. Hartfield (2)
J. P. O'Reilly (1) 6 1 I
_.