Arizona Public Service Company | |||
h | = | ||
h 53 March 22, 1984 7 | |||
Creekside Oaks Office Park | ANPP-29129 -BSK/TRB | ||
Walnut Creek, CA 94596-5368 | 'i U. S. Nuclear Regulatory Commission I | ||
Division of Resident | Region V Creekside Oaks Office Park 4 | ||
1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 i | |||
Attention: Mr. T. W. Bishop, Director | |||
{ | |||
Division of Resident Reactor Projects and Engineering Programs | |||
==Subject:== | ==Subject:== | ||
Time Extension For Report - DER 83-71 A 50.55(e) Potentially Reportable Deficiency Relating To | Time Extension For Report - DER 83-71 A 50.55(e) Potentially Reportable Deficiency Relating To y | ||
Pacific Scientific Shock Arrestors May Have A Generic Defect. | |||
1 File: 84-019-026; D.4.33.2 | |||
==Reference:== | ==Reference:== | ||
(A) Telephone conversation between P. Narbut and R. Tucker on | (A) Telephone conversation between P. Narbut and R. Tucker on October 11, 1983 (B) ANPP-28200 dated, November 8,1983 (Interim Report) | ||
October 11, 1983 | |||
(B) ANPP-28200 dated, November 8,1983 (Interim Report) | |||
(C) ANPP-28580 dated, January 9, 1984 (Time Extension) 3 | (C) ANPP-28580 dated, January 9, 1984 (Time Extension) 3 | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B), | |||
The NRC was notified of a potentially reportable deficiency in | and a Time Extension by Reference (C). At that time, it was estimated 4 | ||
Reference (A), and an Interim Report was transmitted by Reference (B), | that a Final Report would be available by March 30, 1984. | ||
and a Time Extension by Reference (C). At that time, it was estimated | 4 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 27, 1984, at which time a complete report will be submitted. | ||
expected that this information will be finalized by April 27, 1984, at | |||
which time a complete report will be submitted. | |||
There is no new information or change to the Interim Report at this time. | There is no new information or change to the Interim Report at this time. | ||
Very truly .ours, | Very truly.ours, | ||
k.E | } | ||
E. E. Van Brant, Jr. | k.E ctttb (LL P E. E. Van Brant, Jr. | ||
APS Vice President, Nuclear | APS Vice President, Nuclear ANPP Project Director lTyy l | ||
ANPP Project Director | EEVB/TRB:db c c | ||
lTyy | .1, | ||
'' hr (.jS g:g. | |||
d 8404130219 840322 | cc: See Page Two d | ||
I 8404130219 840322 g' 'ECUi PDR ADOCK 05000528 i ! | |||
s eda | |||
/dS~"d 7 | |||
? | |||
Mr. T. W. Bishop | Mr. T. W. Bishop | ||
- DER 83-71 Page Two ec: | |||
W. E. Ide D. B. Fasnacht A. | Richard DeYoung Director Office of' Inspection and Enforcement U..S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr. | ||
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J.-R. | |||
Bynum F. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher | |||
- H. D. Foster | |||
Institute.of-Nuclear Power Operations- | - D. R. Hawkinson | ||
Atlanta, GA 30339. | - L'. E..Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center. | ||
Institute.of-Nuclear Power Operations-1100. Circle 75 Parkway, Suite 1500 i-Atlanta, GA 30339. | |||
7 | 7 | ||
'k[. | |||
{' | p | ||
{' | |||
s 4 | s 4 | ||
N _ | |||
* x | 4 | ||
A | * x A | ||
,e I | |||
J | |||
+^ | |||
9 s | |||
.,.u-e V | |||
...}} | |||
Latest revision as of 13:43, 13 December 2024
| ML20088A849 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/22/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29129-BSK, DER-83-71, NUDOCS 8404130219 | |
| Download: ML20088A849 (2) | |
Text
.. _.
3 ef
_=
m R
=-
Arizona Public Service Company
=
h 53 March 22, 1984 7
ANPP-29129 -BSK/TRB
'i U. S. Nuclear Regulatory Commission I
Region V Creekside Oaks Office Park 4
1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 i
Attention: Mr. T. W. Bishop, Director
{
Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-71 A 50.55(e) Potentially Reportable Deficiency Relating To y
Pacific Scientific Shock Arrestors May Have A Generic Defect.
1 File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and R. Tucker on October 11, 1983 (B) ANPP-28200 dated, November 8,1983 (Interim Report)
(C) ANPP-28580 dated, January 9, 1984 (Time Extension) 3
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),
and a Time Extension by Reference (C). At that time, it was estimated 4
that a Final Report would be available by March 30, 1984.
4 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 27, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly.ours,
}
k.E ctttb (LL P E. E. Van Brant, Jr.
APS Vice President, Nuclear ANPP Project Director lTyy l
EEVB/TRB:db c c
.1,
hr (.jS g:g.
cc: See Page Two d
I 8404130219 840322 g' 'ECUi PDR ADOCK 05000528 i !
s eda
/dS~"d 7
?
Mr. T. W. Bishop
- DER 83-71 Page Two ec:
Richard DeYoung Director Office of' Inspection and Enforcement U..S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J.-R.
Bynum F. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher
- H. D. Foster
- D. R. Hawkinson
- L'. E..Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center.