ML20107L166: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 2: Line 2:
| number = ML20107L166
| number = ML20107L166
| issue date = 01/09/1985
| issue date = 01/09/1985
| title = FOIA Request for SECY-84-378B, Addl Info Re 841106 Briefing on Director'S 2.206 Decision on TMI-1 Emergency Feedwater, as Referenced in Weekly Info Rept for Wk Ending 841130
| title = FOIA Request for SECY-84-378B, Addl Info Re 841106 Briefing on Directors 2.206 Decision on TMI-1 Emergency Feedwater, as Referenced in Weekly Info Rept for Wk Ending 841130
| author name = Knepp A
| author name = Knepp A
| author affiliation = ENGINEERING PLANNING & MANAGEMENT, INC.
| author affiliation = ENGINEERING PLANNING & MANAGEMENT, INC.
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
OfTT) J        engineering planning and managennent inc k                   Point West Offi e Center e Three Speen Street
OfTT) engineering planning and managennent inc k
* Framingham, Massachusetts 01701 * (617) 875-2121 January 9, 1985 Mr. Joseph L. Felton, Director                                           TRC;;OM OF INFORMATION Division of Rules and Records ACT REQUEST Office of Administration U.S. Nuclear Regulatory Commission
J Point West Offi e Center e Three Speen Street
* Framingham, Massachusetts 01701 * (617) 875-2121 January 9, 1985 Mr. Joseph L.
Felton, Director TRC;;OM OF INFORMATION Division of Rules and Records ACT REQUEST Office of Administration
(
(
f ' b--A * [d," 2.J Washington, D.C. 20055                                                     @, ,g j FOIA REQUEST
U.S. Nuclear Regulatory Commission f ' b--A * [d," 2.J Washington, D.C.
20055
@,,g j FOIA REQUEST


==Dear Sir:==
==Dear Sir:==
This is a Freedom of Information Act Request for the following document:
This is a Freedom of Information Act Request for the following document:
SECY 84-378B- Additional Information Relating to the November 6, 1984 Briefing on the Director's 2.206 Decision on TMI-l Emergency Feedwater (11-26-84)
SECY 84-378B-Additional Information Relating to the November 6, 1984 Briefing on the Director's 2.206 Decision on TMI-l Emergency Feedwater (11-26-84)
              "To provide to the Commission the TMI-l emergency feedwater system (EFW) modifications that will be complete prior to any restart, those system modifications which the licensee intends to complete by the first refueling outage after restart or by late 1985 if the plant remains shutdown dur-ing 1985, a summary of EFW system seismic qualification status for the forty operating reactors which were review-ed by the Staff for this issue, and the results of a study conducted to compare the degree to which the eight B&W plants have complied with NUREG 0737."
"To provide to the Commission the TMI-l emergency feedwater system (EFW) modifications that will be complete prior to any restart, those system modifications which the licensee intends to complete by the first refueling outage after restart or by late 1985 if the plant remains shutdown dur-ing 1985, a summary of EFW system seismic qualification status for the forty operating reactors which were review-ed by the Staff for this issue, and the results of a study conducted to compare the degree to which the eight B&W plants have complied with NUREG 0737."
From - WEEKLY INFORMATION REPORT - WEEK ENDING NOVEMBER 30, 1984
From - WEEKLY INFORMATION REPORT - WEEK ENDING NOVEMBER 30, 1984
        - Enclosure Q.
- Enclosure Q.
Please send this information to my attention at the above address. Thank you.
Please send this information to my attention at the above address.
Ve     truly your ,
Thank you.
YA Alice Kne yY Administrative Asst.
Ve truly your,
        /ak 0502280543 840109 PDR kkhP85-23}}
YA yY Alice Kne Administrative Asst.
/ak 0502280543 840109 kkhP85-23 PDR}}

Latest revision as of 01:46, 13 December 2024

FOIA Request for SECY-84-378B, Addl Info Re 841106 Briefing on Directors 2.206 Decision on TMI-1 Emergency Feedwater, as Referenced in Weekly Info Rept for Wk Ending 841130
ML20107L166
Person / Time
Site: Crane 
Issue date: 01/09/1985
From: Knepp A
ENGINEERING PLANNING & MANAGEMENT, INC.
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-85-23 NUDOCS 8502280543
Download: ML20107L166 (1)


Text

.

OfTT) engineering planning and managennent inc k

J Point West Offi e Center e Three Speen Street

  • Framingham, Massachusetts 01701 * (617) 875-2121 January 9, 1985 Mr. Joseph L.

Felton, Director TRC;;OM OF INFORMATION Division of Rules and Records ACT REQUEST Office of Administration

(

U.S. Nuclear Regulatory Commission f ' b--A * [d," 2.J Washington, D.C.

20055

@,,g j FOIA REQUEST

Dear Sir:

This is a Freedom of Information Act Request for the following document:

SECY 84-378B-Additional Information Relating to the November 6, 1984 Briefing on the Director's 2.206 Decision on TMI-l Emergency Feedwater (11-26-84)

"To provide to the Commission the TMI-l emergency feedwater system (EFW) modifications that will be complete prior to any restart, those system modifications which the licensee intends to complete by the first refueling outage after restart or by late 1985 if the plant remains shutdown dur-ing 1985, a summary of EFW system seismic qualification status for the forty operating reactors which were review-ed by the Staff for this issue, and the results of a study conducted to compare the degree to which the eight B&W plants have complied with NUREG 0737."

From - WEEKLY INFORMATION REPORT - WEEK ENDING NOVEMBER 30, 1984

- Enclosure Q.

Please send this information to my attention at the above address.

Thank you.

Ve truly your,

YA yY Alice Kne Administrative Asst.

/ak 0502280543 840109 kkhP85-23 PDR