ML20107L166
| ML20107L166 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/09/1985 |
| From: | Knepp A ENGINEERING PLANNING & MANAGEMENT, INC. |
| To: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| FOIA-85-23 NUDOCS 8502280543 | |
| Download: ML20107L166 (1) | |
Text
.
OfTT) engineering planning and managennent inc k
J Point West Offi e Center e Three Speen Street
- Framingham, Massachusetts 01701 * (617) 875-2121 January 9, 1985 Mr. Joseph L.
Felton, Director TRC;;OM OF INFORMATION Division of Rules and Records ACT REQUEST Office of Administration
(
U.S. Nuclear Regulatory Commission f ' b--A * [d," 2.J Washington, D.C.
20055
@,,g j FOIA REQUEST
Dear Sir:
This is a Freedom of Information Act Request for the following document:
SECY 84-378B-Additional Information Relating to the November 6, 1984 Briefing on the Director's 2.206 Decision on TMI-l Emergency Feedwater (11-26-84)
"To provide to the Commission the TMI-l emergency feedwater system (EFW) modifications that will be complete prior to any restart, those system modifications which the licensee intends to complete by the first refueling outage after restart or by late 1985 if the plant remains shutdown dur-ing 1985, a summary of EFW system seismic qualification status for the forty operating reactors which were review-ed by the Staff for this issue, and the results of a study conducted to compare the degree to which the eight B&W plants have complied with NUREG 0737."
From - WEEKLY INFORMATION REPORT - WEEK ENDING NOVEMBER 30, 1984
- Enclosure Q.
Please send this information to my attention at the above address.
Thank you.
Ve truly your,
YA yY Alice Kne Administrative Asst.
/ak 0502280543 840109 kkhP85-23 PDR