ML20112H818: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
                                                ~
s I      .                                                                                  DOCXIT NO.' ' 50-148 UNIT I
DATE      l-7--85  -
COMPLETED BY        L D. Woodard TF' ** HONE (205) 899-5156
  +
St0NTig      December. 1984                                                    /
DAY        AVERACE DAILY F0WER LEVEL                          DAY        AVERACE DAILY POWER LEVEL (MWe-Net)                                                    (AlWe-Net) g            818                                            g7                      gig 816                                            gg                      820 2
3 816~~~~-                    --------..---_g9_.                        817
~
~
4'           823                                             ;g                     816 821                                             21                     816 3
I DOCXIT NO.' ' 50-148 s
6            821                                             22                     815 7
I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156
823                                            23                     823 g           823                                             ;4                     819 819                                -
+
                                                                                    ,j.                   818' 9
St0NTig December. 1984
817                                                                    685 10                                                           3 777                                                                   820 ll                    1g                                                           27
/
.I                                 604
DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)
;j                   12                                                           3                     gi g 13                                                           29                     816 ll1 605                                                                   815
(AlWe-Net) 818 g
    't               14                                                           30 15           678                                             31 16 817 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to
g7 gig 816 820 2
                  , the ne:re:t whole me;: watt.
gg 816~~~~-
e 8501180055 841231
3
        \
--------..---_g9_.
(DRADOCK 05000348         PDR
817 816
~
4' 823
;g 821 3
21 816 815 6
821 22 823 7
23 823 819 g
823
;4 819 9
,j.
818' 685 10 817 3
ll 777 1g 27 820
.I;j 12 604 3
gi g ll1 816 13 29 605 815
't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to
, the ne:re:t whole me;: watt.
8501180055 841231 e
(DRADOCK 05000348
\\
PDR
:l
:l
      ?
?:{
:{
lil-m
lil-
_              m


OPERATING DATA REPORT DOCKET NO.         Sn un l- / ~D DATE COMPLETED BY           J. D. Woodard TELEPHONE         (2051 899-5156 OPERATING STATUS Joseph M. Farley - Unit 1                            Notes
OPERATING DATA REPORT DOCKET NO.
Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes
: 1. Unit Name:
: 1. Unit Name:
December, 1984                             1) Cumulative data since
Joseph M.
: 2. Reporting Period:                                                        12-1-77, date of commercial
Farley - Unit 1
: 3. Licensed Thermal Power (MWt):         2652 860                                Peration.
: 2. Reporting Period:
December, 1984
: 1) Cumulative data since 12-1-77, date of commercial
: 3. Licensed Thermal Power (MWt):
2652 Peration.
860
: 4. Nameplate Rating (Gross MWs):
: 4. Nameplate Rating (Gross MWs):
829
829
: 5. Design Electrical Rating (Net MWe):                                                     ,
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):           RAI R
RAI R
: 7. Maximum Dependable Capacity (Net MWe):             797 1
: 6. Maximum Dependable Capacity (Gross MWe):
797 1
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
N/A N/A
: 9. Power Level To Which Restricted,1f Any (Net MWe):                   N/A
: 9. Power Level To Which Restricted,1f Any (Net MWe):
: 10. Reasons For Restrictions. If Any:           M/A d
: 10. Reasons For Restrictions. If Any:
O                                                               This Month           Yr.-to Date             Cur'nulative
M/A d
,        11. Hours In Reporting Period                                   744                 8,784                   62,112
O This Month Yr.-to Date Cur'nulative
: 12. Number Of Hours Reactor Was Critical                        744.0               7,005.8                 42,129.0 0.0                     0.0                 3,650.0
: 11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0
: 13. Reactor Reserve Shutdown Hours l       14. Hours Gecerator On.Line                                     744,0               6.921.0                 41.024.4 l
: 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
: 15. Unit Reserve Shutdown Hours                                   0.0                     0.0                       0.0
: 13. Reactor Reserve Shutdown Hours l
: 16. Gross Thermal Energy Generated (MWH) 1,898,787           17,799,049           103,900,575 Ata 9An            5,751,304           33,094,314                 !
: 14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
: 16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314
: 17. Gross Electrical Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)                 585 848           5 427 984           '41 179 046
Ata 9An
: 19. Unit Service Factor                                         100.0                   78.8                       66.0
: 18. Net Electrical Energy Generated (MWH) 585 848 5 427 984
: 20. Unit Availability Factor                                   100.0                    78.8                      66.0
'41 179 046
: 21. Unit Capacity Factor (Using MDC Net)                         on a                   77.5                      62.9
: 19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0
: 22. Unit Capacity Factor (Using DER Net)                         9s n                   76 s                       An:s
: 20. Unit Availability Factor 77.5 62.9
: 23. Unit Forced Outage Rate                                       0.0                     1.I                     13.2
: 21. Unit Capacity Factor (Using MDC Net) on a
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. .and Duration of Each):
: 22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
: 23. Unit Forced Outage Rate 0.0 1.I 13.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each):
Refueling / maintenance outage, 4/">/85, approximately 5 weeks.
Refueling / maintenance outage, 4/">/85, approximately 5 weeks.
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:         N/A
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                         Forecast               Achieved 08-06-77               08-09-77
N/A
(                              INITIAL CRITICALITY INITIAL ELECTRICITY                                       08-20-77               08-18-77 COMMERCIAL OPERATION                                      12-01-77               12-01-77 W/77)
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
(
INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77)


                                                                        ~=_n...
a -
                                                                    ~
L..-
~
~=_n...
~
i
i
                                                                                                                                    ~
~
      -- -- ....          a -            -
L..-                                              '
                                                                                                                  ~  ,-:                  .            --
l l.
l l.
l 3                                                                              -
3 l
I)OCKETNO.           50-148         -
UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO.
UNIT SilulDOWNS AND POWER RElHX'TIONS l
50-148 l
UNIT NAME J.M. Farley - Unit 1 l                                                                                                                                                DATE       l-7-85 NEPORTMONTig December                                COMPLETED sY J. D. Woodard TELEPalONE (205) 899-5156 i
UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l
                                                                            ,,g                             _
COMPLETED sY J.
s:      re      o se E
D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i
                                              ~
,,g o se E
                                                      .23       8     gE'g         Licensec       Ev,     h*l,                     Cause & Cuneceive No.         1)ete       k     gg       g     .c gx        Event
.23 8
(?                                     Actiini tu E
gE'g Licensec Ev, h*l, Cause & Cuneceive s:
o3         M     ji5g         Repost #   ,
re
MU          ]                      PICvent l(ccussence 6
~
005       841211           F         0     A         4       N/A               SD         M0       Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.
No.
l' l                     2                                                     3                                     4 F: Fusced             Reason:                                               Method:
1)ete k
S: Stheduled                                                                                                      Exhibit G - Instsuctions A-Equipment Failuse(Explain)                         1 -Manual 4                                                                                                                                    for Prepasatiem ofI).ata n Maintenance of Test                                 2 Manual Scram.                       Entiy Sheets fos I.icensee C-Refuchug                                           3 Automatic Scram.                   Event RepiwI(l.Elt) File tNUREG.
gg g
D-Regulaisuy Restsiction .                           4 04hes (Explain)                     0161)
.c g x Event
E-Opesaios Tsaining & license Examination F- Administ salive                                                                       5 G Ope ational Enus (Explain)
(?
]
Actiini tu E
o3 M
ji5g Repost #
PICvent l(ccussence MU 6
005 841211 F
0 A
4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.
l' l
2 3
4 F: Fusced Reason:
Method:
Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4
n Maintenance of Test 2 Manual Scram.
Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram.
Event RepiwI(l.Elt) File tNUREG.
D-Regulaisuy Restsiction.
4 04hes (Explain) 0161)
E-Opesaios Tsaining & license Examination F-Administ salive 5
G Ope ational Enus (Explain)
ExInbit 1 Same Sousee
ExInbit 1 Same Sousee
('#/17)                   11 Othes (Emplain) 1 4
('#/17) 11 Othes (Emplain) 1 4


h t
h t
l.* '   Malling Address                                                                                 ;
l.* '
* Allbams Power Company 600 North 18th Street
Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641
  >                  Post Office Box 2641
' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
                  ' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding                                                     AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.         20555
20555


==Dear Sir:==
==Dear Sir:==
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
If you have any questions, please advise.
Yours very rul       x '
Yours very rul x
                                                                                  /     ..
/
R. P. Mcdonald l                 RPM /KWM: sam
R. P. Mcdonald l
(                 Enclosures xc: Director, IE (10 copies)
RPM /KWM: sam
Director, RII       (1 copy) 1 l
(
Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) 1 l
l l
l l
l g
l g
o, t
o, L
L
t


i
i
                                    ' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  
' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.           Power was reduced following failure of
OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.
;            a bearing on the 1A condensate pump motor.
Power was reduced following failure of a bearing on the 1A condensate pump motor.
4 The following major safety-related maintenance was performed in the month of December:
The following major safety-related maintenance was performed in the 4
: 1. Performed miscellaneous corrective and preventive maintenance on diesel generators.                                                                   >
month of December:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
1
1
'l i
'l i
4
4
                                                                -        ,      . - . -      .,      , , , .}}
,,,.}}

Latest revision as of 00:35, 13 December 2024

Monthly Operating Rept for Dec 1984
ML20112H818
Person / Time
Site: Farley 
Issue date: 12/31/1984
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8501180055
Download: ML20112H818 (5)


Text

-

~

I DOCXIT NO.' ' 50-148 s

I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156

+

St0NTig December. 1984

/

DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)

(AlWe-Net) 818 g

g7 gig 816 820 2

gg 816~~~~-

3


..---_g9_.

817 816

~

4' 823

g 821 3

21 816 815 6

821 22 823 7

23 823 819 g

823

4 819 9

,j.

818' 685 10 817 3

ll 777 1g 27 820

.I;j 12 604 3

gi g ll1 816 13 29 605 815

't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to

, the ne:re:t whole me;: watt.

8501180055 841231 e

(DRADOCK 05000348

\\

PDR

l

?:{

lil-m

OPERATING DATA REPORT DOCKET NO.

Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph M.

Farley - Unit 1

2. Reporting Period:

December, 1984

1) Cumulative data since 12-1-77, date of commercial
3. Licensed Thermal Power (MWt):

2652 Peration.

860

4. Nameplate Rating (Gross MWs):

829

5. Design Electrical Rating (Net MWe):

RAI R

6. Maximum Dependable Capacity (Gross MWe):

797 1

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions. If Any:

M/A d

O This Month Yr.-to Date Cur'nulative

11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours l
14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314
17. Gross Electrical Energy Generated (MWH)

Ata 9An

18. Net Electrical Energy Generated (MWH) 585 848 5 427 984

'41 179 046

19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0
20. Unit Availability Factor 77.5 62.9
21. Unit Capacity Factor (Using MDC Net) on a
22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
23. Unit Forced Outage Rate 0.0 1.I 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each):

Refueling / maintenance outage, 4/">/85, approximately 5 weeks.

25. If Shur Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

(

INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77)

a -

L..-

~

~=_n...

~

i

~

l l.

3 l

UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO.

50-148 l

UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l

COMPLETED sY J.

D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i

,,g o se E

.23 8

gE'g Licensec Ev, h*l, Cause & Cuneceive s:

re

~

No.

1)ete k

gg g

.c g x Event

(?

]

Actiini tu E

o3 M

ji5g Repost #

PICvent l(ccussence MU 6

005 841211 F

0 A

4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.

l' l

2 3

4 F: Fusced Reason:

Method:

Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4

n Maintenance of Test 2 Manual Scram.

Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram.

Event RepiwI(l.Elt) File tNUREG.

D-Regulaisuy Restsiction.

4 04hes (Explain) 0161)

E-Opesaios Tsaining & license Examination F-Administ salive 5

G Ope ational Enus (Explain)

ExInbit 1 Same Sousee

('#/17) 11 Othes (Emplain) 1 4

h t

l.* '

Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641

' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very rul x

/

R. P. Mcdonald l

RPM /KWM: sam

(

Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) 1 l

l l

l g

o, L

t

i

' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.

Power was reduced following failure of a bearing on the 1A condensate pump motor.

The following major safety-related maintenance was performed in the 4

month of December:

1.

Performed miscellaneous corrective and preventive maintenance on diesel generators.

1

'l i

4

,,,.